AKBAR K.A
Mechanical Engineer
Mobile: +971-*********
Mobile (Home): +971*********
Email: *****.**@*****.***
OBJECTIVE: Seeking a position of a QA/QC Mechanical Engineer with CSWIP
3.1 having successful work experience about over 6 years in
India & Qatar.
ACADEMIC CSWIP 3.1 - Welding Inspector - Level 2
QUALIFICATION: (Cert. No.: 77961, Exp date: 18/07/2018)
B - TECH in Mechanical Engineering
Govt. Engineering College Thrissur, Kerala, India
(Affiliated to University of Calicut, 2007 batch with First
Class)
EXPERIENCE: Experience - 6 Years
Job Position - QA/QC Engineer
Company - Seashore Engineering & Contracting W.L.L, State of
Qatar
From November 2011 to November 2013
Seashore Group is a Multi Faceted Engineering organization,
established in the year 1989, in Qatar performing Engineering
and Contracting (Mechanical and Civil) activities mainly for
the structural jobs and oil & gas industries.
Company - Naaz Engineering Works, Mumbai, India
From March 2014 to August 2014
Company - Singhania System Technologists Pvt. Ltd. (SSTPL),
Mumbai, India
From August 2007 to July 2011
An ISO Certified Company associated with Designing,
Engineering, Manufacturing and Erection of Mechanical
Equipments/Process Systems such as Hot air producing system
with cylindrical shell Furnace, Inertization system with Gas
Storage Tanks, Piping units/Headers mounted with valves &
instruments.
CERTIFICATIONS: ASNT Level II Certification in Radiography Testing (RT), Dye
Penetrant Testing (DPT), Magnetic Particle Testing (MPT) and
Ultrasonic Testing (UT).
Certification Course on Process Piping Design & Engineering
as per ASME B-31.3
Online Certification in Internal Auditor Course.
Assessment Base Course in ASME Standards.
MEMBERSHIP: American Society of Mechanical Engineers - ASME
COMPUTER SKILLS: AutoCAD
MS Office
Working knowledge of computer packages like Windows OS and
Internet Service.
JOB Preparing Inspection Test Plan (ITP) and Method Statement as
RESPONSIBILITIES: per Client specification and standard quality requirements.
Implementation of Project Quality Plan and Inspection Test
Plan (ITP).
Review of Purchase Order (PO), approved Drawings and Project
procedures.
Stage inspection is followed as per the Inspection Test Plan
(ITP).
Inspection of raw materials with respect to procurement order
and Mill Test Certificate (MTC).
Review of MTC and procurement documents for traceability and
conformance to mechanical and chemical properties in
accordance with applicable codes & standard like ASTM, BS EN,
etc.
Fit-up and Dimensional Inspection of materials in fabrication
stage with respect to the approved drawings and
specifications.
Welding Inspection (stage wise & final) of all kinds of Steel
Structures, Piping system, Storage tanks, Ducting, etc. as
per the project specification, weld map, and related
applicable codes like AWS D1.1 and ASME Section IX.
Preparation of Welding Procedure Specification (WPS) and
Procedure Qualification Record (PQR) as per ASME section IX
and AWS D1.1.
Witnessing Welder Qualification tests and monitoring of
welding parameters during the process.
Non Destructive Testing (NDT): Witnessing various Non
destructive tests like, Radiographic Test (RT), Magnetic
Particle Test (MPT), Dye Penetrant Test (DPT) and Ultrasonic
Test (UT) in accordance with ASME Sec V & AWS D1.1.
Coordinating with Lifting Department for conducting the load
test of lifting equipments like containers, spreader beams,
tanks, man basket, skips, etc.
Witnessing various mechanical lab tests like, Tensile Test,
Hardness Test, Bend Test, Impact Test, Fillet Fracture Test
and Macro Examination.
Process Inspection of Valves and Instruments mounted on the
piping System using P & I Diagram and Fabrication drawing.
Witnessing Hydro Test of Pipe lines & Piping systems.
Blasting and painting inspection of various Fabricated
products by using Thickness profile gauge, Wet film thickness
gauge and Digital coating thickness gauge during blasting,
priming, mid and final coat stages according to client and
manufacturer specification.
Before blasting and Painting environmental conditions were
checked, verified and recorded.
Site Inspection: To visit the site for checking whether all
erection works and welding are carried out in accordance with
QA/QC program, Project drawing & specification. When
defective materials, equipment, or workmanship are found,
immediate action to be taken to correct them and to report
the Site Superintendent.
To check and verify all repairs or corrective actions are
performed in each stages of fabrication and erection, if any.
Documentation: Preparing the FINAL DOSSIER at the completion
of Project.
Maintaining the ISO Documents for Auditing purpose.
Updating & maintaining the calibration status of all
instruments.
Sending RFI (Request for Inspection) to Client or Third Party
Inspector (TPI) for the inspection of product/material.
Raising the NCR (Non Conformance Report) for the concern
department who's going against the Quality Plan and project
specification.
MAJOR PROJECTS Fabrication, Repairing & Installation of Pile jackets at NGL
HANDLED: Jetty (Off Shore) Mesaieed for STFA Marine Construction
Company.
Fabrication & Installation of PEB Building structures at
Dukhan site for Qatar Petroleum (QP).
Fabrication & Installation of Workshop with pipe truss for
Gulf Earth Moving Company (GEM).
Fabrication & Installation of Steel Platforms for walkways &
catwalks at New Doha International Airport (NDIA) for
CRISPLANT CO.
Fabrication & Installation of Inertisation system & Hot air
producing system at Orient Cement, Devapour site, Andra
Pradesh, India.
PERSONAL Name :
INFORMATION: Akbar K.A
Name of Father : Abdul Rahiman
Name of Mother : Fathima
Address : Karappamveettil House
Eriyad P.O, PIN: 680666
Nationality : Indian
Date of Birth : 25-05-1985
Languages Known : English, Hindi, Malayalam
Sex
: Male
Marital Status : Married
Driving Licence :
India
PASSPORT DETAILS: Passport Number : G5578151
Place of Issue : Cochin
Date of Expiry : 29/10/2017
Current Visa Status :
Visiting Visa (02/11/14 to 24/01/15)
DECLARATION:
I hereby declare that all the details above mentioned are true and correct to
the best of my knowledge and believe.
AKBAR K.A