Jeffrey Schultz
Fort Wayne, IN 46845
Cell 260-***-****
*********@********.***
Objective: Obtain a position in production management that utilizes my
experience and education.
Education: Purdue University 1991 - 1996
Bachelor of Science in Electrical Engineering
Experience:
4/12- present Michelin Woodburn, IN
Business Unit Leader
. Responsible for production on tire machines in
my Business Unit
KPI's include
. OSHA
. Machine
. Quality
. Delivery
. Cost
. Standard
. Conduct daily meetings to update Business Unit
members on KPIs for the Business Unit
. Work with other departments on product flow,
upstream and downstream of tire building
machines to ensure proper mix of products
. Continuous improvement on flow and cleanliness
(BIB Standard/5S) within my Business Unit
. Ensure machines are maintained and preventative
maintenance were performed as schedule
. Work with cross functional teams to solve
issues within and outside of my own department.
. Determine manning need to meet production
targets
. Participate in planning sessions to determine
plan for improvements to meet next years plant
targets
10/04-12/10 Heraeus Electro-Nite Inc. Peru,
IN
1/10-12/10 Warehouse/Distribution Center Manager
Responsible for all incoming/outgoing shipments.
Reporting to the Director of Operations. Responsible
for manufacturing transition to other facilities.
Oversee production of product until production at other
facilities running. Direct reports consist of salary
and hourly employees. Direct reports consist of 30
employees. Well versed in SAP Software.
2/07-1/10 Manufacturing Engineer
Responsible for assisting Production and product
development, developing new lines and improving
existing lines. Reporting to the Plant Manager.
. Assist in scrap reduction.
. Assist with development of new products/product
improvements.
. Design of new production line that resulted in
$100,000 cost savings per year.
. Member of cost savings team to reduce costs.
. Responsible for plant inventory and adjustments.
. Continuous improvement with various production
lines
. New warehouse layout and product flow to promote
lean manufacturing
10/04-2/07 Production Supervisor
Responsible for managing 6 production departments.
Responsible for production on all 3 shifts for these
departments. Reporting to the Plant Manager. Direct
reports consisted of 25-30 hourly employees.
. Reduction of scrap by 10% per year.
. Increase labor efficiency.
. Greater than 98% on time delivery in my
departments.
. Part of start up team for SAP.
7/01-02/04 Essex Electric Inc. Columbia
City, IN
Warehouse
Performed general warehouse duties including loading
and unloading trucks, picking orders and creating ship-
supporting documentation.
1/97 -12/00 Group Dekko/Dekko Engineering Inc. Kendallville, IN
5/98 -12/00 Engineer/ Plant Manager
Responsible for managing a new plant startup and
engineering of the new product. Reporting to the Vice
President. Direct reports consist of production
supervisor as well as production personnel. Provided
technical assistance and customer assistance to most of
the top office furniture manufactures. Was in charge
of or part of every aspect of this product.
. Started manufacturing of a product including
creation of bills of material, raw material
suppliers, and production process.
. Created manufacturing process in BPCS.
. Work with Herman Miller and Steelcase on customer
prototype installations.
. Established a quality system for the product
following QS/ISO9000 guidelines
. Received 6 patents for the design of the product.
. Received 1 patent for changes in manufacturing
equipment to improve quality and ease of
manufacturing of the product.
. Prepared quotes and layout design for customers.
. Worked with marketing to create brochures and
marketing materials for the product.
. Created a website for the product.
. Forecast, ordered and responsible for inventory of
raw material.
. Set up lean manufacturing for this facility.
1/97 - 5/98 Electrical Engineer
Responsibilities included testing products,
failure analysis and design, reporting to the Vice
President of the laboratory facility
. Tested new parts and design changes to customer
specifications. These included environmental
simulation, thermal shock and life testing.
. Created tests to recreate and determine failure modes.
. Designed a new modular telecommunications product.
. Obtained UL certification for testing.
. Tested products to ASTM and Ford specifications among
others.
. Assisted in designing of a device that detected
microsecond failure in automobile taillights per
Ford specifications.
Military:
8/88 - 5/91 US Navy
Naval Nuclear Power Program
Honorably Discharged as E-4
Other Experience:
SAP, 5s, DFT, working Knowledge of Microsoft office,
Excel, Word, Power Point, Microsoft Outlook, BPCS, MRP I
and II, AS400
References available upon request