Post Job Free
Sign in

Electrical Manager

Location:
Houston, TX
Salary:
$45.00 hr
Posted:
November 08, 2014

Contact this candidate

Resume:

William “Preston” Eiland

*Home: **** Briarcliff Drive, Moss Point, MS 39562 *

(Home: 228-***-****), (Cell: 228-***-****)

*E-mail address: Home – ********@***.***

QA/QC Inspector / Quality Manager I&E Civil/Structural / QA/QC Manager / Electrical

Superintendent / QA/QC Inspection Engineer / Electrical Maintenance Manager

Marine / Industrial / Manufacturing / Construction / Operations / Turn-Arounds / Major Projects

Reliable & thorough, with excellent job attendance and safety records

Able to comprehend, interpret, and implement job instructions, guidelines, and specifications

Work independently and interact successfully in team setting

Knowledge of Union Standards and Practices on job sites

Comprehensively trained and experienced in the QA/QC field with heavy Industrial and Marine background(s)

specializing in:

o NEC codes and documentation. FDA Standards

o Inspection Test Procedures / Drawings & Specifications / Purchasing

o Planning & Scheduling / Construction Tracking / Reporting

o As-Built Documentation / Motors / Mechanical Equipment

o Motor Control Centers /Switchgear / Control Wiring / DC Systems

1.5 MVA (Y) Power Plant Distribution & Sub Stations / Generators

o Sub-Submersible Ballast Controls / Derrick Drilling Equipment Controls

o Millwright consisting of alignment of motors & generator sets and setting of various types of equipment

in all phases of construction

o Marine & Industrial, HVAC and all Mechanical Works

1973-1976 US Army Vietnam Veteran; 1976-1979 Electrical Training Program Government Contracts USA Inspections,

Commissioning and Signoffs for Navy and Subcontractors; 1979-1985 General Foreman Assigned to Warranty Tech

support Electrical Division - Masonic Lodge #419- Pascagoula, MS

Career Summary & Selected Accomplishments;

KBR BOP Project Aug – 2013- Present

E&I Inspections Through out Project to include Pressure vessels, Heat tracing,P&ID etc. along with inspections

of all electrical including Sub Stations and all field componets.

E&I QA/QC Inspector Diamond Offshore Feb- Aug- 2013

Daily Inspections consisting of all E&I systems for Rig performance. Review and update

Test procedures, ITP`s and follow up of NCR`s compliance. Reporting updates on a daily

Bases to all supporting Team members. Rig based in Brownville, Tex. For upgrades.

Electrical Speacialist;2012 - 2013

TransOcean, Carry out Inspections & Test procedures All E&I phases on

Sedco 707 Sub. Rig based in Brownsville Texas for repairs

QA/QC Area Inspector, Shell-Albian Sands Project (Canada), 2009 – 2011

Commissioning & inspections of pipe spools, heat exchangers and various types of control valves existing in the Froth &

Extraction areas in the mining industry field. Daily inspections & testing of Piping, PSV’s high & low pressure fluid

control systems, hydro test, gate valve controls, writing test reports & coordinating field inspections with contractors and

Shell representatives. Understanding the Scope of work process, and reviewing of all inspection reports.

QM I&E, Civil/Structural, Proctor & Gamble Paper Plant, BE&K (Utah) & Government Contracts, Gulfport (MS)

2008 – 2009. Inspections; consisting of various concrete installations along with electrical power supplies and

equipment for paper plant operations. Writing of ITP`s and Inspection reports daily as project progresses. Daily reviews

of sub-contractors QA Department’s reports & inspection call outs along with inspections perform by QM Team.

Coordinate signoffs between client & subcontractors and also keep logs of all work performed to include NCR`s, Scope

of Work, ITP`s, Test Reports, Signoffs, Construction layouts and Project changes. Ground excavating and tie ends for

power, water & air transfers.

QM Inspector, I&E, Chevron Refinery – Coker Plant (MS) May – September 2008.

Inspections: consisting of Instrumentation, and Electrical MOVS, transmitters, conduit, all stages. Loop shots, megging

on various systems in the plant. Also inspections to include Sub-station power support and various electrical systems.

Coordinate signoffs between clients & subcontractors. Perform inspections to include alignment of AC & DC motors as

per Millwright specifications. Perform shaft alignment on shaker house at Coker Plant using laser light systems. Visual

inspection of shaft alignment on pump motor, generator sets shaker motor, MCC cabinets and setting of new Equipment.

QA/QC Manager / Electrical Superintendent, Offshore Inland (AL) 2007 – 2008.

QA Manger: documentation of inspections on welding, piping and structural for all on-going projects. Settings up

welding tests, VT, UT, and X-ray shots. Coordinate and log daily inspections, sign offs with client representative.

Material traceability, Welding Certifications MPT/NDT & work packages put together for client. Keeping updated with

the latest ABS / DNV Standards.

W. P. Eiland

Resume’ – Page 2

Electrical Supt: Maintaining Dockside services for Contractors and Clients. Assigning daily work schedules for

employees. Daily log kept on all work performed at shop and various sites. Perform Maintenance on Electrical

Equipment.

QA/QC Inspection Engineer, Signal International (MS) 2006 – 2007

QA/QC inspections in the Oil Drilling industry for multiple sub-submersible drilling platforms located in southern

Mississippi. Responsibilities were complete inspections on a daily basis according to the project specification for

Electrical, Mechanical, Piping, and Welding. Coordinator between contractors and clients for questions and guidance on

Power Distribution Systems for the entire Drill Rig. Visual inspection of alignment of all AC&DC motors and any

electrical equipment .using micro meters & laser systems before and after installation. Monitored bearing temperature.

.

QA/QC Site Project Manager, Kellogg-Brown & Root (MS) 2005 – 2006

Subcontracts and QA/QC Inspector for Stennis Space Center, Gulfport Naval Seabee Base, and Naval Station

Pascagoula Sites. Responsibilities were coordination between the U.S. Navy and the Electrical & Mechanical

subcontractors for Naval housing & buildings post hurricane Katrina Gulf Coast and hurricane Wilma Florida Keys

rebuild. Daily inspections, status reporting, and contract negotiations were among other areas of work performed. Install

and commissioning of new Power Plants and backup generator systems.

Electrical Maintenance, VT Halter Marine (MS) 2002 – 2005

Responsibilities consisting of contract expansion upgrades and maintaining the fabrication facilities cranes, welders (All

Types), HVAC systems, lighting, and documentation. Conducted Commissioning Trial runs on ships at port and sea,

trouble-shooting the various systems. Follow up Warranty issues and services.

Electrical Maintenance Manger, Hopeman Brothers Marine Fabrication (MS) 2000-2002

Responsibilities consisted of maintenance documentation for all equipment on a monthly and yearly basis including

materials and repair parts purchases. Providing support for construction departments and performing Audits weekly and

monthly. Installed and documented Maintenance Program for users and operators.

Superintendent Electrical, Ingalls Marine & Industrial Services (MS) 1976 – 2000

Installation, commissioning and maintenance of General Electric and Siemens Power Stations & Substations.

Controlling dockside services and shore power for Naval facilities & Power Distribution throughout construction site.

New construction of GE Power Station for Home Port at Naval Station Pascagoula. Setting up and tying in power grids

for all power distribution centers throughout facility. Shore Power, Waste Water Treatment Plants, Pumping Stations and

Building Lighting and Equipment also on Site.

References on Request:

Woody Deihl 504-***-****

Tim Delmas 281-***-****

Adrian Polazoni 228-***-****

Micky Baldwin 832-***-****

David Defranchesca 228-***-****



Contact this candidate