K V V RAMANA RAO
*******@*****.***
A Mechanical Engineering Professional with 25 year experience with
Core Experience of Maintenance Experience of 12 Years,Power Plant
Operation & Maintenance Experience of 5 Years,Project
Management/Construction Management Experience of 8 years in various
Industries.
. Proven abilities in maintenance management Equipment related to a 300 TPD
Dissolving grade Pulp Mill- Chipper house,Digester house,washing,bleaching,Dryer part,wet part .cutter,bale press,baling line.
. Chemical plants Equipment Maintenance - 4 TPD tpd Chlorine
Dioxide,Sulphur dioxide, Hydrogen Peroixde,Hydro chloric acid plant, 100
Nm3 /HR Oxygen & Nitrogen gas Plant generators,Chilled water
Plants,Compressor House,Hypo,Casutic,H2s04,Brine, Chlorine Handling
system.
. Opreartion & Maintenance of 12.06 /5.6 MW Coal Based Thermal Power
Plants. (FBC/Stoker Fired Boilers, DM Plants, Ash Handling systems,Coal Handling Plant Raw Water/ Waste Water Treatment Plants) &
Maintenance of Liquor Fired Boiler,Evaporator,Causticizing and Lime
Kiln for Sludge Reburning.
. Proven Ability in manufacturing of Process Equipments for Pulp & Paper
Industry,Mineral Processesing,Pressure Vessels & Heat Exchangers,Piping
Skids in Hydro Carbon Sector, Clarifiers for Raw Water /Effluent
Treatment plants,RODM Plants.
. Proven ability in handling EPC projects -Bulk Material handling systems
- Coal Handling Plants for 300MW,500MW,600MW Power Plants, 1 Million
TPA Iron ore Handling System,1.5 Million TPA Bauxite handling systems
for Irone ore,Alumium etc,20MLD RODM Plants for Oil Refineries,Rawater Treatment Plants for 130 MLD capcity for Oil refineries,
Waste Water Treatment Plants for Oil Refineries.
. Shut down Planning, Spares Planning,Inventory Control,Vendor Development,
Contract Management.
Proffessional Experience : 25 Years
Name of the Company Position Held Duration Years
Tenova Bateman Engg India (p) Project Manager Since
Ltd Reporting to MD March13
(Project Cost : Rs 500 Crs)
Elecon EPC Projects Ltd Gen.Manager-Projects Aug 11 - 1.6
Gujarat. Reporting to CEO Feb13
(Multiple Projects:Rs 750Cr)
Hindustan Dorr Oiliver Ltd, Sr Deputy General Nov 08 - 2.7
Ahmedabad,Gujarat. Manager-Projects Aug 11
(Projects Handled : 150 Crs) Reporting to VP-Oper
Bahia Pulp,Salvador,Brasil Manager -Projects June 08 0.4
(4500000TPA RG Grade Pulp) Reporting to GM -Sept 08
Ballarpur Industries Ltd Dy General Manager Dec 91 - 17
Dissolving Grade Pulp (100000 Report to Unit Head May 08
TPA )Unit:APRayons
Kamalapuram,Warangal,AP,
India (Thapar Group)
(Projects Handled : 200 Crs)
CharminarPapers Ltd, Maintenance Engineer May91- 0.7
Hyderabad Reporting to MD Dec91
Sri Venkateswara Industrial Site Engineer May-89 2.0
Consultants,Rajahmundry Reporting to Partner -May 91
. Bateman Engg India (P) Ltd,Bangalore,India (2013-Till Date)
Position : Project Manager
. Project Management,Erected & Commisssioned EPC LSTK Project of
Bauxite Feeding & Crushing Plant ( Capacity : 1500 TPH) at UTKAL
Alumina Refinery Inernational,Odisha. (1.5 MTPA Capacity) including
Utilities (Equipment & Piping).
. Project Management,Erection and Commissioning of EPC LSTK
Contract of 18.50 KM Belt Conveyor for Transporting Bauxite from
Mines - Refinery) consists 18000 MT Structural Fabrication
(Rectangular Gantry type)& Erection, 30000 M3 RCC,2000 MT
Equipment Erection,300 KM of HT Cable Laying for a Bauxite
Handling system for 1.5 MTPA Alumina Refinery at UTKAL Alumina
International Odisha (Under Erection) including Utilities (
Equipment & Piping).
. ELECON EPC PROJECTS,VV Nagar Gujarat,India (2011-2013)
Position : General Manager -Projects
. Project Management,Erection & Commissioning of Coal Handling Plant
for 2 x 300 MW Power Plant at GMR Warora.(Wagon Tipler,Apron
Feeder,Belt Conveyors,Bucket Wheel Reclaimer,Utliities ( E quipment
& Piping) and other accessories).
. Responsible for Project Management for all EPC and Non EPC Projects
(Project Planning,Project Monitoring,Review,Project controls and
Project cost control) for supply,Erection & Comissioning of Coal
Handling Plants (2500 TPH) including all Utlilities ( Equipment &
Piping) for Major /Mega power plants upto 660 MW, BOP Package and
major material Handling projects for steel,cement,ports and Fertliser
plants
o (NTPC,BHEL,SAIL.NMDC,TECPRO,MAHAGENCO,APGENCO,LANCO,GVK
o,GMR,KSK.MANIKGARH,ULTRATECH,SHREE & SIDDHIVINAYAK,IFFCO.)
. Responsible for Project Management of Coal Handling Plant EPC Project
at NTPC Mouda -2000 TPH Coal Conveying System along with all
accessories. (Coal Handling Plant for 2 X 660MW Super Thermal Power
at NTPC - Mouda,Maharastra )
. Hindustan Dorr Oliver Ltd,Ahmedabad,Gujarat,India(2008-2011)
Position : Sr Deputy General Manager -Projects
. Supply & Erection of 130 Mld Raw Water Treatment Plant, 21 Mld RODM
Plant Equipment along with Piping for 165 MW Captive Power Plant for
IOCL Paradeep
. 21 Mld RODM Plant Equipment along with Pipingfor 165 MW Captive Power
Plant at Hindustan Mittal EnergyporLimited,Bhatinda.(Guru Gobind
Singh Oil Refinery Limited) & IOCL Paradeep.
. Supply & Erection of Various Effluent,Raw Water Treatment Plants
Capacity of 9-30MLD Equipments and piping for Oil Refineries -Viz
Indian Oil Corporation,,Hindustan Petroleum Corporation,Bharat
Petroleum Corporation.
. Supply & Erection of Various Raw Water,Effluent Treatment Plants
Equipments along with piping for Municipal Corporations of
CIDCO,CPCL,Nirma,Coromondal Fertlilisers,and Uranium Corporation
Limited.
. Supply of 180 TPD Paper Plant Pulpmill Equipment at KR Pulp&Papers &
300 TPD Pulp Mill Bindal Papers Limited.
. Responsible for Business Development,Proposal & Estimation,Material
Planning, Production Planning,Project Planning,Project Execution,Project cost Control for above EPC Projects related to
manufacturing of Heavy Equipment, Static & Rotating Equipments,
Pressure Vessels and Heat Exchangers.Equipments for Piping Skids for
water/Gas
. BAHIA PULP -SALVADOR BRASIL,SA (2008)
Position : Manager - Projects.
. Involved in Commissioning of Utilities for 2x 50 MW Power Plant
related to 1500 TPD Dissolving grade Pulp.
. Ballarpur Industries Limited Unit : AP Rayons,Warangal AP,India (
1991-2008)
Position : Deputy General Manager
. Proven abilities in maintenance management of 12.6 MW /5.6 MW Coal based
Thermal Power Plant consists of Stoker fired boilers, FBC
Boilers,Biomass boiler,Chemical fired recovery boiler,Coal Handling
Plant, Fuel oil handling plant Ash handling system,Compressor
House,Cooling towers,DM Plants, Raw Water Treatment Plants,Waste water
Treatment Plants,Lime kiln,Evaporators,Causticizin,g Material Handling
Systems,
. Proven abilities in Maintenance Management of Chipper house,Digester
house,washing,bleaching,Dryer part,wet part .cutter,bale press,baling line, Equipment maintenance of chemical plants-Sulphur
Dioxide,Chlorine Dioixde,Hypo,Casutic,H2O2,Chlorine,HCl,H2s04, DG
Sets,Hoists,Cranes,Plate heat Exchangers, Sheel & Tube Type Heat
Exchangers,Oxygen & Nitrigen gas Gereration plants,Chilled water plant.
. Assisting GM-Engineering for Coodrination with all the departments to
maintain the plant in his absence.
. Conducting Condition Monitoring techniques for Predictive, preventive &
breakdown maintenance to increase the Uptime of the Plant.
. Responsible for Inventory Control & Spares Management.
. Responsible for functioning of Design & Drawing Office for all
development jobs and spare parts development.
. Monitiroing of the Capex & Maintenance Budget Review on monthly basis.
. Responsible for implementation of Capex,Energy/Water Conservation
measures Development jobs,Total Quality Management
. Charminar Papers Limited,Hyderabad,India (1991)
Position : Maintenance Engineer
. Maintenance of 10 TPD Kraft Paper Mill including Utilities.
. Sri Venkateswra Industrial Consultants,Rajahmundry, AP India (1989-91)
Position : Site Engineer
. Erection & Commissioning of 20 TPH Wood Chip Plant along with Chip
conveying system at International Paper,Rajahmundry,AP,India
. Erection & Commissioning of 8 TPH Husk Cethar Make FBC boiler along
with Fuel Handling system,Piping at Kanakadurga Agro Oils,Vijayawada,AP,India.
PROFESSIONAL ACHIEVEMENTS.
. Design & Exceution of Utlitiy Piping for for 10 MW Power Plant in a
Paper Mili capacity of 200TPD.
. Implenmentation of Energy Conservation measures in the
Plant to achieve 75 Kwh /ton of Pulp .
. Implenmentation of Water Conservation measures in the
Entire Plant to achieve 100 m3 /ton of Pulp .
. Reduction of Digester Cooking Cycle time by Vapor Phase
. Balancing of the Equipment capacities to achieve
Sustainable production designed capacity of the fibre
line.
. Reduction of cycle time in manufacturing of process Equipment
. Turnover Increase at HDO Manufacturing Unit & Elecon Engg
Software Proficiency
MS Project,Primavera.
Auto-Cad R14,
MS Office (Excel, Access, Word, PowerPoint
Implementation of ERP & SAP
Professional Trainings Attended.
Total Quality Management -(ANAAR,USA)
Energy Conservation & Energy Audit - MK RAJU Consultants
Finance Management for Non Finance Managers- ACCORD Singapore
Traning Programme on Selection & Maintenance of Pumps -KSB
Bearings,Compressors,Turbo Feed Pumps - FAG/SKF/KSB/TRIVENI
Condition Monitoring Techniques.- SPM Hyderabad
Team Building-Nirma Institute of Management,Ahmedabad
Leader Ship Skills-Ahmedabad Management Association.
PROFESSIONAL & EDUCATIONAL QUALIFICATIONS
Class School /College Year of Pass %Marks
X MTH School,Rajahmundry 1982 69
XII CGTM Jr College,Rajahmumdry 1984 64.3
B.Tech SVH College of Engineeering, 1989 65
(Mech) Machilipatnam,Nagarjuna University
Personal Particulars
[pic]
Date of Birth : 11.12.1966
Age : 47 Yrs
Languages known : English, Hindi & Telugu
Passport details : J7160322 valid upto 2021
Marital Status : Married.
Date:24.08.14
Place:Bangalore KVV Ramana
Rao[pic][pic][pic][pic][pic][pic]