Post Job Free

Resume

Sign in

Power Plant Project

Location:
Karachi, Sindh, Pakistan
Posted:
December 27, 2014

Contact this candidate

Resume:

Page*

CURRICULUM VITAE

Of

Name MUHAMMAD KHALID JAMIL

Date of Birth : 03/12/1964

Marital Status : Married

TELEPHONE NO. : +92-335*******

+92-323*******

Driving license Kingdom of Saudi Arabia(KSA)

Email Address: acg5v7@r.postjobfree.com

: mkhjamil

SKYPE ID

A/ 68 Sunny Pride Gulshan Iqbal

ADDRESS :

Rashid Minhas Road Karachi

Pakistan.

: Msc.(statistics), University of Karachi, Pak

QUALIFICATION

Bsc (Science), University of Karachi, Pak

CERTIFICATIONS;

CSWIP 3.1 TWI UK(Five Days Course)

Internal Quality Auditing( ISO 9001: 2008), From TUV NORD, KSA

ISO 9001 Awareness (Year 2008 Version),from TUV NORD KSA

TRAINING

Page2

Industrial hygiene (SABIC), KSA

Environment Awareness Program (SABIC),KSA

Emergency Control Plan(ECP)(SABIC), KSA

Total Quality Management(TQM)(SABIC), KSA

Cast Saving Program & Effort(SABIC), KSA

SAFETY TRAINING

ADVA ANCE FIRE SYSTEM CONTROL(SABIC), KSA

SAFE WORK AUTHORIZATION (PERMIT TO WORK) (SABIC), KSA

FIRE SYSTEM CONTROL & MONITORING (SABIC), KSA

PROCESS SAFETY MANAGEMENT (PSM ) (SABIC), KSA

OBJECTIVES & GOALS :

To aspire challenging and dynamic career in Mechanical, Piping, Welding

Quality controls & Quality assurance, where I can apply and improve my

knowledge and experience.

PROFILE :

More than 21 years of experience as QA/QC Mechanical, Piping, static & Rotatic

equipment, Compressor, Dryer, Heat Exchanger, Steel structure, Civil & Welding work

Inspection

QA/QC Mechanical Supervisor for projects related to Oil & Gas, Petrochemicals, Power

Plant of esteemed organization like SABIC, SWCC, Marafiq Yanbu, ENOC Refinery &

EMAL, Aluminum Smelter Plant UAE.

SKILLS AND ABILITIES:

Good knowledge of Construction, Inspection, Mechanical, Piping, Heat exchanger,

Furnace, Economizer,Static & Rotatic equipment, steel structure, Fire water Line,

Sprinkler, compressor & Dryer, Installation and inspection Testing, Pre

commissioning

Good knowledge of NDT activities.

Good knowledge in preparation and inspection of Hydro test pressure.

Page3

Good knowledge of ASME, API, SABIC & Saudi Aramco (SAES, SAEP) and other

International Standards.

Good knowledge of CIVIL/ structural work.

Capable of handling group of Inspectors and Workmen.

CERTIFICATE OF APPRECIATION

Naphtha Hydrotreater Reformer Project

ENOC Refinery, Dubai UAE

PTA & Petrochemical Project

IBN RUSHD (SABIC), Yanbu, KSA

Rotary Type Air Compressors & Dryers installation For STG Unit 1&2

MARAFIQ, YANBU, KSA

:

EMPLOYMENT HISTORY

JULY 2011 To MAR.2014 : Babcock Borsig Bilfinger Saudi Arabia

POSITION : QC INSPECTOR (Mechanical/PIPING/Welding)

PROJECT: Replacement of Economizer Inlet Header

CLIENT : SAUDI ELECTRICITY COMPANY RABIGH

PROJECT : Installation of Air Compressors & Dryers

CLIENT : MARAFIQ, YANBU

PROJECT : Fuel Oil System Up Grade at Qurayyah Power Plant

CLIENT : SAUDI ELECTRICITY COMPANY( SEC DAMMAM)

Aug. 2010 To MAY.2011 : PEOPLES STEEL MILLS LTD

POSITION: MECHANICAL INSPECTOR

SEPT.2009 To JUNE.2010 : Dutco McConnell Dowell, UAE

Page4

PROJECT: EMAL, ALUMUNIUM SMELTER PLANT

ABU DHABI UAE

CLIENT: WORLEY PERSON & SNC LAVLAN

POSITION : QA/QC SUPERVISOR (Mechanical/Piping/Welding)

JAN.2008 To SEPT.2009 : Dutco McConnell Dowell, UAE

PROJECT: ENOC, Naphtha Hydrotreater Reformer

CLIENT : FOSTER WHEELER

POSITION: QA/QC SUPERVISOR(Mechanical/Piping/Welding)

APRIL 1995 To FEB.2006 : ARABIAN INDUSTRIAL PETROCHEMICAL &

FIBER COMPANY IBN RUSHD (SABIC), KSA

PROJECT: PTA, Polyester(POY) & Fiber Plants.

CLIENT : SABIC (SAUDI ARABIAN BASIC

INDUSTRY CORPORATION),KSA

POSITION : QA/QC SUPERVISOR/LEAD OPERATION/Mechanical)

POSITION : LEAD OPERATION(Maintenance)

FEB.1990 To MAR.1995 : S.G FIBER COMPANY LTD. PAKISTAN

POSITION : QA/QC ASSISTANT MANAGER /

ASSISTANT PRODUCTION MANAGER

RESPONSIBILITIES :

Directly coordinate with the contractors regarding project activities such as the

construction, installation, maintenance, support, documentation, and testing

activities to ensure compliance with codes, standard, specification and client’s

requirements.

Page5

Monitoring and inspecting the installation and testing of all mechanical equipment,

piping and control systems to include underground utilities, fire protection, above

ground utilities (steam, water, air), HVAC and process systems.

Perform inspection compressor, Dryers, Heat Exchanger, Economizer, Debris

Filter, Steel structures, static & rotating equipments installation as per approved IFC

drawings.

Perform Inspections, quality surveillance and ensure activities are completed as per

code, standard and approved drawings, Inspection and Test Plan [ITP].

Monitor all aspects of Quality Control relative to Mechanical /Civil /Structural work

activities during site preparation and installation

Reviewing operational process and installations to ensure that the subcontractors

comply with the design, standards and specifications of the contract documents.

Assisting to identify, respond to or evaluate field construction technical issues to

maintain the schedule and Verifying field measurements.

Perform inspection piping, fire water line and sprinkler installation and testing.

Perform inspection heat exchanger and installation as per approved issued for

construction (IFC) drawings.

Review of method statement and Inspection Test Plan with respect to project

specification.

Perform inspection final Hydro Test pressure including verification that pressure

gauges have adequate dial range and is calibrated. Verify that the testing pressure

does not exceed the allowable pressure of any equipment on the system. Verify that

the required test pressure was maintained for the specified length of time without

any leakage.

Perform inspection field testing for soil compaction, concrete testing and Marshall

sampling and review acceptance requirements.

Monitor Pre pour inspections of formworks, rebar, concrete, grout and embeds.

Reviewing and supervising subcontractor daily and weekly inspection reports

Periodic inspections to ensure correct Welding Procedure Specifications [WPS] are

being used, and in process requirements such as fit ups, pre heat etc. are being

followed .

Review of test packages, site inspection and preparation of punch list.

Review and submits the submittal of Request for Information (RFIs) to the Client.

Close out each RFI as work is completed per the disposition by the construction

group.

Review contractor procedures and personal qualification.

Page6

Review and approved required submittals.

Ensured that the appropriate consumable being distributes to the welders in order to

make sound weld.

Monitor Visual inspection and reporting of piping weld joints as per ASME

B31.1,B31.3,B31.4 & B31.8 standard.

Witness the Non destructive Testing (NDT) MT,PT,UT, LT & RT.

Witness materials inspection and verification with (MTC) certificates and project

specifications.

Monitoring all types of process document required for fabrication, erection and

Commissioning.

Monitor and control the fabrication activities as per ITP, specification, code &

standards, approved drawings and procedures record as per quality management

system.

Inspect spools just before erection to verify that interior is clear of foreign materials.

Perform inspection of Fit–ups and dimensional as per isometric and specifications.

Inspect joint preparation, joint configuration, and cleanliness and preheat temperature

as per WPS.

Confirm repairs, re testing and re inspection in accordance with the specifications.

Ensured that pipe supports, hangers and guides have been installed in accordance

with the piping drawings and the pipe supports details.

Ensured satisfactory identification of materials, proper protection of piping and

fittings. Verify proper size and schedule of pipe, proper rating and face of flanges.

Ensured that all welding inspection and NDT activities affecting the quality of welds

contained in each piping spools of an isometric have been completed and accepted.

Quality Control of welding consumables, parameters, and purge control, preheating.

and inter pass temperature control.

Coordination with client and raising NCR's & RFI's.

Monitors subcontractor inspection, testing and construction activities.

To confirm satisfaction of finished piping to technical requirements specified in the

code and specification.

Preparation and submission of daily site inspection activities.

Attend and contribute information during team meetings with regards to

current/outstanding issues and/or weekly progress.

Coordinate with the client for updating Project Quality Documents, Drawing Register

and transmittal.

Page7

Ensure Quality Management System is effective and controlled as per the scope of

the Project and ISO 9000:2008 requirements.

Conduct ISO 9001 internal audit independently.

Documentation of quality records as per ISO Standard.