SUMMARY

• Familiar with AutoCAD 2007 and AutoCAD 2013,CADWorx 2012 and Microstation SE (4 years)

• Typically 15-20 years piping design experience chemical and nuclear facility

• 10 years of supervision with good communication skills working on TAR

• 30+ years in all aspects of establishing detailed piping design and bill of material - isometrics

• Work from P&IDs project and specifications and vendor data to layout and design complex piping

system for petro-chemical refinery and nuclear power plants

• Working with team of piping designers, drafters, and engineers to develop new construction

• Also work for engineering and design department to do field walk-downs, surveying, and sketching AS-

BUILDs to complete existing jobs also working on TARs

• Also familiar with layouts of tanks, pumps, meter stations, and piping systems as large as 40” to as small

as 2” and below

EXPERIENCE

BP, WHITING REFINERY, WHITING, IN (4/2013 TO 10/2014)

Piping designer and field walk-downs (TAR); work with inspection engineering; prepare inspection packages; piping

designing using AUTOCAD 2013; perform field verifications for TAR red lines; working from P&IDs in the field;

inspection of Isometrics and filing to Documentum; maintaining a schedule of activities and recording back logs of work

to be performed; work with a team of field piping designers and engineers as well as inspection department supervisors.

SUPERIOR ENGINEERING LLC, HAMMOND, IN @ BP PLANT (1/2013 TO 4/2013)

BP refinery modernization project (Fluor); Field Engineer QA/QC – working from P&IDs and Isometric drawings; insure

that contractors comply with work specifications. Walk-downs for P&IDs and ISOs. Review the existing standard

documentation for BP Operations Center. Incorporated standard hydro-testing control procedures. Conduct procedures

for quality assurance. Conducting walk-downs and punch list for hydro-test. Perform any other duties deemed necessary

by project manager. Submit monthly progress reports. QC inspections on pipe fitting/welding and structural. Perform

inspection of various items and equipment. Strong knowledge and comprehension of regulations and codes related to QC

issues.

SUPERIOR ENGINEERING LLC, HAMMOND, IN @ BP PLANT (6/2012 TO 8/2012)

Piping designer and field walk-downs (TAR); work closely with project engineer doing all phases of a project. Equipment

and piping layouts including drawing and checking. Also drawing ISOs and spools; field walk-downs from P&IDs and

locate tie-ins in the field. Work with AUTO-CAD 2011/2012.

CH2MHILL, SPARTANBURG, S.C. (INDORAMA PLANT) (2/2012 to 4/2012)

ALBERT SHINDER *******@***.***

Hammond, Indiana 219-***-****

Piping design, checker for system walk-downs working from P&IDs; field surveying and data gathering of existing piping

systems. Locating tie-ins field routing of new pipe lines. Drawing layouts and using pipe specifications P&IDs and detail

design standards. Prepare final piping design drawing package. Also checked piping isometrics according to

specifications and field walk-downs.

EXXON AND MOBIL REFINERY (2009 to 2011)

Piping designer and checker for 20 draftsmen; demonstrated the ability to transfer plant sketches and layouts to

engineer designs. Experience in developing bills of materials specifications into drawings. Working from

P&IDs and instrumentation drawings working with Microstation SE.

ACS SERVICE INC. Project Manager/Mechanical Field Engineer (1993 to 2009)

Self-employed and general construction manager of a crew of 4 to 6 men to do mechanical pipe fitting for

industrial boilers and heat exchangers. Also installed small bore pipe for boilers in a chemical refining company,

small metering station, and some pump system. Project manager for some large projects. The work entails

leading engineers and designers in development of project drawings such as PFDs, P&IDs. General layouts,

piping plans and elevations, piping isometrics, structural drawings; also working with AutoCAD 2007 &

2011.

EXXON & MOBIL REFINING CO. (1992 to 1993)

Working with AutoCAD & Microstation CAD, industrial piping, and equipment arrangement and design work.

Field surveying, checking design drawings, making detail sheets for hangers. Laying out equipment

arrangement. Also responsible for the design modifications of new and existing process for HP steam, etc.

SUN REFINING AND MARKING CO., MARCUS HOOK, PA (1990 to 1992)

Piping designer and drafter of chemical process piping throughout the refinery. Layouts of isometrics and bills

of material, field sketching, and surveying elevations. Also lay out piping and equipment from P&IDs.

MOBIL REFINING CO., PHILADELPHIA, PA (1989 to 1990)

Piping design and layout all types of process piping for pumps, tank fields, and meter stations. Bills of material

piping details for fabucation. Also surveying existing structural steel in order to construct all piping system and

field sketching AS-BUILDs.

ALBERT SHINDER *******@***.***

Hammond, Indiana 219-***-****

CONTRACTOR FOR SEVERAL JOB SHOPS (1980 to 1989)

Designing & drafting of nuclear and process piping systems. Design of turbine pumps and related piping.

Designing of hangers for piping systems and troubleshooting field related problems. Checking piping drawings,

ISOs and details, and bills of material. Also providing construction documents for review and issue for

construction facility systems (water, chemical, gases).

BECHTEL CORP., BALTIMORE, MD (1978 to 1980)

Design and layouts of piping systems, piping details, bills of material, isometric and plant layouts, and pipe

support design for nuclear power plants.

GENERAL DYNAMICS, GROTON, CT (1977 to 1978)

Work on Trident Nuclear Submarines design and layouts of hangers and piping systems bill of materials, walk-

downs and sketches for fab shop.

ANDERSON AND MAHAFFY ENGINEERING, WILMINGTON, DE (1975 to 1977)

Work on drafting board - drawing piping details, bills of material, and HVAC details.

B F SHAW ENGINEERING CO., WILMINGTON, DE (1973 to 1975)

Work as a piping detailer, estimator, and material take-off person so engineers can place bids for job fab.

EDUCATION

Delaware Technical & Community College, Stanton, DE

• Computer Aided Engineering Drafting & Design Technology (Intro to AutoCAD) (2010 to 2011)

• Calculus 1&2 (1974 to1975)

• (Training Program--6 month) electronics, hands-on with machines and blue print and schematic diagram

reading. (1984)

New Castle Country Vocal Technology School, Wilmington, DE

ALBERT SHINDER *******@***.***

Hammond, Indiana 219-***-****

• Heating & Air Conditioning Technology (1985 to 1986)

• Electrical Technology 1 & 2 (1994 to 1995)

Wilmington High School- Engineering Drafting Technology. Wilmington, DE - Graduated 1972

New Castle County Department of Public Works Division of Development and Licensing

ACS SERVICE, INC - Mechanical contractor Licensed 1984 to present.