Robert F. Rains
NAME: Robert F. Rains Highest Security Clearance Level III SA (Secret) currently not active.
TITLE: Manufacturing Engineer, Corrective Action Lead Final Assembly 747-8 Sections,
Empennage, Fuselage and Floor Beams.
TECHNICAL
SPECIALTY: Manufacturing Engineer
EDUCATION: Two year diploma earned as Airframe/Power Plant Aviation Tech., Andrews University.
EXPERIENCE: I have obtained a well rounded knowledge of the manufacturing build process starting
from actual design work at the detail level up through assembly of the final product.
I have gained a vast knowledge of communication/management skills during my years as
A leader. I have successfully filled the role of Manufacturing Engineer and Planner.
Most recent skills gained during implementation of SAP from the legacy system MCSII.
I was in charge of cleaning up our legacy data for conversion to SAP. I lead a team of
planners and ME’s in this effort and was hands on helping in the clean up. I helped
develop the ME/Planners training guides and taught all the classes. After go live I worked
with the SAP programmers to help restore several of our transactions that were not
available in SAP. I lead an ME counsel that met twice weekly to resolve pending SAP
conversion issues.
I currently have 16 months hands on experience working in SAP as an ME/Planner role.
2013 – 2014 Triumph Aerostructures, Contractor Aerostructures
Assigned as ME/Planner
Responsibilities included Lead Production planner, start up program for Boeing 767
Tanker and Embraer 190 series Jet.
2012 – 2013 Bell Helicopter, Contractor PDS Tech
Assigned as ME/Planner
Responsibilities included producing supplier planning, working with direct employees
on How To Guides on the new systems after SAP implementation and training. Worked
with the Design Engineers on updating the Supplier Data Information.
2011-2012 Triumph Aerostructures, Vought Aircraft Division
Assigned Lead Corrective Action Team.
Responsible for all corrective actions, internal and external findings 747 and 767
program. This includes writing all corrective action planning such as MOD plans in SAP,
all floor support changes in SAP and MES. Responsible for the corrective action board
an conducting quality metrics monthly and quarterly reviews.
2008-2011 Vought Aircraft Industries, Inc., MSF Site
Assigned as Lead ME responsible for the start up program planning on 747-8 Freighter
and Passenger (IC). This is the new stretched version of the 747.Daily assignments are
given out to support the TEIR IV schedule for delivery of product on time. Cost and
Quality are monitored on a daily basis to ensure the high performance and that all
customer expectations are met. Responsible to answer for all audits being conducted, to
include in-house audits, customer audits and any escapes (NOE’s).
2007– 2008 Vought Aircraft Industries, Inc., CHS Site
Assigned as Lead ME over Cell 215. This is the last cell before delivery of the 787’s 47
and 48 sections to the customer. Responsible to ensure manufacturing has a complete
build package. I had a total of 8 ME/PE’s and 7 DE’s between 1st and 2nd shift supporting
180-200 mechanics and their build package needs. Daily assignments were given out to
support the known deficient build packages with progress checks as we go.
Also responsible for training newly assigned employees in the use of MES, IVT and
MESNC to support OPS. This was a hands on position, I was actively involved in making
planning changes, investigating parts issues as required to keep the shop moving forward.
This required extensive knowledge of assembly build up and investigation of the many
parts issues that come with a new program.
1995 - 2007 Project Manager
Responsible for all detail Production Engineering activities at Dallas including
interviewing, training, performance assessments and career paths for direct assigned
employees. Program responsibility includes C17 Airlifter, E2C Hawkeye, FA18, CH-60
Boeing 737,747,757,767,777, Gulf Stream GV and Boeing AFA program.
Responsible for cost and schedule of all assigned programs. All budget issues
negotiated with the Program Office and the IPT Leaders. Responsible for Program
support at the manpower resource level. Responsible for a three month look ahead
report to maintain manpower and keep Senior Management informed of hiring or
reduction needs.
1994 - 1995 Senior Logistics Engineering Specialist
Analyze engineering drawings to prepare provisioning technical documentation in
accordance with MIL-STD-1552/1561 and Contract Provisioning Requirements.
1991 - 1994 Technical Project Manager, Assembly Production Engineering, Level II Manager
Responsible for cost / schedule on the B2 Stealth Bomber Program. Responsible to the
CPE, Chief Projects Engineer for all program related issues. Interface with internal and
external customers to insure a quality product and customer satisfaction. Heavy travel
involved due to tri-company meetings.
1988 - 1991 Senior Production Engineering Specialist
Interpret aerospace designs and specifications as a basis for designing manufacturing
build sequences and shop floor personnel work instructions manuals. Expedite and
facilitate the manufacturing process by updating shop instructions on production
line as required.
1987 - 1988 Production Forman
Responsible for all phase’s final assembly on all major sections of the B2 Bomber.
1986 - 1987 Production Assembler
Assigned to mock-up of the B2 prototype. Assumed responsibility for buildup of
the aft major structure. Assumed all training of new employees to aft section.
Employment history prior to Vought Aircraft Industries available upon request.
References available upon request.