Post Job Free
Sign in

Project Manager Quality Control

Location:
Europe
Posted:
November 03, 2014

Contact this candidate

Resume:

Robert Ramirez

Vijf Meiplein *** Leiden, The Netherlands

Tel.: +316******** E: ************@*****.***

Professional summary Over 20 years experience in all aspects of construction

project management. Specializing in safety, cost and

people management. Looking for a stable position within

a growing organization. Flexible and open to a variety of

careers and jobs.

Languages Fluent in English, Spanish and Italian

Work History Vice President of Operations,

Advanced Drywall Contractors of Florida [5/2003 to

3/2013]

* Managed all aspects of site development, zoning law,

construction, vendor management, project cost estimating and

management, quality control, sales and warranty for all drywall

construction projects including high volume skyscrapers and other

high profile projects. Recruited and trained, staff designated as

Area Manager, Project Superintendents and skilled labor.

* Recruited and trained, staff designated as Area Manager, Project

Superintendents and skilled labor.

* Delegated and assigned the work of Area Managers and

Superintendents of projects. Ensured that the Area Managers,

Superintendents and Subcontractors adapted to company policies

and procedures, including production management, scheduling and

safety in the workplace based on U.S.A OSHA (Occupational Safety

and Health Administration) rules.

* Found, negotiated and assisted with the planning of the workforce

in the labor subcontracting.

* Analysed the construction project and assisted with planning to

determine the requirements of construction, engineering and

construction techniques recommending alternatives.

* Attended pre construction and weekly meetings for all projects of

the company as a representative of the drywall contractor.

Reviewed construction drawings, plans, estimates and evaluation of

the project specifications to fully understand the scope of a project

work.

* Examined and ensured that the materials covered were enough;

analyzed the use of materials with the staff during the installation of

the initial work to adjust the quantities of material required and for

maximum cost efficiency.

*Was responsible for solving problems in the workplace among

manufacturers, inspectors, subcontractors and employees.

* Ensured Area Managers and Superintendents in projects met the

customer's needs (material quality, safety, etc.). Worked as a

Customer Relation between the business and the general

contractor firm.

* Developed and supported effective long lasting business

relationships with people inside and outside to create value and

influence the buying patterns of customers and to increase the

growth of sales revenue and market share.

* Investigated and solved the problems of the workers when the

Area Managers and Superintendents could not solve them

efficiently.

* Made on site inspections of safety and implement corrective

2

actions, if necessary, the use of OSHA sample for safety.

* Communicated daily with all levels of management and

departments of several branches about any aspect of the project.

* Controlled the process supplier invoices and contractor

applications for payment.

Site Superintendent

M&R Drywall [1/2002 to 3/2003]

Ran day to day operations on the construction site and control the

short term schedule. Oversaw employee quality control and

subcontractor coordination responsibilities. Oversaw labor and

material cost control and long term scheduling to be handled by the

site project manager. Attended site meetings to ensure schedules

were on track.

Owner

New Era Construction [1/1994 to 3/2002]

Estimated the cost and time frame of each project. Ensured that the

job was completed efficiently and on schedule. Kept accurate

records of all project and personnel data to ensure proper payroll,

taxation and material costs were managed efficiently. Scouted and

created relationship with contracting firms to find new jobs for the

organization.

Education Microcomputers

Bachelor’s Degree (HBO) May 1993

Polytechnical of Florida

2



Contact this candidate