SABBEHE-UR-REHMAN
**** ********* *****, ***********, ** L5V 2N5
(R) 905-***-****, (C) 647-***-****
******@*****.***
OBJECTIVE: Versatile, accomplished engineering management professional with
proven expertise in oil/gas/petrochemical/energy-Projects and with
direction and oversight of all mechanical design aspects of different
rotating Equipments used in oil fields along with Technical Support to
installation, commissioning seeking position as a MECHANICAL ENGINEER in
Petrochemical & Energy Industries.
PROFILE
. Member of American Society of Mechanical Engineers (ASME Member #
7349749)
. Extensive experience as a Mechanical Engineer in the oil, gas and
power generation industry
. Outstanding performer, strong problem-solver and ability to work under
pressure to meet targets
. Solid presentation, communication and interpersonal skills
. Advanced interpersonal and project management skills to facilitate
team efforts
. Effective time-management and organizational skills.
RELEVANT PROFESSIONAL EXPERIENCE
Rotating Equipment Engineer
Dayim Punjlloyd/ SATORP (Saudi ARAMCO & Total) Package 9 April 2012-
Till Date
. Worked on SATORP Package No 9 in Jubal, KSA as Rotating Equipment
Engineer and responsible for installation and commissioning of the
various rotating equipments.
. Supported project groups during construction and commissioning of
various rotating equipment including unloading pump ( Make Flowserve)
and steam Turbine ( Make Elliot)and ensured the compliance of correct
standards and procedures.
. Managed and directed Rotating Equipment site personnel and ensured
that all work was carried out in accordance with approved standards,
procedures and contract specifications.
Mechanical Engineer
WorleyParson Canada Ltd, (Edmonton Division, AB)
Oct 2011-April 2012
. Supported CAD checking and incorporation of comments.
. Supported engineering/design technical checking and incorporation of
comments.
. Actively involved in the resolution of interdisciplinary, vendor,
department and client issues before elevating to department management
team.
. Supported health, safety, and environmental (HSE) programs.
. Participated in establishment of project scope, cost, and time
requirements with the client, and maintain the engineering scope
control documents, engineering cost estimates, and engineering
project schedule.
. Determine the project scope battery limits with the local utility,
other consulting companies, and equipment vendors providing
information and back check the construction cost estimate and
construction schedule.
. Maintain a record of client preferred design options, client
preferred equipment
configurations and scope changes.
. Prepares engineering calculations for sizing and selection of various
rotating equipments.
. Writes final report and makes recommendations.
. Support standardization of equipment specifications/data
sheets/selection.
. Enforce adherence to regulatory codes and standards.
Rotating Equipment Engineer
Petro Ex Canada Inc.
2007-2011
Richmond Hill, On
. Worked on the Khoms-Tripoli Gas Transmission Project
. Actively involved in timely review/approval of engineering
documentation for KTGP Project submitted by contractors, in line
project specification and overall projects objectives.
. Assisted Project Manager for the LLI bidders list.
. Ensured application of correct codes, standards and design engineering
practices in the design and development of mechanical systems
. Provided expert advice to engineers in mechanical design and guided
them in the selection of major mechanical equipment
. Ensured consistency in the approach in designing and specification and
selection of various rotating equipments.
. Provided technical advice to other divisions and departments on all
mechanical engineering related matters
. Worked with ILF Consulting Engineers (Warsaw office) as client
representative and responsible for reviewing and approving e the
technical specifications
. Attended FAT of six MAN Gas Turbine and balancing of six compressors
rotors at MAN Turbo workshops in Berlin and Oberhausen Germany
. Attended FAT of four Screw type Air Compressors at Atlas Copco in
Antwerp Belgium
. Participated with Germanischer Lloyds in the Hezop study
. Supported project groups during construction and commissioning and
ensured that correct standards and procedures were adhered to.
. Managed and directed Rotating Equipment site personnel and ensured
that all work was carried out in accordance with approved standards,
procedures and contract specifications.
. Attended FAT of six Firefighting Pumps along with their accessories at
Patterson Pumps Inc. Georgia, USA.
Operation Support Engineer
Petroleum Development of Oman, (Muscat, Oman)
2004- 2007
. Conducted baseline survey for GGP Plant at Yibal to assess the
current condition and remnant life of the existing facility.
. Analyze rotating equipment failures & recommend actions to prevent
recurrence.
Monitor rotating equipment reliability/Availability and provided
advice
. As a member of the Team, execute respective assigned actions detailed
in the HSE Plan. Provide input for the formulation of HSE Plans, HSE
Cases & Audits.
. Ensure equipment requiring major overhaul/repair are properly review
and analyze confirming the recommendations and provide diagnostic
advice to Asset Teams on integrity deterioration, scheduling
and planning of corrective maintenance actions.
. Review and optimize RE strategies, work practices & procedures.
Develop & maintain RE maintenance standards.
. Witness FAT; Stage & final inspection during repair of rotating
equipment.
. Review of RE repetitive failures/problematic machines and
seek/recommend solution for longer term improves reliability.
. Worked with Marshall Institute on Total Reliability program with the
objective of improving the reliability and MTBF of the rotating
equipments with poor reliability.
Mechanical Engineer ( Co-op)
2000-2004
All Canadian Engine Services Inc. (Mississauga, Ca.)
. Analyzing rotating equipment failures, identifying root causes, and
developing & implementing engineered solutions to improve reliability.
. Prepare reports and recommend changes in quality control procedures.
. Assisted in reconditioning of 650KW diesel generating set and design
the test procedure for the Marathon diesel generator.
Chief Operating Engineer
1993-2000
Genertech Limited
. Actively involved from feasibility study to start-up of thermal power
plant
. Successfully completed project in record time to meet scheduled
deadlines
. Responsible for commissioning of project resulting in early power
supply to network
. Monitor key reliability performance indicators (MTBF).
. Monitor equipment performance and troubleshoot of rotating equipment
problems. and provide technical support to area maintenance personnel
. Obtain the data during vibration analysis and isolate the trouble,
thereby eliminating the guess work commonly associated with equipment
repair and will help to reduce maintenance cost
. Supervised daily technical and operational activities through
effective communication among team resulting in optimum productivity
Maintenance Engineer Rotating Equipment
1990-1993
National Refinery Limited,
. Supervised commissioning /Start-up, routine maintenance and daily
troubleshooting of various rotating equipment: i.e. Steam Turbines;
Reducers, Compressors (both centrifugal and reciprocating), Pumps and
Turbo Expanders.
. Maintained reliability of equipment above standards using strict
preventative maintenance
. Monitoring and trending rotating equipment conditions on a regular
scheduled basis to determine the condition of those parts subject to
wear.
. Supervised On-site balancing resulting in increase the productivity
of a machine by reducing the overall vibration while reassuring the
reliability of the machine and minimizing downtime and maintenance
cost.
. Alignment of different rotating equipments resulting in reducing undue
axial and torsional stresses on mechanical equipment and increase
reliability while decreasing downtime and maintenance cost.
. Actively involved in out vibration analysis and balancing of large
rotating equipments.
. Participated in annual turnaround of plant resulting in increased
efficiency
Rotating Equipment Engineer
1980-1989
Electric Supply Corp.
. Supervised installation and commissioning of Combined Cycle Power
Plant
. Carried out daily troubleshooting and established standards for:
testing,
. inspection, maintenance of equipment in accordance with engineering
principles and safety standards minimizing forced outage hours.
. Monitored performance of gas turbines per ISO procedure, recording
power loss in thermal unit and implemented measures to improve
thermal efficiency & reduce cost.
. Actively involved in computer blade sequencing for positioning of
blades on rotor to zero balance with the additive weight in order to
ensure the proper placement of blades on rotors to minimize initial
unbalance and to reduce shop and field balancing requirements
. Life-assessment of all steam and combustion turbine/generator sets and
other large rotating equipment
. Disassembled, inspected and repaired parts of Gas Turbine thereby
reducing cost.
Reference Codes / Standards familiar with: relevant ASME codes, API and
other relevant standards in Oil, Gas, Chemical and Petro Chemical
Industries.
Education/Training and Professional Affiliations
Bachelor of Engineering (Mechanical) 1978
NED University of Engineering and Technology
Certification of Operation and Maintenance of Gas Turbines from Hitachi
works, Hitachi City, Japan
Maintenance of Gas Turbines General Electric of U.S.A.
Operation/Maintenance Training at Mw Thermal power plant, Electric
Supply Corporation
Completed in class course for Project Management, Professional (PMP)