Robert M. Thomas
Senior Project /Construction Manager
Location:
Senior Project/Construction Manager with more than 37 years of experience Harrisburg, PA 17111
managing operations for new construction and renovation of commercial, energy,
transportation (federal/state), military, and educational facilities. Particular expertise Contact Numbers:
Home: 717-***-****
working on nuclear and petrochemical facilities. Strong in scheduling (P6, Microsoft
Cell: 717-***-****
Project), planning, cost analysis, project supervision, estimating, budgeting, value E-mail:
engineering, performance analysis, commissioning and contract claims and litigation **********@***.***
avoidance with design-build and CM-at-risk projects.
Education:
Bachelor of Science –
Work History Civil and Construction
Engineering, Spring
Michael Baker Jr., Inc. (Harrisburg, PA) – Construction Manager Garden College (1977)
Post Graduate –
Preparation of primary contract documents for Federal and State funded transportation
Nuclear Engineering,
projects, inclusive of commissioning and testing services. Project specification Penn State University
development, value engineering and design review, owner representation, P6 schedule (1985)
development and cost management. (2/2014 – 9/2014)
Training/Certifications:
STV Energy Group – Department Lead Scheduler (Douglassville, PA) – STV Inc.
Preparing an Accurate &
Preparation of P6 Schedules and cost/man-hour curves for major pipeline relocations Profitable Construction
and ‘Inside the Fence’ projects. Developed and instituted training among group for Estimate Course,
American Institute of
Contract Manager, P6 and MicroSoft Project managed projects. Maintained project
Architects (AIA) (2008)
cost tracking and earned value management curves for 22 departmental Project
Managers. (4/2013 – 2/2014) Accurate Labor,
Equipment, Overhead
and Profit, AIA (2008)
PA Turnpike Commission, Central Administration Data Center (Middletown,
PA) – Project Controls Manager – STV Inc. Confined Space Entry
Developed and maintained schedules, tracked project costs and monitor ed general Training, KCI
project controls for conversion of an existing 104,000-sf occupied facility which Technologies, Inc.
houses the Pennsylvania Turnpike Commission’s primary Data Processing Center, a (2003)
Level III private branch exchange (PBX) room, EZ Pass Operations and a Traffic
Geotechnical Engineer
Operations Center. (2/2009 – 4/2013) Training, Professional
Service Industries (PSI)
MWAA Dulles Corridor Metrorail Extension GEC (Fairfax & Loudoun (2001)
Counties, VA) – Cost Estimating – STV Inc.
Human Performance
Provided supplemental support in estimating project scope changes for construction of
Enhancement System
a 23.1 mile, $6.2 billion New Starts extension of Metrorail in the Dulles Corridor, Training, Institute of
Fairfax and Loudoun Counties, VA. The extension will broaden service from the Nuclear Power
Operations (INPO)
existing Orange Line at the East Falls Church station i n Fairfax County to Route 772
(1992)
(Ryan Road) in Loudoun County. (1/2009 – 2/2009)
Large Steam Turbine-
Constellation Energy Nuclear Facilities (Lusby, MD) – Cost Estimating – System Generator Mechanisms
One Engineering Contract Position Technical Training,
Atlanta, GA (1984)
Provided capital cost estimates for three (3) nuclear plants including Ginna Nuclear
Facility in Webster, NY, Nine Mile Point Nuclear Facility in Rochester, NY and Level I Mechanical Test
Calvert Cliffs Nuclear Facility in Lusby, MD. (9/2008 – 1/2009) Engineer, Catalytic, Inc.
(1978)
PA Asbestos
Supervisor/Contractor
(RAPA17025)
1
Sadler Health Center (Carlisle, PA) – Project Manager – Pyramid Construction
Training/Certifications
Scheduling, cost control and project management for a $1.6 million renovation to an
(Cont’d):
historic building acquired by Sadler Health Center . Prepared budgets, reviewed
contractor submittals and coordinated renovations around an operational clinic. Various Management
(12/2007 – 7/2008) related courses relative
to time management,
people skills, dispute
Advanced Conversion Technology, Inc. (Middletown, PA) – Project Manager – resolution and skill
Pyramid Construction development
Schedule and budget development, project cost control, reviewed of contractor
Memberships:
submittals and project management for $2.4 million construction of a new single stor y,
Harrisburg Regional
30,000-sf manufacturing facility in Middletown, PA. Expansion of an existing facility
Chamber (2008)
to support increased production of advanced power supplies for Heads-Up Displays
(HUD’s) pilot helmets. (12/2007 – 7/2008) Interlocking Concrete
Pavement Institute
(ICPI) (2005 – Present)
Capital Area Transit (CAT) (Harrisburg, PA) – Project Manager – Pyramid
Construction Kappa Sigma Kappa
Project scheduling and cost control for $200,000 renovation project to convert an (KSK))
existing 15,000-sf space of a 2-story administrative office building into additional
Computer Skills:
administrative office space. Project was executed in three (3) phases to move
Primavera Project
personnel and office facilities while the company’s offices were still operational.
Planner (P3)
(12/2007 – 7/2008) Construction Manager
MS Project
Mount Asbury United Methodist Church Camp (Newville, PA) – Project SureTrak
Manager – Pyramid Construction WinEst
Timberline
Construction of a new $2.4 million, 26,000-sf church camp in Newville, PA. The 2- Constructware
story retreat center included living quarters, recreation room, worship center, full CDS
kitchen and dining facilities. Exterior improvements included drain fields, storm Cost Works (RS Means)
water and roadway upgrades. (12/2007 – 7/2008) Heavy Bid
MS Suite
Hershey Foods Warehouse Renovation (Hershey, PA) – Project Manager –
Pyramid Construction
$300,000 renovation of existing facilities in support of a high density production
storage rack system. (12/2007 – 7/2008)
Dairy Farmers of America/Pepsi Co./Starbuck’s Extraction Plant
(Mechanicsburg, PA) – Site Project Superintendent – Stahlman Group
$11 million plant expansion associated with Starbuck’s, Pepsi Company and Dairy
Farmers of America. Project included addition of a new extraction facility associated
with Starbuck’s Frappuccino brand products. Provided supervision of all onsite
contractors. Coordinated construction activities around operational production lines
while maintaining good manufacturing processes (GMP). All three (3) companies
were in a partnership regarding ownership of the facility, which required approval of
work by all three clients. (1/2007 – 12/2007)
City of Baltimore Roadway Upgrades (Baltimore, MD) – Owners Project
Consultant – KCI Technologies
Client Representative for ongoing inter-city roadway upgrades along Fayette Street.
Monitored work activities, managed personnel and handled field issues. (2003 – 2007)
2
Christina School District, Brennen School (Newark, DE) – Project Consultant – KCI Technologies
Project Consultant services for two-story addition to the Brennen School; an existing school that is part of the
Delaware Autism Program in the C hristina School District in Newark, DE. Provided oversight of site
development activities, including site clearing, storm water/electric installation, and roadway/parking facilities.
Tracked schedule and reviewed contractor change orders. (2003 – 2007)
Christina School District, Albert H. Jones Elementary School Renovations (Newark, DE) – Project
Consultant – KCI Technologies
Project Consultant - Reviewed plans, monitored specifications and provided oversight of all mechanical and
electrical installations for renovation of 2-story Albert H. Jones Elementary School. Renovations included
installation of a state of the art HVAC, electrical, mechanical and security system. Monitored asbestos
abatement activities per Asbestos Hazard Emergency Response Act (AHERA) and National Emissions
Standards for Hazardous Air Pollutants (NESHAP). (2003 – 2007)
City of Gaithersburg, Youth Center (Gaitherburg, MD) – Project Manager – KCI Technologies
Managed restructuring of work activities & personnel, expedited materials and minimized profit loss for the
LEED® certified 26,000-sf youth center. Assumed project management responsibilities of this project when it
was 90% complete & restructured contractor support, material deliveries & resolution of financial cost
overruns which put project back on schedule and within project costs. (2003 – 2007)
PA Turnpike Susquehanna River Bridge Project (Middletown, PA) – Project Consultant – KCI
Technologies
Project Consultant - Assessed ongoing operations and documented project delays for the 4526 foot segmental,
concrete, Susquehanna River Bridge project. Provided independent consulting services on cost overrun claims
associated with causeway operations. Furnished an independent report complete with Lessons Learned section
and future recommendations. (2003 – 2007)
Morgan State University New Library (Baltimore, MD) – Project Consultant – KCI Technologies
Provided independent consultant services and reviewed ongoing and completed stone work for the construction
of a $43 million Morris A. Soper Library at Morgan State University. Produced an independent assessment
report on findings that revealed inconsistencies in quality, testing practices, construction practices and
materials. (2003 – 2007)
C.O. Williams Company, LLC – New Barbados Dam Construction (Black Rock, St. Michael, Barbados)
– Project Consultant – KCI Technologies
Civil Project consultant for the construction of a new 500-gpd embankment dam. (2003 – 2007)
United States Army Corps of Engineers (USACE), Military Base Projects (Letterkenny, Mechanicsburg
and Various Classified locations) – In-house Consultant – KCI Technologies
Engineering support in development of work orders, change orders, schedules, cost estimates (including
Independent Government Estimates), contractor negotiations and implementation of various mission critical
objectives. (2003 - 2007)
RR Donnelly Corporation, Reproduction Facility Renovation (Lancaster, PA) – Project Manager – High
Construction
Project management of an $8.4 million renovation to an existing 500,000-sf reproduction facility. (2001 –
2002)
Bender Corporation, New Office/Manufacturing Facility (Lancaster, PA) – Project Manager – High
Construction
Project management of a new $3.2 million, 25,000-sf office/manufacturing facility. (2001 – 2002)
3
High Associates, Lemon Street Remediation Work (Lancaster, PA) – Project Manager – High
Construction
Project management of a $185,000 remediation of 100 feet of street, sidewalks and underground gas storage
tanks on Lemon Street. (2001 – 2002)
High Associates, Rossmoyne Business Center (Mechanicsburg, PA) – Project Manager – High
Construction
Project management of a $2.4 million design-build, 12,000-sf single story retail strip mall complex (2001 –
2002)
Masonic Village at Elizabethtown, Utility Upgrades (Elizabethtown, PA) – Project Manager – High
Construction
Project management associated with the $1.2 million renovation and upgrade of utilities at the Masonic Village
Retirement campus. Upgrades included internal demolition of an existing facility an d a retrofit with a new
Pennsylvania Power & Light Company (PPL) hybrid heating system. (2001 – 2002)
Marion T. Academy, New Charter Elementary School (Wilmington, DE) – Project Manager – High
Construction
Project management of a new $4.3 million, 32,000-sf charter elementary school. Project included a 2-story
masonry structure constructed on a driven pile foundation over a contaminated landfill site. (2001 – 2002)
Middletown Odessa Townsend, New Charter Elementary School (Middletown, DE) – Project Manager –
High Construction
Project management of a new $6.4 million, 55,000-sf charter elementary school. (2001 – 2002)
First Energy Corporation - MetEd Saxton Nuclear Facility, Plant Decommissioning (Greenfield)
(Saxton, PA) – Lead Project Engineer – GPUN Nuclear
Supervised all asbestos abatement activities and oversaw concrete removal and demolition of various support
structures, including the containment building, old power plant and outbuildings . (1997 – 2001)
General Public Utilities Nuclear, Three Mile Island (Middletown, PA) – Senior Project
Manager/Construction Engineer/Planner/Scheduler – GPUN Nuclear
Served in scheduling, planning and nuclear system engineering roles before transitioning to Senior Project
Manager. Commissioned various mechanical and electrical systems along with construction of various multi -
million dollar structures. Acted as the principle scaffold coordinator during outages . Developed and
implement ed a computerized scaffold control program saving $725,000 in the first year of implementation.
Supervised union craft, developed schedules, cost estimates and work packages, answered RFI’s, developed
and instituted testing procedures, reviewed subcontractor contracts, served as a team member for the
development of an industry Preventive Maintenance program. (1982 – 2001)
Exelon Corporation, Oyster Creek Nuclear Facility, Outage Support (Ocean County, NJ) – Construction
Supervisor – GPUN Nuclear
Project management support of a refueling outage at the 625-Mw Boiling Water Reactor, Oyster Creek Nuclear
Facility. Accountabilities included inspection and construction supervision of union craft and upgrades to
various nuclear systems (1997 – 2000)
Jersey Central Power & Light, Sayreville/Werner Generating Facility Upgrades (Sayreville, NJ) –
Senior Project Manager – GPUN Nuclear
Project management associated with $500 million in upgrades to the Sayreville/Werner Power Plants. These
upgrades included conversion of two (2) 12-million gallon fuel oil storage tanks to demineralized water storage
to support four natural gas peaking units. Waterway upgrades, plant EPA emissions, computerized monitoring
system and multiple facility asbestos abatement activities. (1997 – 2000)
4
Cleveland Electric Illuminating (CEI)/Toledo Edison (TE), Davis Besse Nuclear Plant Refueling Outage
Support (Port Clinton, Ohio) – Lead Project Engineer – Catalytic Inc.
Led project engineer in support of the refueling outage at the 882-Mw Davis Besse Nuclear plant. Project
responsibilities included the overhaul of the large steam turbine generator (LSTG), turbine auxiliaries and spent
fuel system. (1980)
Northeast Utilities, Millstone Nuclear Power Plant, Spent Fuel Piping Replacement (Niantic, CT) –
Project Engineer – Catalytic Inc.
Engineering support and craft supervision for Unit-2 spent fuel piping replacement. Responsibilities included
cost estimating and scheduling. Returned to facility at client’s request based on previously performed work in
1977. (1980)
Three Mile Island Nuclear Power Plant, Unit-2 Cleanup & Decommissioning (Middletown, PA) –
Project Engineer – Catalytic Inc.
Responsibilities included development of engineering packages for clean-up and decommissioning activities at
Unit-2, Three Mile Island. Assignment included field work, containment entries, schedule updates and work
package development. Principle work included Unit-2 polar crane refurbishment, removal of damaged
equipment, and construction of various support decommissioning structures, supplemental craft supervision
and electrical coordination of support equipment. (1980)
Southern California Edison, Mojave Generating Station, Plant Upgrades (Laughlin, Nevada) – Project
Engineer – Catalytic Inc.
Assignment included supervision of three (3) principle union disciplines at the Mojave Generating Station.
Supervised the Boilermakers, Ironworkers and Insulators during the complete overhaul of a vertical coal fired
boiler unit, including upgrades to the 1,580-Mw Steam Turbine Generator . (1979)
Baltimore Gas & Electric Co., Calvert Cliffs Nuclear Facility (Lusby, MD) – Project Engineer –
Catalytic Inc.
Developed engineering work packages, commissioned installed systems and supervised various disciplines at
the 873-Mw, Unit-1, Calvert Cliffs Nuclear Facility. Various construction related projects included
construction of a new security facility, containment transfer enclosure, high density spent fuel racks and piping
replacement, control rod repairs, spray ring upgrades and maintenance of stop/control valves on the Large
Steam Turbine Generator. (1978 – 1979)
Congoleum Corporation, New Flume Incinerator (Marcus Hook, PA) – Owners Representative, Site
Construction Manager – Catalytic Inc.
Construction oversight of a $6 million Flume Incinerator at Congoleum Corporation. Responsibilities included
owners representative monitoring construction activities, processing of RFI’s, as -built documentation,
resolution of field issues and plant commissioning. (1978)
Sun Oil Company, New Dewaxing Plant (Marcus Hook, PA) – Project Engineer – Catalytic Inc.
Supervision of four (4) union disciplines and clerical staff for the construction of a $32 million Dewaxing Plant
for Sun Oil Company. Supervised Carpenters, Ironworkers, Cement Finishers and Insulators and provided
engineering submittal reviews, RFI’s, resolution of field issues, schedule coordination, as-built document, test
procedure development and plant commissioning. (1977 – 1978)
Northeast Utilities Millstone Nuclear Power Plant, Spent Fuel Rack Modifications (Niantic, CT)– Field
Engineer – Catalytic Inc.
Developed engineering work packages and supervised unionized disciplines for the $1.2 million replacement of
low density spent fuel racks with high density spent fuel racks at the Millstone Nuclear Power Plant. (1977)
5