Post Job Free
Sign in

Engineer Mechanical

Location:
Mississauga, ON, Canada
Posted:
December 28, 2014

Contact this candidate

Resume:

SABBEHE-UR-REHMAN

**** ********* *****, ***********, ** L5V 2N5

(R) 905-***-****, (C) 647-***-****

acg6cy@r.postjobfree.com

OBJECTIVE: Versatile, accomplished engineering management professional with

proven expertise in oil/gas/petrochemical/energy-Projects and with

direction and oversight of all mechanical design aspects of different

rotating Equipments used in oil fields along with Technical Support to

installation, commissioning seeking position as a MECHANICAL ENGINEER in

Petrochemical & Energy Industries.

PROFILE

. Member of American Society of Mechanical Engineers (ASME Member #

7349749)

. Extensive experience as a Mechanical Engineer in the oil, gas and

power generation industry

. Outstanding performer, strong problem-solver and ability to work under

pressure to meet targets

. Solid presentation, communication and interpersonal skills

. Advanced interpersonal and project management skills to facilitate

team efforts

. Effective time-management and organizational skills.

RELEVANT PROFESSIONAL EXPERIENCE

Rotating Equipment Engineer

Dayim Punjlloyd/ SATORP (Saudi ARAMCO & Total) Package 9 April 2012-

Till Date

. Worked on SATORP Package No 9 in Jubal, KSA as Rotating Equipment

Engineer and responsible for installation and commissioning of the

various rotating equipments.

. Supported project groups during construction and commissioning of

various rotating equipment including unloading pump ( Make Flowserve)

and steam Turbine ( Make Elliot)and ensured the compliance of correct

standards and procedures.

. Managed and directed Rotating Equipment site personnel and ensured

that all work was carried out in accordance with approved standards,

procedures and contract specifications.

Mechanical Engineer

WorleyParson Canada Ltd, (Edmonton Division, AB)

Oct 2011-April 2012

. Supported CAD checking and incorporation of comments.

. Supported engineering/design technical checking and incorporation of

comments.

. Actively involved in the resolution of interdisciplinary, vendor,

department and client issues before elevating to department management

team.

. Supported health, safety, and environmental (HSE) programs.

. Participated in establishment of project scope, cost, and time

requirements with the client, and maintain the engineering scope

control documents, engineering cost estimates, and engineering

project schedule.

. Determine the project scope battery limits with the local utility,

other consulting companies, and equipment vendors providing

information and back check the construction cost estimate and

construction schedule.

. Maintain a record of client preferred design options, client

preferred equipment

configurations and scope changes.

. Prepares engineering calculations for sizing and selection of various

rotating equipments.

. Writes final report and makes recommendations.

. Support standardization of equipment specifications/data

sheets/selection.

. Enforce adherence to regulatory codes and standards.

Rotating Equipment Engineer

Petro Ex Canada Inc.

2007-2011

Richmond Hill, On

. Worked on the Khoms-Tripoli Gas Transmission Project

. Actively involved in timely review/approval of engineering

documentation for KTGP Project submitted by contractors, in line

project specification and overall projects objectives.

. Assisted Project Manager for the LLI bidders list.

. Ensured application of correct codes, standards and design engineering

practices in the design and development of mechanical systems

. Provided expert advice to engineers in mechanical design and guided

them in the selection of major mechanical equipment

. Ensured consistency in the approach in designing and specification and

selection of various rotating equipments.

. Provided technical advice to other divisions and departments on all

mechanical engineering related matters

. Worked with ILF Consulting Engineers (Warsaw office) as client

representative and responsible for reviewing and approving e the

technical specifications

. Attended FAT of six MAN Gas Turbine and balancing of six compressors

rotors at MAN Turbo workshops in Berlin and Oberhausen Germany

. Attended FAT of four Screw type Air Compressors at Atlas Copco in

Antwerp Belgium

. Participated with Germanischer Lloyds in the Hezop study

. Supported project groups during construction and commissioning and

ensured that correct standards and procedures were adhered to.

. Managed and directed Rotating Equipment site personnel and ensured

that all work was carried out in accordance with approved standards,

procedures and contract specifications.

. Attended FAT of six Firefighting Pumps along with their accessories at

Patterson Pumps Inc. Georgia, USA.

Operation Support Engineer

Petroleum Development of Oman, (Muscat, Oman)

2004- 2007

. Conducted baseline survey for GGP Plant at Yibal to assess the

current condition and remnant life of the existing facility.

. Analyze rotating equipment failures & recommend actions to prevent

recurrence.

Monitor rotating equipment reliability/Availability and provided

advice

. As a member of the Team, execute respective assigned actions detailed

in the HSE Plan. Provide input for the formulation of HSE Plans, HSE

Cases & Audits.

. Ensure equipment requiring major overhaul/repair are properly review

and analyze confirming the recommendations and provide diagnostic

advice to Asset Teams on integrity deterioration, scheduling

and planning of corrective maintenance actions.

. Review and optimize RE strategies, work practices & procedures.

Develop & maintain RE maintenance standards.

. Witness FAT; Stage & final inspection during repair of rotating

equipment.

. Review of RE repetitive failures/problematic machines and

seek/recommend solution for longer term improves reliability.

. Worked with Marshall Institute on Total Reliability program with the

objective of improving the reliability and MTBF of the rotating

equipments with poor reliability.

Mechanical Engineer ( Co-op)

2000-2004

All Canadian Engine Services Inc. (Mississauga, Ca.)

. Analyzing rotating equipment failures, identifying root causes, and

developing & implementing engineered solutions to improve reliability.

. Prepare reports and recommend changes in quality control procedures.

. Assisted in reconditioning of 650KW diesel generating set and design

the test procedure for the Marathon diesel generator.

Chief Operating Engineer

1993-2000

Genertech Limited

. Actively involved from feasibility study to start-up of thermal power

plant

. Successfully completed project in record time to meet scheduled

deadlines

. Responsible for commissioning of project resulting in early power

supply to network

. Monitor key reliability performance indicators (MTBF).

. Monitor equipment performance and troubleshoot of rotating equipment

problems. and provide technical support to area maintenance personnel

. Obtain the data during vibration analysis and isolate the trouble,

thereby eliminating the guess work commonly associated with equipment

repair and will help to reduce maintenance cost

. Supervised daily technical and operational activities through

effective communication among team resulting in optimum productivity

Maintenance Engineer Rotating Equipment

1990-1993

National Refinery Limited,

. Supervised commissioning /Start-up, routine maintenance and daily

troubleshooting of various rotating equipment: i.e. Steam Turbines;

Reducers, Compressors (both centrifugal and reciprocating), Pumps and

Turbo Expanders.

. Maintained reliability of equipment above standards using strict

preventative maintenance

. Monitoring and trending rotating equipment conditions on a regular

scheduled basis to determine the condition of those parts subject to

wear.

. Supervised On-site balancing resulting in increase the productivity

of a machine by reducing the overall vibration while reassuring the

reliability of the machine and minimizing downtime and maintenance

cost.

. Alignment of different rotating equipments resulting in reducing undue

axial and torsional stresses on mechanical equipment and increase

reliability while decreasing downtime and maintenance cost.

. Actively involved in out vibration analysis and balancing of large

rotating equipments.

. Participated in annual turnaround of plant resulting in increased

efficiency

Rotating Equipment Engineer

1980-1989

Electric Supply Corp.

. Supervised installation and commissioning of Combined Cycle Power

Plant

. Carried out daily troubleshooting and established standards for:

testing,

. inspection, maintenance of equipment in accordance with engineering

principles and safety standards minimizing forced outage hours.

. Monitored performance of gas turbines per ISO procedure, recording

power loss in thermal unit and implemented measures to improve

thermal efficiency & reduce cost.

. Actively involved in computer blade sequencing for positioning of

blades on rotor to zero balance with the additive weight in order to

ensure the proper placement of blades on rotors to minimize initial

unbalance and to reduce shop and field balancing requirements

. Life-assessment of all steam and combustion turbine/generator sets and

other large rotating equipment

. Disassembled, inspected and repaired parts of Gas Turbine thereby

reducing cost.

Reference Codes / Standards familiar with: relevant ASME codes, API and

other relevant standards in Oil, Gas, Chemical and Petro Chemical

Industries.

Education/Training and Professional Affiliations

Bachelor of Engineering (Mechanical) 1978

NED University of Engineering and Technology

Certification of Operation and Maintenance of Gas Turbines from Hitachi

works, Hitachi City, Japan

Maintenance of Gas Turbines General Electric of U.S.A.

Operation/Maintenance Training at Mw Thermal power plant, Electric

Supply Corporation

Completed in class course for Project Management, Professional (PMP)



Contact this candidate