Dear Sir,

I have the pleasure to submit here my C.V. hoping it will meet with you

requirements

Name : AlAA El-Din Hamada El-Ganauiny

Date of birth : 14, June 1964

Nationality : Egyptian

Qualification : B.Sc. in Mechanical Engineering 1986

Grade : General Good

Marital status : Married with three children

Religion : Muslim

Languages : Arabic- Mother tongue

: English -fluent, spoken & written

Transport : Valid driving license held

Permanent address : 22 Hegazy St. from Aly Mobarek St. Tanta –Egypt

Mobile : 010********012********

: ******@*****.***

E-mail

*** Employment history & Experience

I had been charged for much kind of industries projects made by foreign companies at

Egypt, I had charged for erection, commissioning and maintenance work

as described below :-

1- From December 2010 up to January 2014

Job title (1st Job) :-Assistant Construction Manager, Working with Mitsubishi

Heavy Industries Co. LTD.

Scope of work :-Abu Qir Thermal Power Plant 2x650 MW

(Unit-6&7 Gas/Oil Fired)

:- Construction Coordinator, for Steam turbine generators &

Job duties

condenser 2x 350 MW and its auxiliaries (CP-106) contract.

During construction period I involved to cover the following activities:-

1- Installation for turbine building bridge crane included function test and load test.

2- Construction coordinator between MHI, Client, Consultant and other contractors.

3- Installation of auxiliary equipments for steam turbine, Generator and Condenser.

4- Originator of all lifting plan for heaviest equipments.

5- Covers Scheduling planning & site coordination of mechanical work handling.

2- From February 2009 up to November 2010

Job title (1st Job) :-Construction Coordinator, working with Mitsubishi

Heavy Industries Co. LTD.

Scope of work :-Cairo WEST Thermal power Plant 2x350 MW

(Unit-7&8 Gas/Oil Fired)

Job duties :- Construction Coordinator, for Steam turbine generators &

condenser 2x 350 MW and its auxiliaries (CP-106) contract.

During construction period I involved to cover the following activities:-

1- Installation for turbine building bridge crane included function test and load test.

2- Construction coordinator between MHI, Client, Consultant and other contractors.

3- Installation of all auxiliary equipments for steam turbine, Generator and

Condenser.

4- Originator of all lifting plan for heaviest equipments.

5- Covers Scheduling, planning& Site coordination of mechanical work handling.

3- From October 2005 up to February 2009

Job title (1st Job) :-Commissioning, Start up Engineer, working with Mitsubishi

Heavy Industries Co. LTD.

Scope of work :-Nubareia Power station 2x750 MW (Nominal Combined Cycle)

Job duties :-Commissioning team leader covers start up for each

equipment such as heat run test, load run test for all steam

turbine/Generator auxiliaries.

Steam turbine start up included no load test and load rejection

Test and all test activities related to steam turbine starting

procedure.

Job title (2nd Job):-Warranty Engineer:- Cover warrantee period during plant

normal operation and support the client for any trouble shooting

occurred related to construction defects.

-Release the claim letter submitted from the client to get smooth

and normal operation.

-Submit weekly report to the client and monthly report to MHI

Japan.

-Site coordination between the client, consultant and Mitsubishi

head office for any updated trouble and schedules.

4- From July 2003 up September 2005

Job title :- Mechanical Chief Engineer, Working with Hitachi Plant

Engineering & Construction Co. LTD (HPC)

Scope of work :- Cairo North Power station 750MW (Combined Cycle)

Job duties :- Chief Mechanical Engineer covers Scheduling, planning&

Site coordination of mechanical Work handling, installation

and alignment of MITSUBISHI Gas Turbine & Generator

(2x250MW) and its auxiliary equipments.

Also involved as Site manger to install, assembly and alignment for Hitachi

Steam Turbine/Generator Project (1x250) MW as Follow:-

The main objective to ensure that all activities are carried out:

• In accordance with approved procedures, specifications, ITP requirements and

drawings;

• Using qualified and, when required, certified personnel for carrying out special

processes;

• Using materials which are kept under control from the receiving throughout the

entire working cycle;

• Performing all tests, measurements and inspections required by the Owner.

• All non-conforming/damaged materials are detected, identified and segregated

till resolution of the non-conformance.

5- From January 1997 up to July 2003

Job title :-Maintenance Engineer, Working with Arab Swiss Engineering

Co. (ASEC)

Scope of work :-Beni-Suef Cement Company (BCC)

National Cement Company (NCC)

Helwan Portland Cement Company (HPCC)

Job duties :-Maintenance engineer for mechanical equipments such as raw

mills, cement mills, Kiln, fans, Crusher and other auxiliaries

units for cement plant. Also involved for trouble shooting during

Plant operation and production.

6- From May 1996 up to Dec. 1996

Job title :-Steel fabrication engineer, working with KOBE STEEL CO.

Scope of work :-Alexandria National Steel Company (ANSDK)

Second Direct Reduction Plant (SDRP)

Job duties :-Revision workshop drawing before fabrication.

-Supervision for steel fabrication equipment’s for project

requirements at local fabrication vendors.

-Inspection for product quality including: -

Visual inspection, Welding inspection, Dimension inspection

and painting inspection.

-Supervision for erection work at site.

7- From Jan. 1994 up to May 1996

Job title :-Technical Assistant Engineer, Working with KAWASAKI

HEAVY INDUSTRIES.

Scope of work :-Beni-Suef Cement Company.

Job duties :-Technical assistant for Japanese supervisors during

Commissioning period and performance guarantee test.

-Group leader for maintenance teamwork.

-Site manger during guarantee period to release punch list&

operation remarks related to mechanical equipment’s.

8- From July 1990 up to Nov. 1992

Job title :-Mechanical Constriction Engineer, Working with TOSHIBA

TECHNICAL SERVES INTERNATIONAL CORPORATION

Scope of work :-Assiut Thermal Power Plant (1x300 MW)

Job duties :-Direct responsible engineer for installation and adjustment of

TOSHIBA steam turbine & generator and its auxiliary

equipment’s included boiler feed pump turbine, motorized feed

pumps, condensate extraction pumps, lubrication oil unit,

hydraulic oil unit, seal oil unit and other equipments supplied by

HAMON-SOBELCO CO.

-Responsible for steam turbine/generator and its auxiliary for

trouble shooting during commissioning period and performance

guarantee test.

9- From Aug. 1989 up to April 1990

Job title :-Mechanical Engineer, Working with SAE SADELMI CO.

Scope of work :-Damanhour Thermal Power Plant Extension (1x300 MW)

Job duties :-Direct responsible engineer for installation and adjustment of

INDSALDO steam turbine & generator and its auxiliary

equipment’s.

-Maintenance engineer for steam turbine/generator and its

auxiliaries during performance guarantee test.

10- From Nov. 1987 up to Oct. 1988

Job title :- Mechanical Site Engineer, Working with FILIPPO FOCHI

CO.

Scope of work :- Pelayim Petroleum Fields

Job duties :- Site Engineer for erection work of mechanical equipments

included Gas turbine, Pumps and Pipelines.

- Maintenance Engineer for mechanical equipment’s supplied

by HITACHI ZOSEN CO. during commissioning period.

**Training Courses:-

1- SKF Alignment Course.

2- SKF Bearing Technology Course.

3- ASEC Cement Manufacturing Course.

4- Vibration Analysis (Nile Advanced Technology & Commerce) NATCOM

**Safety :-

1- OSHA general industry safety & health standards.

2- OSHA construction safety & health standards.

Based on above mentioned history & experience, I hope that my qualification

meet with your requirements.

Best regards

Eng. Alaa El-Ganauiny