Post Job Free
Sign in

Project Engineer, Planner/Scheduler

Location:
Calgary, AB, Canada
Posted:
December 19, 2014

Contact this candidate

Resume:

SUMMARY

. Licensed professional Engineer in Alberta Canada.

. B.SC.Eng (Mechanical) of over Seventeen years of construction management

with outstanding HSE performance in piping/structural works, pipe lays,

module fabrications/Installations and facility

upgrades/refurbishments/Turnovers applying various standards/codes in Oil

and Gas industries with significant experience in Planning/Scheduling,

design and modeling using Revit, AutoCAD/Micro station, with advance

skill in MS office software suite. I am very conversant with Primavera

(P6)

. Experienced in problem solving, working under tight timelines - attention

to detail

. Excellent communication, strong interpersonal/organizational skills with

internal & external client groups

. Prepared and/or reviewed engineering reports, status reports and

technical memoranda

. Scheduled activities on WAC/PRM/Radiant/Annex/Jungle Gym modules/CPF

Fabrication/Installation.

. Extensive application of relevant International codes with Knowledge of

ABSA and ERCB regulations.

. Familiar with AWS D1.1, API 1104, API 5L, ASME Sec II, BS 499.2,DNV, ASME

B31.8, ASME B31.3, ASME B31.4, NACE/SSPC SP10 SA 2.5, ABS, ISO and CSA

standards

PROFESSIONAL EXPERIENCE

Bemac Construction Corp (Bantrel) @ Jacos Site in Fort Mcmurray

Aug 2014 to Date

Project Planner / Scheduler Jacos Hangingstone

Expansion Project

. Developed WBS, maintained/updated EPC P6 Master Schedule and captured

time impact change logs

. Prepared weekly 3 Week Look Ahead, monthly Schedule deliverables and Bi-

weekly progress report

Voice Construction @ Suncor Fort Hills Site in Fort Mcmurray

April 2014 to Aug. 2014

Project Scheduler Fort Hills E and T

Undergrounds Project

. Developed WBS, maintained/updated P6 Schedule, prepared Earn Value &

commodity curves

. Prepared and Updated Bi-weekly Project Progress Report using data from

Explorer (SAP program)

Phoenix Industrial @ Nexen Kinosis Fort Mcmurray Site

July 2013 to March 2014

Project Scheduler Steam Generation

Facility Project (SAGD)

. Developed WBS, maintained/updated P6 Schedule, prepared Earn Value &

commodity curves

. Leveled resources; reviewed critical path; logged schedule change notices

& forecast project impacts

. Interfaced with Work face planners, QS, Superintendents/Foremen for data

collection

Laricina Energy Limited @ Germain Site April

2013 to June 2013

Construction Management Team Scheduler Commercial Demonstration

Projects (SAGD)

. Coordinated weekly schedule review meetings with CMT & contractors

ensuring project alignment.

. Updated Construction and Turnover schedules weekly and further analyzed

the schedules to provide advanced notice of unfavorable trends and

bottlenecks reports and Variance Analysis.

Phoenix Industrial @ Nisku Mod Yard Oct

2012 to 2013

Project Scheduler Cenovous / EIT / Harvest Energy /Devon JF

Projects and Bids

. Developed and created bid schedules with appropriate level of detail &

manpower histogram required

. Scheduled activities for WAC/PRM/Radiant/Annex/Jungle Gym modules/OTSG

Fabrication/Installation

. During various project executions, monitored/updated the Schedule,

identified critical path activities, reported schedule variance/issue

status and further made recommendations on schedule recovery.

Horton CB&I (Canada) Fort McMurray June

2012 to 2012

Project Controls Specialist/Scheduler Suncor/Syncrude/

Projects

. Provided plans/inputs for development and updating of project schedule

using Primavera

. Managed schedule change notices and forecasted project impacts.

. Supported constructions activities and generated progress reports from JD

Edwards and CDMS

Willbros Construction Services (Canada) Fort McMurray

Mar 2011 to 2012

Project Controls LV II Tailings Relocation from West In-Pit

Project (TR-WIP)

Achievements:

. Assisted in Schedule variance analysis reporting; Generated Crystal

reports on 'Job Summary by Margin Type' from JD Edwards and other reports

from DTC (Digital Time Capture).

. Tracked and reported to client any field change orders that affects

project budget and schedule

. Monitored productivity relative to Cost, Materials and Man hours,

ensuring schedule alignment and also tracked and reported weekly progress

performance / forecast to client (Syncrude)

ExxonMobil Nov 2009 to

2011

Construction Supervisor ExxonMobil Field

Redevelopment/Upgrade Project

Achievements:

. Verified and ensured that all work is performed in accordance with the

approved drawings, specifications, standards, fabrication & Installation

procedures and contract documentation and in compliance with all Health &

Safety standards and regulations

. Promoted and maintained, at all times, safety awareness and safety

enforcement and performance with all concerned personnel on the execution

team

. Participated and provided coordination, guidance and direction in the

daily planning and scheduling of construction activities and assisted in

the coordination of work to minimize interferences with other activities

. Provided input into resolution of project construction issues, stewarding

process for implementation of resolutions and provided advice and

guidance to other personnel as required

. Reported to Divisional Manager while coordinating and delivering all

aspects of project engineering and major maintenance activities, taking

into consideration - engineering design, procurement, administration, and

project close out; with high standard of execution of these project

aspects with respect to safety, quality, schedule and cost

J. Ray McDermott Inc. Dubai U.A.E

June 2006 to 2009

Lead Field Engineer - Shell Pearl GTL Pipeline project (EPCI project)

RasGas Offshore Expansion Project Ph 2(EPCI project)

Qatar Gas II Pipeline and SPM project (EPCI project)

Achievements:

. Communicated with installation/project manager, determining site safety

needs, resolving non-compliance issues

. Actively participated in work place hazard identification processes

ensuring due recognition is given to contributors

. Checked module skid steels, Pipe racks, pipe supports and misc offshore

structures

. Managed and executed installation of various size pipelines (e.g. 38" x

96km, 30" x 56km etc.), Decks, Jackets, Dummy spool/WYE and beach pull

operations ensuring adequate supervision is deployed. This resulted to

Zero Loss Time Injury (LTI) during project execution

. Prepared Material Requisitions for various assigned projects (including

long-lead items) with aggressive follow-up/engagement with procurement

expediters resulting to early delivery

. Coordinated with materials group to identify/expedite missing

materials/equipment and further support vessel movements

. Established various rigging for installation of concrete sleepers,

mattresses and Damage Object Protection (DOP) considering water depths,

sling lengths and sizes

Horizon Constructors Ltd. 2003 to

2006

Project Engineer - West African Gas Pipeline Project (WAGP (EPCI

project)

Chevron Flow line Campaign project (EPCI project)

Achievements:

. Ensured that permits regulatory/statuary obligations and notifications

were in place before the start of construction; ensuring full compliance

during construction

. Monitored and inspected construction operations ensuring compliance with

design documents

. Prepared field installation manuals and site specific procedures for the

West African Gas Pipeline Project. Pipeline (20" x 540km) was laid along

the west African coast from Takoradi to Lagos(Nigeria)

. Signed-off work activities of subcontractors such as SMIT - divers, AUT-

RTD, Automatic Welding - Serimer Dasa and Field Joint Coating - PIH to

facilitate milestone progress / invoice authorization.

. Coordinated punch list items and ensured timely corrective actions during

the completion of the 20" Lagos beach Horizontal Directional Drilling

(HDD) string by NACAP on the WAGP project.

. Assisted with as-built drawings for the 26" emergency export pipeline

repair for Chevron Limited at Awody Escravos field. Project executed

without accidents

Willbros 1999 to 2003

Installation Engineer - ExxonMobil Riser Repair / Chevron Riser

Replacement Project

Shell Petroleum Dev. Coy.- Forcados Yokri Integrated

Project

Achievements:

. Supervised and monitored construction activities ensuring efficiency,

compliance with project quality, standards, specifications, safety and

security requirements

. Scheduled work activities and manpower requirements to meet established

completion dates

. Played an active role in the development of safety culture on the

project, making safety a natural part of all work performed

. Ensured that subordinates are trained and knowledgeable of specifications

and work procedures

Weco Engineering and Construction Company 1997 to

1999

Project Engineer - Chevron Construction Project / ExxonMobil

Wellhead Project

Achievements:

. Managed overall schedule to ensure work is assigned and completed on time

and within budget

. Assisted in the Installation and hook-up of various piping to Coalescers,

CHF Heater, Wemco Units, Reboiler, Separators etc. in Escravos Terminal

for Chevron Construction project.

. Ensured that punch list items are executed and also prepared pre-

commissioning packages for Escravos Terminal Expansion Project &

documented lesson learnt.

. Guidance provider to Fitters and Welders in the fabrication of Manifold

Structural Skid/piping, Water Skimmer skid, Centrifuge Hut, Open/Closed

Drain Tanks...

. Prepared MTO, WBS, Templates and Cut-Lists with ACAD to aid fabrications

and ensured that fabrication is done as per clients specs and company's

standards

. Investigated and resolved engineering technical related issues by

reviewing designs and raising RFI to clients and supporting same with

alternative design drawings for approval

. Interpreted drawings for Fitters & very familiar with AWS D1.1, API 1104,

API 5L, ASME Sec II, BS 499.2, DNV, ASME B31.8, ASME B31.3, ASME B31.4,

NACE/SSPC SP10 SA, ABS, ISO and CSA Std.

. Produced As-built red line markings that shows changes in original design

which was finally incorporated in the delivery package to client

. Assisted in the fabrication of two Sub-sea Ewan Tripods 15' and 20' Water

depth respectively. Fabrication of Wellhead Jackets for Etim 'D' and Ubit

'K' for ExxonMobil Wellhead Platform project. Fabrication & Installation

of North Apoi 'H' Header / Ligaments and also in the fabrication of

Penington Boatlanding for Texaco Overseas project

ABB Global Engineering. 1996 to

1997

CAD Operator / Mechanical Engineer

Worked in Engineering Drawing Office of Shell Petroleum Dev. Coy Port

Harcourt

Achievements:

. Prepared Piping and Instrument Diagram (P&ID), Structural drawings for

platform upgrades, and Isometric drawings for piping construction.

ILF Consulting Engineers. 1995 to

1996

CAD Operator / Mechanical Engineer

. Involved in Design Modification of XHP Separators for Shell at Awoba

EDUCATION

B. Sc. (Mechanical Engineering), University of Ibadan, Ibadan.

1995

Project Management Ext. Certificate, Mount Royal University Calgary Canada

2012 to June 2013

P. Eng by APEGA 2013

Skills & Professional Training

. CDMS Training organized by Syncrude

2012

. PMCS, iDocs, TAP & JD Edwards Training organized by HCBI

2012

. CSTS, OSSA & H2S Awareness, H2S Alive; AACE member

2013

. Confined Space Entry/Monitor Training by Advantage learning solutions

Inc. 2012

. Basic Fire fighting and Basic First Aid Training (by ETSDC Abu Dhabi)

2012

. Hard Dollar & Digital Time Capture (DTC) training (Edmonton)

2011



Contact this candidate