Post Job Free

Resume

Sign in

Manager Engineer

Location:
Fort Wayne, IN
Posted:
December 28, 2014

Contact this candidate

Resume:

Jeffrey Schultz

***** ***** ****.

Fort Wayne, IN 46845

Cell 260-***-****

acg560@r.postjobfree.com

Objective: Obtain a position in production management that utilizes my

experience and education.

Education: Purdue University 1991 - 1996

Bachelor of Science in Electrical Engineering

Experience:

4/12- present Michelin Woodburn, IN

Business Unit Leader

. Responsible for production on tire machines in

my Business Unit

KPI's include

. OSHA

. Machine

. Quality

. Delivery

. Cost

. Standard

. Conduct daily meetings to update Business Unit

members on KPIs for the Business Unit

. Work with other departments on product flow,

upstream and downstream of tire building

machines to ensure proper mix of products

. Continuous improvement on flow and cleanliness

(BIB Standard/5S) within my Business Unit

. Ensure machines are maintained and preventative

maintenance were performed as schedule

. Work with cross functional teams to solve

issues within and outside of my own department.

. Determine manning need to meet production

targets

. Participate in planning sessions to determine

plan for improvements to meet next years plant

targets

10/04-12/10 Heraeus Electro-Nite Inc. Peru,

IN

1/10-12/10 Warehouse/Distribution Center Manager

Responsible for all incoming/outgoing shipments.

Reporting to the Director of Operations. Responsible

for manufacturing transition to other facilities.

Oversee production of product until production at other

facilities running. Direct reports consist of salary

and hourly employees. Direct reports consist of 30

employees. Well versed in SAP Software.

2/07-1/10 Manufacturing Engineer

Responsible for assisting Production and product

development, developing new lines and improving

existing lines. Reporting to the Plant Manager.

. Assist in scrap reduction.

. Assist with development of new products/product

improvements.

. Design of new production line that resulted in

$100,000 cost savings per year.

. Member of cost savings team to reduce costs.

. Responsible for plant inventory and adjustments.

. Continuous improvement with various production

lines

. New warehouse layout and product flow to promote

lean manufacturing

10/04-2/07 Production Supervisor

Responsible for managing 6 production departments.

Responsible for production on all 3 shifts for these

departments. Reporting to the Plant Manager. Direct

reports consisted of 25-30 hourly employees.

. Reduction of scrap by 10% per year.

. Increase labor efficiency.

. Greater than 98% on time delivery in my

departments.

. Part of start up team for SAP.

7/01-02/04 Essex Electric Inc. Columbia

City, IN

Warehouse

Performed general warehouse duties including loading

and unloading trucks, picking orders and creating ship-

supporting documentation.

1/97 -12/00 Group Dekko/Dekko Engineering Inc. Kendallville, IN

5/98 -12/00 Engineer/ Plant Manager

Responsible for managing a new plant startup and

engineering of the new product. Reporting to the Vice

President. Direct reports consist of production

supervisor as well as production personnel. Provided

technical assistance and customer assistance to most of

the top office furniture manufactures. Was in charge

of or part of every aspect of this product.

. Started manufacturing of a product including

creation of bills of material, raw material

suppliers, and production process.

. Created manufacturing process in BPCS.

. Work with Herman Miller and Steelcase on customer

prototype installations.

. Established a quality system for the product

following QS/ISO9000 guidelines

. Received 6 patents for the design of the product.

. Received 1 patent for changes in manufacturing

equipment to improve quality and ease of

manufacturing of the product.

. Prepared quotes and layout design for customers.

. Worked with marketing to create brochures and

marketing materials for the product.

. Created a website for the product.

. Forecast, ordered and responsible for inventory of

raw material.

. Set up lean manufacturing for this facility.

1/97 - 5/98 Electrical Engineer

Responsibilities included testing products,

failure analysis and design, reporting to the Vice

President of the laboratory facility

. Tested new parts and design changes to customer

specifications. These included environmental

simulation, thermal shock and life testing.

. Created tests to recreate and determine failure modes.

. Designed a new modular telecommunications product.

. Obtained UL certification for testing.

. Tested products to ASTM and Ford specifications among

others.

. Assisted in designing of a device that detected

microsecond failure in automobile taillights per

Ford specifications.

Military:

8/88 - 5/91 US Navy

Naval Nuclear Power Program

Honorably Discharged as E-4

Other Experience:

SAP, 5s, DFT, working Knowledge of Microsoft office,

Excel, Word, Power Point, Microsoft Outlook, BPCS, MRP I

and II, AS400

References available upon request



Contact this candidate