CURRICULUM VITAE

CURRICULUM

Muhammad Zaid Haritsah,S.T

Name

Mobile Phone +62812.8888.1887 or +628190.88888.71

Private Email ****************@*****.*** / ****.********@**********.***

Office Email ****.********@**********.***

Sex Male

Marital Status Married

Jakarta, February 09th 1985

Place/date of birth

Jl.Cempaka Baru VI no 43.RT 010/007 Jakarta Pusat

Contact Address Kec.Kemayoran Kel.Cempaka Baru

ZIP/Postal Code 10640

Religion Moslem

ID Number 317103.090285000.5

NPWP 44.528.188.4-027.000

Passport Number A 9042555 ( date of expiry 03 September 2019 )

Nationality / ethnic Indonesian

FORMAL EDUCATIONS

Elementary School

Sekolah Dasar Negeri 01, Jakarta Pusat

(1991 – 1997)

Junior High School

Sekolah Menengah Pertama Negeri I83, Jakarta Pusat

(1997 – 2000)

Senior High School Sekolah Menengah Umum Negeri 05, Jakarta Pusat

(2000 – 2003) Major in Natural Science

UNIVERSITAS TRISAKTI

University

Electrical Engineering, major in Telecommunication, 3.19 GPA

(2003 – 2008)

Scale 4

TRAINING,COURSE & ORGANIZATION

Member of ITAPPI IKATAN TENAGA AHLI PENGENDALI PROYEK INDONESIA

( ITAPPI )

Member of Department Social Politic, Member of Department Social Politic, Kepresidenan Mahasiswa

Kepresidenan Mahasiswa Trisakti Trisakti,Jakarta as Advisory July'2006 -January 2008

STAAD PRO V8i & STAAD Successful Certification test results STAAD PRO V8i and STAAD

FOUNDATION FOUNDATION is issued by EDP Media. with a passing grade A

1 of 12

Certificate Of Excellent as a Trainer in House Training Project

Planning & Controlling Using Primavera Project Management

Enterprise 6.7 Conduct By PT. Ferrostaal Indonesia

Introduction to Construction Project Management.

Introduction Scope of Work Primavera.

Defining the Enterprise Project Structure (EPS).

Defining the Organizational Breakdown Structure (OBS).

Defining a Work Breakdown Structure (WBS).

Defining and Specifying Display Layout Worksheet.

Defining the Toolbar, the Formatting Bar, Time Scale and Filter.

CERTIFICATE OF EXCELLENT

Defining and Determining the Project Calendar and Hours of Work.

PRIMAVERA PROJECT

Defining and Creating Activity and Duration of Activity.

MANAGEMENT ENTERPRISE 6.7

Defining and Determining the Relationship between Activity.

Defining and Determining Project constraints (Constraints).

Defining and Determining the Baseline Project.

Baseline Project Comparing the Current Project.

Defining and Entering Resource on each activity.

Project Analysis based on the Resource Usage Profile and Spread Sheet

Analysis of Projects by Activity Usage Profile and Spread Sheet

Project Analysis based on the Resource Profile (S-Curve).

Presenting Diagrams and Curve Development Project.

Flatten Placement Resource Distribution (leveling).

Updating Project Progress Plan

Updating Actual Project (Tracking).

Project Management and Control based on Earned Value Method.

Perform Import & Export.

Present the Project Report (Project Report).

Certificate Of Excellent as a Trainer in House Training Project

Planning & Scheduling Using Microsoft Project Planning Conduct

By PT. Ferrostaal Indonesia

Introduction to Construction Project Management.

Introduction Scope of Work In Microsoft Project Planner 2007.

Defining a Work Breakdown Structure (WBS).

Defining and Specifying Display Layout Worksheet.

Defining the Toolbar, the Formatting Bar, Time Scale and Filter.

Defining and Determining the Project Calendar and Hours of Work.

Defining and Creating Activity and Duration of Activity.

CERTIFICATE OF EXCELLENT

Defining and Determining the Relationship between Activity.

MICROSOFT PROJECT PLANNER

Defining and Determining Project constraints (Constraints).

2007

Defining and Determining the Baseline Project.

Baseline Project Comparing the Current Project.

Defining and Entering Resource on each activity.

Project Analysis based on the Resource Usage Profile and Spread Sheet

Analysis of Projects by Activity Usage Profile and Spread Sheet

Project Analysis based on the Resource Profile (S-Curve).

Presenting Diagrams and Curve Development Project.

Flatten Placement Resource Distribution (leveling).

Updating Project Progress Plan

Updating Actual Project (Tracking).

Project Management and Control based on Earned Value Method.

Present the Project Report (Project Report).

For successful completion of the Alstom E-Learning, Check absence of

BESA ( Electrical Safety ) voltage before working on electrical part

Basic Electrical Safety Awareness (BESA) module,Certificate by

Alstom

Building Costumer Centric Culture, Carrier & Competency (CCR )

SCHNEIDER CERTIFICATION Plug-in to Schneider Electric: New Employee Curriculum

Giving and Receiving Feedback

PLC ( Programmable Logic Controller ) Successful completion PLC Training and certification prepare by

Trisakti University

For successful completion of the Alstom E-Learning, Check absence of

WESA ( Electrical Safety ) voltage before working on electrical part

2 of 12

Basic Electrical Safety Awareness (WESA) module,Certificate by

Alstom

To Equip Participants with 5 Practices of Strengthening Engagement will

build a strong indirect guqrantee for growth & Success of the employee

and the organization :

Strengthening Engagement Training Discover your self

Foundation Of Leadership Appreciated Constituents

Develop Capacity

Serve a Purpose

Sustain hope

on 16 - 18 July 2012 at Grand Hotel Kemang prepare by Alstom

Indonesia

Certification of Completion e-Ethics Alstom Code of Ethics Certification by Alstom University on March

19,2012

EHS (The Basic of Environment, Discover Environment, Health and Safety. Certification by Alstom

Health and Safety ) University on March 19,2013

What is change for yourself and for the company

Style of management & Evaluation of one style

Managing Change & Coaching Managing change & Coaching

Training Interpersonal communication ( How to develop trust and join to other

world.

Multicultural management, Improving team performance

Basic of efficient team work

Detection potential evaluation of competencies

Action Plan for my team improvement

Appraisal process, evaluation, fixing goal, planning, and following the

progress

The difference kinds of motivation and how to detect them

Evaluation of program

Conducted by AREVA T&D Management Skill

Training Primavera Project Planner and Microsoft Project Planner 2007,

ITTAPI ( Ikatan Tenaga Ahli Pengendali Project Indonesia ) At

Batangtoru Martabe Gold Mine Project PT. AUSENCO Mineral

2011. Scheduling 150 KV Transmission Line & Switchyard Area.

Adopt a project management methodology and use it consistently

Implement a philosophy that drives the company toward project

management maturity & communicate it to everyone

Commit to developing effective plans at the beginning of each project

Minimize scope changes by committing to realistic objectives

P3 .Primavera Project Planner, and Recognize that cost & schedule management are inseparable

Microsoft Project Planner Established the timing after the sequence of jobs has been planned

Make adjustments in project duration

Establish a calendar schedule

Time estimates, Timing calculation, scheduling,Updating & Reporting

Risk Analysis

Baseline and Monitoring Deviations from Plan

Implementations Tools of Microsof Project & Primavera

Work Breakdown Structure and Leveling

Planning For Integrated Estimating, Budgeting and Scheduling

HSES Safety Induction and Full Training (PT AGINCOURT

RESOURCES)

Safety Full Induction for High Voltage Transmission ( PT AUSENCO

SAFETY GOLD MINING MINERAL 2011)

TRAINING PPE & Safety Eye Training (PT AGINCOURT RESOURCES 2011)

Environmental Awareness Training ( PT AGINCOURT RESOURCES

2011)Fall Protection ( PT INDOMUDA SATRIA INTERNUSA 2011 )

Leadership Foundation Training (PT INDOMUDA SATRIA

LEADERSHIP TRAINING INTERNUSA at Batang Toru Medan 2011 ) Manager Leadership

Training

PT INDOMUDA SATRIA INTERNUSA

Introduction PASOLINK Equipment

PDH/SDH Radio Relay Transmission Equipment

3 of 12

PASOLINK NEC - TRANSMISSION STM ( Synchronous Transport Module )

System configuration variation (1+0, 1+1 (HS), 1+1 (HS/SD), 1+1

Optimal configuration by frequency and transmission capacity

PT.CENTFOR TECHNOLOGY INVESTMENT. LTD

Conducted From, 15 - 19 June 2009

Site Finding. Path Loss Calculation, Radio Design

Mini-Link High Equipment RAU,MMU,SAU, Antenna, AMM, TRU

MINI-LINK PDH & SDH ( Traffic Unit )

TRANSMISSION Training Implementation,Measurement

Ericsson Equipment Maintenance (1+0, 1+1 (HS), 1+1 (HS/SD), 1+1

PT. EXCELCOMINDO PRATAMA, With Score : 89 Scale 100

Conducted From, 15 – 19 May 2006

LBPP- LIA( Lembaga Bahasa & Pendidikan Profesional

Conversation in English Higher LIA )

Intermediate Level Issued in Jakarta on March 29 – 2007, Certificate

00496/CV- 4/ I /07/KG

Be Able to design Number of light /Lamps on Required

Coordinate

to meet Lux Level Requirement

Be Able to Define Lighting zone based on maintenance

LIGHTING DESIGN and purposes and

CALCULATION Style of maintenance

Be able to define type / character of LV cable to meet

requirement

such in flame able, voltage drop

Internal Training conducted by Alstom on 14 April 2013

(AIS, GIS) Technology

Interior/ExteriorType intérieur/extérieur

Neutral Earthing System

Number of Circuit Breakers

Number of Disconnectors de sectionneurs

GENERAL POINT SWITCHGEAR Number and rating of Power Transformers

Number and position of Current Transformers

Switchgear Topology

Bus coupling (busbar connect the various feeders)

Breaker coupling (CB connect the various feeders)

Internal Training conducted by Alstom on 12 February 2011

Transport and distribution of electrical energy

AIS advantages, GIS advantages

GIS current range

Aluminium alloy enclosures provide following advantages

compared to steel enclosures

Effective SF6 sealing

Triple-sealing gasket provides perfect tightness

High Performance Insulators

CB Spring Operated Mechanism

GIS ( Gas Insulated Substation)

GIS F35Disconnector / Earthing Switch

Basic Knowledge

GIS Type F35 Assembly and site erection

GIS main characteristics nominal voltages

72.5 kV, 145 kV, 220 kV, 400 kV, 550 kV

short-circuit current for 3 sec 31.5 kA, 40 kA, 50 kA, 63 kA

nominal current 2500 A, 3150 A, 4000 A, 6300 A

three phase or single phase encapsulated

F35 three phase encapsulated

B65, B105, T155 single phase encapsulated

Internal Training conducted by Alstom on 18 July2013

CDMA 2000 - 1X EVDO Introduction to CDMA 2000 -1X

Introduction to EVDO

EVDO Interface & Protocol, EVDO Session Configuration

EVDO Air Interface Fundamentals

EVDO Forward Link Operation

4 of 12

EVDO Reverse Link Operation

Power Control & Mobility

EVDO Deployment & CDMA 2000 Interoperability

EVDO End to End Scenario

EVDO Provisioning, Installation and Demo

INDOSAT Network Visit ( CDMA 200- 1X, EVDO & Jatiluhur

Earth Station )

PT.INDOSAT, Certificate No.572/100-IAD/HRD/06

Conducted From, 10 March – 12 March 2006

Occupational l Safety and Health

OSHAS 18001, SMK3 ( Safety Management System )

ISO 9001, Lead Auditor, FIRST AID

OSHAS 18001 - 1999 & ISO 9001 Telecom Safety / A K3

PT. CENTFOR TECHNOLOGY INVESTMENT. LTD

Conducted From, 25 May – 02 June 2009

DSNG Codec Introduction

Main Operating Voltage and Fusing

Multiplexer base band Modulator

MPEG-2 Video Encoder Connector RS 232

IF Modulator

Digital News Satellite Gathering

NDS E5190 Installation and Operation

PT. METRO TV NEWS on June 2010

MPEG-4 Architecture

Comparison 1 Channel 8 Mhz Bandwitdh

SFN ( Single Frequency Network ), DVB-T/H

Exciter/modulator TE9000E5 with seamless switching and adaptative

pre correction

N+1 control systems

Regenerative Microtransposers

Digital Television Transmission Web Server and GPRS for remote control

DVB 3G generation of Echo Cancellers

Adaptation to other standards of DTT

Transmitters ISDB-T/TB, ATSC

Transposers ISDB-T/TB with Dinamic Echo Canceller

Adaptations to : MediaFLO (EEUU) and T-DMB (Korea)

Evolution to the new Europe standard of DVB-T2

Liquid cooling high power transmitters

PT.METRO TV NEWS - EGATEL on September 2010

TECHNICAL SKILL

5 of 12

Network/Site Optimization / Mobile Network Parameter:

Gathering network information and network current key performance from BSS, setup information database from

OMC ( KPI,CDR,CSSR,HoSR,Traffic), drive testing, h/w and s/w trouble shooting, using the following tools: TEMS

Investigation, Map info, Spectrum Analyzer, providing network optimization solutions (capacity re-dimensioning,

antenna adjustment/re-orientation, parameter changing, frequency and database tuning, site relocation and TRX/site

adding, etc.)Handover strategy, EFR/FR/HR TCH.Spectrum Analyzer, Network Analyzer. Bandpass Filter

Configuration Setting,IOX,

Mechanical & Electrical

Erection Installation HV Equipment for AIS ( Air Insulated Substation ) 70 kV,150 kV, 275 kV, 500 kV, Lightening

arrester, Dis connector Switch, Circuit Breaker, Current Voltage Transformer, Post insulator, stringing isolator busbar

protection, Earthing switch installation and calculation., NGR Installation, Marshaling Kiosk Installation, Line Trap

installation, wiring LV cable and MV cable, Bcc cable, Scada Telecommunication installation, point to point

configuration, Band pass filter configuration for Transmitter and receiver microwave.

Building Construction ( Civil Work )

Foundation Work for Substation and Switchyard for 150,275,500 Kv

Control Building Work

Advising the workers on the construction process and addressing their concerns

Solving construction problems as soundly as possible

Informing their employer and the general public on the construction progress

Conducting surveys on the sites where the construction is to take place

Acting as the quality control and assurance to ensure that the project objectives are met

They ensure that all the construction safety rules and regulations are being observed.

Obtaining the construction materials and verifying them

Laying down the preferred construction methods

Ensuring that the project starts on time and ends within the estimated duration

COMPUTER SKILL

Familiar Using Windows Operating System, LINUX Operating System,Internet, E-Mail, Microsoft Office,

Microsoft Visio, Photoshop Cs 2, Adobe acrobat reader,Microsoft Project 2003,2007, 2010,P3 & Primavera Project

Management Enterprise P6.7, STAAD PRO V8i.S, IBM Lotus Note

TEMs Investigation 8.03, Map Info 8.5, ZTE Net-Nument, CNO2, GPS

JOB EXPERIENCES

Time Period February 2014 – Present

1

Title Senior Project Planner

2

Company PT. Ferrostaal GmbH

3

Reason For Leaving -

4

• Responsible For all Project controlling, Planning & Scheduling For Project :

Duties /Jobs description

5

- JMI-Iron Sand Concentrator Plant at ( Yogyakarta )

Nuudelchin_Iron Ore Beneficiation Ulziit Ovoo at

( Mongolia )

CNG Module Supply at ( PGN - Indonesia)

Petro Chemical Project at Bintuni ( Irian Jaya )

Preliminary Hosana Silica Sand Project

Oyuni Oundra Arbayan Benefication Project

• Progress monitoring activity to achieve an “on-time” and progress review to assure

quality and adherence to requirements of contract documents

• Controlling – uses data from monitor activity to bring actual performance to

planned performance

• Monitoring – collecting, recording, and reporting information concerning project

performance that to President Director and Project Director.

6 of 12

• S-Curve Calculation & Manpower Loading Estimation

• Cash Flow Estimation for Loading Equipment Schedule.

• Risk Analysis, WBS (Work Break Down Structure), Critical Items Analysis,

Estimate Time Duration, Recognizing Problem, and Identifying Constraint.

• CPM ( Critical Patch Method ) and Program Evaluation & Review Technique

( PERT ) Network Diagram Analysis for All Project Activity

• Directs and supervises own Team at Project Site and Engineering Activities at

Project Site, Managing All of Activities Sub-Contractor & Client

JOB EXPERIENCES

1 Time Period 29 October 2013 – February 2014

2 Title Site Manager

3 Company PT. SCHNEIDER INDONESIA

4 Reason For Leaving Project Has Been Completed Well

• Supervise and managing all of internal and external team, and daily worker ( Client,

5 Duties /Jobs description

Schneider Team, Subcontractor Team )

• Make planning to work for daily workers ( MS Project 2007 )

• Provide JSEA (Job Safety Enviroment Analisys) and coordinate with safety officer

before start working, and Tool box meeting every day

• Responsible trouble shooting for motor starting, speed sensor, electric

control/wiring diagram, variable speed drive, thermocouple, level transmitter,

resistant temperature detector, compressor, local control station, power outlet,

lighting, electric portable tools, air conditioning, fire system, etc.

• Meeting with sub contractor about electrical development / project.

• Check all circuit connections are tight such as, circuit breaker, busbar, at contactors,

CT”s and protection relay

• Check the main earth connections are tight and the earth testing has been complete

as described in the earth installation procedure

• Monitoring & checking standard installation as per project specification

• Discuss with engineering about drawing specification & progress

• Create daily, weekly, monthly Report and S-Curve Tracking to Project Manager and

Client.

• Termination cable motor, MCC, PLC, Transformer, Instrument field and Junction

box, COS Panel For QCC

JOB EXPERIENCES

1 Time Period 1 January 2011 – 28 October 2013

2 Title Site Supervisor Erection and Commissioning

3 Company PT. ALSTOM INDONESIA

4 Reason For Leaving - Schneider Indonesia Recruitment

5 Package 8 Project Procurement and Installation of 11 Bays Transformer 150/20 KV at GI

Serang, GI Cilegon, GI Cibadak Baru, GI Lembursitu, GI New Balaraja, GI Tangerang

Lama, GI Sepatan, GI Durikosambi, GI Cikupa, GI Depok III, GI Lippo Curug, with

contract no. 352. PJ/611/P3B/2010 Date 30 December2010

1. Reviews and monitors project progress to assure quality and adherence to

requirements of contract documents

2. Avoid all that dangerous in site

3. Directs and supervises own Team at Project Site and Engineering Activities at

Project Site, Managing All of Activities Sub-Contractor & Client

4. Assists in the coordination of pricing, estimating, scoping strategies for proposed

projects and in the development and preparation of technical specifications

Create Site Plan Schedule using software Microsoft Project Planner 2007 and P3 Primavera

Project Planner For Apparatus Foundation and Switch Yard / Switch Gear area

LA,CT,CB,DS,CVT,DSE, PI, Control buiding, and Transmission Line 150 KV

6 10 GW Package 3 Kemayoran Project 2 Bays Transformer with additional work A03

Amendment.

1. Reviews and monitors project progress to assure quality and adherence to

requirements of contract documents

2. Assists in the coordination of pricing, estimating, scoping strategies for proposed

projects and in the development and preparation of technical specifications

3. Avoid all that dangerous in site

4. Directs and supervises own Team at Project Site and Engineering Activities at

Project Site, Managing All of Activities Sub-Contractor & Client

5. Create Site Plan Schedule using software Microsoft Project Planner 2007 and P3

Primavera Project Planner For Apparatus Foundation and Switch Yard / Switch

7 of 12

Gear area LA,CT,CB,DS,CVT,DSE, PI, Control buiding, and Transmission Line

150 KV Head project meetings to collect and disseminate information pertaining to

projects.

6. Coordination with PLN Site

7. Schedule and monitor program activity to achieve an “on-time” result including

follow-up with external suppliers to ensure timely response to action items.

8. Evaluates project performance of functional areas.

New Cilegon Project 2 OHL Bays 150 KV Existing . ( Krakatau Steel Project )

7

1. Directs and supervises other engineering activities

2. Scheduling Activities with Microsoft project planning 2003 and 2007

3. Reviews and monitors project progress to assure quality and adherence to

requirements of contract documents

4. Assists in the coordination of pricing, estimating, scoping strategies for proposed

projects and in the development and preparation of technical specifications

5. Directs and supervises own Team at Project Site and Engineering Activities at

Project Site, Managing All of Activities Sub-Contractor & Client

6. Create Site Plan Schedule using software Microsoft Project Planner 2007 and P3

Primavera Project Planner For Apparatus Foundation and Switch Yard / Switch

Gear area LA,CT,CB,DS,CVT,DSE, PI, Control buiding, and Transmission Line

150 KV Head project meetings to collect and disseminate information pertaining to

projects.

7. Schedule and monitor program activity to achieve an “on-time” result including

follow-up with external suppliers to ensure timely response to action items.

8. Evaluates project performance of functional areas.

9. Avoid all that dangerous in site

10. Coordination with PLN Site

11. Manage Sub contractor

JAVA BALI ACCELLERATION PROJECT ASSOCIATED 10.000 MW STEAM

COAL POWER PLANT PRIJECT, PACKAGE 3 150 KV CONVENTIONAL

SUBSTATION FOR JAVA) Cikedung substation 2 OHL Bays, 2 Transformer, 1 Coupler

with contract No : 190.PJ/133 PI KITRING JBN 2008.

1. Directs and supervises other engineering activities

2. Scheduling Activities with Microsoft project planning 2003 and 2007

3. Reviews and monitors project progress to assure quality and adherence to

requirements of contract documents

4. Assists in the coordination of pricing, estimating, scoping strategies for proposed

projects and in the development and preparation of technical specifications

5. Create Site Plan Schedule using software Microsoft Project Planner 2007 and P3

Primavera Project Planner For Apparatus Foundation and Switch Yard / Switch

Gear area LA,CT,CB,DS,CVT,DSE, PI, Control buiding, and Transmission Line

150 KV Head project meetings to collect and disseminate information pertaining to

projects.

6. Schedule and monitor program activity to achieve an “on-time” result including

follow-up with external suppliers to ensure timely response to action items.

7. Evaluates project performance of functional areas., BoQ

8. Directs and supervises own Team at Project Site and Engineering Activities at

Project Site, Managing All of Activities Sub-Contractor & Client

9. Avoid all that dangerous in site

10. Coordination with PLN Site

9 1. Earth Test Soil Resistivity at Sambi Kerep

2. Earth Test Soil Resistivity at Bambe

3. Earth Test Soil Resistivity at Negeri Dolok

4. Earth Test Soil Resistivity at Sidikalang

5. SAS (Automation ) Migration 5 Bays at Kopo banten

Soil Resistivity &

6. Earth Test Soil Resistivity at GIS Harapan Indah

Automation SAS

7. Earth Test Soil Resistivity at gumawang

Migration

JOB EXPERIENCES

1 Time Period 7 July 2011 – 31 Dec 2011

2 Title Project Engineer

3 Company PT. INDOMUDA SATRIA INTERNUSA – ALSTOM (CONSORTIUM)

4 Reason For Leaving Alstom Recruitment

8 of 12

5 G-PT.AGINCOURT RESOURCES MARTABE PROJECT GOLD MINE

HV Switchyard and HV Transmission line 150 KV (Contract No.1929-0511)

1. Coordinate the collection and dissemination of technical information

between/within the company and customer.

2. Head project meetings to collect and disseminate information pertaining to projects.

3. Schedule and monitor program activity to achieve an “on-time” result including

follow-up with external suppliers to ensure timely response to action items.

4. Evaluates project performance of functional areas.

5. Preparing of final Punch List and distribution to field for correction and preparing

of hand over to client/Main Contractor

6. Receives instructions on assignment objectives, complex features and possible

solutions.

Martabe GOLD MINE

7. Receives / solicits guidance on unusual and/or complex problems and supervisory

Project

approval on work plans.

8. Makes project progress report ( Daily report and weekly report.

9. Directs and supervises other engineering activities

10. Reviews and monitors project progress to assure quality and adherence to

requirements of contract documents

11. Assists in the coordination of pricing, estimating, scoping strategies for proposed

projects and in the development and preparation of technical specifications

12. Create Site Plan Schedule using software Microsoft Project Planner 2007 and P3

Primavera Project Planner For Apparatus Foundation and Switch Yard / Switch

Gear area LA,CT,CB,DS,CVT,DSE, PI, Control buiding, and Transmission Line

150 KV

JOB EXPERIENCES

Time Period 12 Mei 2010 –11 July 2011

1

Title Engineer Transmission Specialist

2

Company PT. METRO TV NEWS

3

Reason For Leaving Resign

4

1. Operating Thales transmission, OMB and Maintenance Equipments

5

2. Fixing a broken part of Exceiter, Exchanger, Microwave System 1+1

3. Create Band Pass Filter for transmission, Installation,and commissioning

4. Adjustment Audio and Video Quality

5. Make Report and document

Duties /Jobs description

6. IOX, Exceiter, HPA maintenance and Control Sattelite Broadcast

JOB EXPERIENCES

Time Period 19 November 2009 – Mei 01 2010

1

Title Head of General Affairs ( H-GA )

2

Company PT. SALAM PACIFIC INDONESIA LINES ( SPIL ) (Shipping Company )

3

Reason For Leaving Resign

4

1. Maintenance Building and all equipments

5

2. Create Administration for Staff and building reparation

3. Make a report of documentation and handling time rooster

4. Handling office equipment

Duties /Jobs description

5. Handling time rooster of Trailers, Trucking, Delivery Order

6. Do payment the salaries of local employees at Tg.Priok (labor)

7. Check the invoice suplier document

JOB EXPERIENCES

1 Time Period January 8, – 13 July, 2009

2 Title RF Planning and Optimization Engineer

3 Company CENTFOR TECHNOLOGY CO.LTD ( Telecommunication Contractor Company )

4 Reason For Leaving Project Has Been Completed Well

5 1. Network monitoring performance

2. Solving customer complain about network performance

3. Drive test spot problem for analysis and optimization

Duties /Jobs description

4. Capacity re dimensioning to achieved maximum using of full rate codec and

decreasing half rate usage

5. Traffic load analysis and TRX re-Balancing.

9 of 12

6. Physical optimization and Frequency changing.

7. Traffic Analysis Cell SMS ERL (BSSAP part), Cell SMS ERL (L3 part), Traffic

Voice, Traffic Data ( KPI,CDR,CSSR,HoSR) From OMC

JOB EXPERIENCES

1 Time Period September 16 – 31 December 2008

2 Title Site Engineer

3 Company PT. LINCE ROMAULI RAYA ( Contractor Company )

4 Reason For Leaving Project Has Been Completed Well

5 Rehabilitation of Continuation of Regional office Building at main service office of toll and

duty type A Tanjung Priok, North Jakarta with contract number :

SPK-04/KPU.01/PPK.01/FSK/2008

1. Maintenance Mechanical & Electrical Building .

Duties /Jobs description

2. Stock Control of Mechanical & Electrical Equipments.

3. Make a Progress Documentation of Mechanical & Electrical Building.

4. Manage Sub Contractor., Observer

5. Coordinating with client

6. Progress Monitoring

7. Represent the interests of the company and facing the authorities in the area.

JOB EXPERIENCES

Time Period April 2007 – December 2007

1

Title Engineer

2

Company CV. CIBOMBO TIRTA MULYA

3

Reason For Leaving Project Has Been Completed Well

4

Duties /Jobs description 1. Maintenance and supplying Mechanical / Electrical at BAPETEN Companies

5

( Badan Pengawasan Tenaga Nuklir ) with work order sheet number

SPK : 005/PPK/L-ME/BU-SES/IV-07

2. Handling office equipment and supplying ATK,etc

3. Create Documentation Progress

4. Check and make sure all Procurement and all materials accessories

5. Create a financial report to theoffice

6. Support tendering & Cost Control

7. Filing all document copy PO for Suplier,Invoice from suplier,Time sheet

unit,Expenses.

8 Check the invoice suplier document

9 Pay the salaries of local employees on site

JOB EXPERIENCES

Time Period July – September 2006

1

Title Apprentice ( NETWORK OPERATION ) NO

2

Company PT. TELEKOMUNIKASI SELULAR YOGYAKARTA ( Telecommunication

3

Company )

4 Reason For Leaving Apprentice Has Been Completed Well

5 Duties /Jobs description 1. Mini-Link PDH Transmission.

2. Check list BTS Equipment on the site.

3. Observer in the site.

4. Create a document For My Apprentice

JOB EXPERIENCES

Time Period 01 July – 31 December 2005

1

Title Superintendent

2

Company PT. ORINADI MADYA TAMA ( Contractor Company )

3

Reason For Leaving Project Has Been Completed Well

4

Duties /Jobs description Project of development of extension of service office building of toll and duty type special A

5

of Foreland Priok at Pabean street No. 1 port of Foreland Priok north Jakarta with contract

number : PEJ-07/WBC.04/KP.01/2005.

1. Stock Control of Mechanical & Electrical Equipment

2. Make a Progress Documentation of Mechanical & Electrical Building, Observer.

3. Support tendering & Cost Control

4. Filing all document copy PO for Suplier,Invoice from suplier,Time sheet

unit,Expenses,

10 of 12

SUMMARY OF EXPERIENCE:

Objective

In The Past of 7 years I has Been Experienced in Many Projects Such as : Housing and Building

Construction, Power House,AIS ( Air Insulated Substation ) & GIS ( Gas Insulated Substation ) 70 kV,150 kV, 275

kV, 500 kV S/S, Petrochemical Project, Mining Construction,My Responsibilities is Managing Planning and

controlling all of activities for construction and installation, general civil work and building