EDWAR ALEXANDER MARCELO GORDILLO
Address Cra **ª 65ª 76
Bogotá, Colombia
Cell phone 314-***-****
E mail: *****.*******@*****.***
Skype: Sophos_e
url.: https://www.linkedin.com/profile/view?id=208657348&trk=nav_responsive_tab_profile
PROFESSIONAL PROFILE
Mechanical Engineer specialized on Engineering Project Management, experience on Industrial Design and
Assembly Engineering. Ability on analysis, planning and project control, based on practices of the PMI.
Management and resources control abilities, along with lea dership abilities, emotional intelligence and
adaptability to changes.
PROFESIONAL STUDIES
EXTERNADO UNIVERSITY (Bogotá)
Magister Business Administration 2013 - On progress
EAN UNIVERSITY
Specialist on Engineering Project Management. - 2009
NACIONAL UNIVERSITY OF COLOMBIA (Bogotá)
Mechanical Engineer. March 2002
SKILLS
Proficient in SAP/PS, Excel, Ms Project. Good knowledge in Primavera, Risk for Project.
B1 Level of English “World Street English”
EXPERIENCE AND ACHIEVEMENTS
VQ INGENIERIA SAS
Contract Provision of administrative support services for projects of the investment portfolio by the
Technical Management and Development of the Vice President Production
Project: Secondary Recover Yarigui drilling field and Aditional Develop of Yariguí drilling field. Aprox Cost MUS$ 700
Position: Programing
Duties:
- Programming, follow up and scope control, time and cost of the project
- Analysis of the critical route
- Follow up to the performance and critical activities that affect the contract fulfillment.
- RISK analysis by the Montecarlo method for the fulfillment of tasks and milestones .
- Analysis and follow up of the EV indicators (Earn Value),, IEP, IEC; AC .
Immediate boss: Mario Olmos – Project Manager
April 9, 2014 – at present
CONSORCIO DATABANK – DISMET
Contract: Provision of support to the Integrated Project Management Information of technical production
asset in phases 4 and 5
Project: UPSTREAM PRODUCTION BOOK Aprox Cost MUS$ 10
Position: Project Control Engineer - PMO
Duties:
- Programming, follow up and scope control, time and cost of the project
- Analysis of the critical route
- Follow up to the performance and critical activities that affect the contract fulfillment.
- RISK analysis by the Montecarlo method for the fulfillment of tasks and milestones .
- Analysis and follow up of the EV indicators (Earn Value),, IEP, IEC; AC .
Immediate Boss: Amparo Sarmiento – Legal Representative
January 20, 2014 – April 7, 2014
VQ INGENIERIA SAS
Project: Modernization of Barrancabermeja s Refinery ECOPETROL Aprox Cost MUS$ 5100
Position: Cost Control Engineer
Duties:
- Participate in the establishment of project cost baseline
- Responsible for the budget control
- Prepare incurred cost forecast, monitor commitment to budget and actual costs
- Provide inputs to internal and external project cost reports
Immediate Boss: José Heliodoro Rubio, Planning and Control Lead
March 21, 2012 – December 15, 2013
LAVALIN S.A (Itansuca)
Contract 5209394: Consulting for the Integral Management for ECOPETROL S projects
Project: Gas transmission Line Cupiagua-Cusiana Aprox Cost MUS$ 200
Position: Programming and Control professional.
Duties:
- Programming, follow up and scope control, time and cost of the contract
- Analysis of the critical route
- Follow up to the performance and critical activities that affect the contract fulfillment.
- RISK analysis by the Montecarlo method for the fulfillment of tasks and milestones, which are
input for the decision making with credibility degrees.
- Analysis and follow up of the EV indicators (Earn Value),, IEP, IEC; AC.
Immediate Boss: Ricardo Henriquez, Project Manager
July 13, 2011 – January 12, 2012
TECNICONTROL S.A
Contract: Administrative Technical Management of the work, construction, services, shopping and other
ECOPETROL s Projects
Project: Pipeline Pozos Colorados-Galán (Length 510km, 14in) Aprox Cost MUS$ 500
Position: Programming and Control professional
Duties:
- Programming, follow up and scope control, time and cost of the contract.
- Follow up to the performance and critical activities that affect the contract fulfillment
Immediate Boss Yony Torres Agressot, Managing Coordinator
December 1, 2010 – July 11, 2011
ITANSUCA S.A
Contract 5202958: Integral Consulting for project management for ECOPETROL s Projects
Project: Pipeline Pozos Colorados – Galán (510km) Aprox Cost MUS$ 500
Position: Programming and Control professional - Pailitas Cesar (Length 510Km, 14in)
Duties:
- Follow up and scope control, time and cost of the contract.
- Analysis of the critical route by PERT method.
- Follow up to the performance and critical activities that affect the contract fulfillment -
Immediate Boss: Alvaro Leon, Programming and Control Coordinator
August 2, 2010 – November 30, 2010
CONSORCIO ITS (Ismocol - Termotécnica Coindustrial - Sadeven)
Project: Hydro treating Plant Construction, Barrancabermeja – ECOPETROL Aprox Cost MUS$ 1000
Position: Project Control Engineer
Duties: Planning, programming and installation of pipeline control using P3 (Primavera Project Planner)
Immediate Boss: Eng. Alberto Niño, Field Technical office Manager
Tel Bogotá.: 571-***-**** - 571-***-**** - 571-***-****
June 8, 2009 – June 10, 2010
CONSORCIO ITS (Ismocol - Termotécnica Coindustrial - Sadeven)
Project: Hydro treating Plant Construction Barrancabermeja – ECOPETROL Aprox Cost MUS$ 1000
Position: Project Engineer Specialist
Duties: Global Fixed Price Determination Contract "Construction, procurement and supply of
equipment, commissioning, acceptance testing”
Immediate Boss: Alonso Giraldo, Head Engineer. “Open Book
April 16, 2008 – June 7, 2009
SIAM E.U (Automation Engineering Services and Maintenance)
Project: “Primary Benefit Monitoring System Plant UNIPALMA” Aprox Cost KUS$ 200
Possition: Project Engineer and manager
Duties: Plant Design using CAD tools (Solid Works)
Mechanical design for assembling instrumentation. Management, mechanical and
electrical instrumentation, elements involved in the monitoring system of the Primary Benefit Plant.
Immediate Boss: Pablo Soler, Manager Cel.: 300-***-****. Tel.: 571-***-**** – Bogotá.
9 December, 2007 - 23 March, 2008
TETRAPAK LTDA
Project: Pulp Pasteurizer Construction Aprox Cost KUS$ 100
Position: Project Engineer
Duties: Direction and management, mechanical assembling of Pulp Pasteurizer for Frozen
Tropic(Ecuador). Preparation of technical documentation and assembly.
Immediate Boss: Fredy Triana (Tetrapak Ltda.) Tel.: 6283660
October 25, 2007- November 25, 2007
TETRAPAK LTDA
Project: Design and Construccion CIP system for Coca-Cola Plant. Aprox Cost MUS$ 1,5
Position: Project Engineer
Duties: Design and modification of 2 mixing, cooling and carbonating of beverage equipment,
CIP design lines and changes in product lines and mixing vessels, with their correspondent technical
documentation and drawings.
Pulp pasteurizer: Frame design, product lines and balance tank, water heating system, interconnecting
lines between the hot water system and heat exchanger, and other interconnection lines. Plans.
Immediate Boss: Juan Carlos Hernandez / Fredy Triana. 571-***-****
July 24, 2007- October 25, 2007
“ITECNE” Specialized Engineers and Technicians
Position: Administrative Manager
Duties: Assembly and maintenance management, mechanical, electronic, networking and locative.
Immediate Boss: Eng Fredy Mancera
October 2005- April 2007
Tel.: 571-***-****
ITECNE - MEALS DE COLOMBIA S.A
Position: Advisor Engineer
Duties: "Maintenance-lubrication Advisory”, Preventive maintenance routines (mechanical, electrical,
lubrication and structured on SAP format, Analysis of lubricants for use in food and definition of
machinery routes lubrication, improvement of lubricant management systems, fault detection and
reporting of alternative. Lubrication fundamentals training to operators and staff.
Immediate Boss: Sebastián Giraldo Head of Industrial Maintenance
October 15 of 2005 -- May 15 of 2006
Tel: 571-***-****- ext 9209
CORPORACION COLOMBIANA DE INVESTIGACION AGROPECUARIA CORPOICA
Position: Eng. Consultant-Advisor
Duties: Project “Study and implementation of machinery involved in the process of obtaining starch and
flour from tubers promising (Achira, Ñame, Arracacha)” and “Design and Construction for the Masato
de Achira Tamiz”
Immediate Boss: Eng. Msc. Gonzalo Rodríguez Borray – Eng Hugo Reinel Garcia
Tel: 4 22 73 43 o 4 22 73 00 ext. 1208
July 2002- April 2003
SOLAR ENERGY APPLICATIONS
National Congress of Mechanical Engineering Paper II
Topic:” Use of solar energy as alternative source of energy”
Sub-topics: Collector-concentrators, water heating systems and heating.
Universidad Nacional de Colombia October - November 2001
HYDROELECTRIC CHIVOR
Position : Mechanical Maintenance Auxiliary Coordinator
Contract services Mahecha & Mahecha
Immediate Boss: Eng. Jairo Guerrero
February-October 1998
520 142 Santa María Boyacá, 6236660 Bogotá
REFERENCES
Eng. Msc. Javier Mondragón
Project Engineer Ecopetrol – Colombia
571-***-**** ext 82922
EDWAR ALEXANDER MARCELO G.
CC. 79.713.841 Bogotá