Rodrigo Huerta G mez, EE
Guadalajara, Jalisco, M xico, C.P. 44220
Cell: (0152-33) 3667 2797 E-mail: **************@*******.***
Electronic engineer highly skilled on manufacturing and engineering
processes in world class companies like Texas Instruments, San Mina SCI,
IBM and HITACHI.
Qualifications include master studies in productive processes optimization
(IE)
Quality System Regulations (ISO), design control SOPs and various
manufacturing processes including LEAN, and SSBB certification.
Expertise
Cleanroom Manufacturing & Engineering
CCTV installation and configuration (cameras and DVRs)
Access control administration, (ISONAS)
ISO, QS & IPC Standards
Product R&D/Prototyping
Verification & Validation Testing
Failure mode and Effect Analysis (FMEA)
Engineering experience
Perfect Choice, Guadalajara Mex. 2010 to present
Quality manager Jun 2010- to present
Manage evaluate and implement a Quality System based on ISO 9001: 2008.
Managing and planning policies, processes and quality strategies of the
company, in order to assure, provide and maintain the knowledge and
guidelines to integrate processes, people and technology through quality
management system in order to meet customer requirements, assuring the
follow up on defined processes and procedures. Monitoring and control of
corrective actions plans. Follow up on compliance with the BSC (Balance
Score Card) that allows the implementation of the strategies defined on the
Hoshin-Kanri/Gantt, and 4Dx.
Achievements
Guide and propose implementation a BSC methodology of in the organization.
Design and implement policies and strategies to optimize Quality in
customer satisfaction.
Responsible for the customer service area, using the DMAIC methodology to
achieve to implement control on technical issues, performing failure
analysis (FMEA) and managing improvement actions either in the products and
usage information to customers.
I automated the feedback forms of information to customers, achieving
increased productivity.
Facilities Manager Sept2012-Mar 2014
Monitoring and management implementation of corrective and preventive
maintenance of equipment and infrastructure installed.
Ensuring personal safety and property security.
Achievements
Sustain operational the installed equipment on facility. Guiding and
propose cost reduction actions on consumption (electricity and water).
Monitoring and management for optimal installation on both storage systems
(racks), as well as the electrical, hydraulic and pneumatic installation
during construction of the new campus (12,000 m2 / 129.000 SqF Warehouse)
achieving savings on material selection.
Selection and evaluation of suppliers using the TQRDCE methodology
(Technology, Quality, Responsiveness, Delivery, Cost, Environment)
Engineering Manager (NP evaluation) Jun2010-Sep 2012
Assure and evaluate product performance from the proposed products catalog.
Close contact to factories to improve product samples to integrate to
catalog.
Achievements
I implemented new product testing methodologies to ensure proper operation
and identify opportunity areas to improve performance, give feedback to
factory to meet the required acceptance level. According to the standards
IPC (Association Connecting Electronics Industries)
Divertimatico, Guadalajara, 2003 to present
Owner
Manage points of sale with video game machines and jukeboxes,
Analyze the performance of each machine and evaluate its relocation to
increase profitability.
Achievements
I developed cost / benefit analysis, profit margin with a margin of error
of 5% in the ROI.
I assembled and program 50 machines to operate 18 points of sale.
I opened a working route in the southern state of Jalisco to the operation
of such machines achieving in some cases displace competition, by providing
better service.
Test In-situ to repair the vending machines in route reducing broken
machines for failures due operation, (reducing down time)
HITACHI de M xico El Salto Jalisco, 2003-2008 (FAB process)
Engineering Team Engineering Team leader Dec 2006-Jan 2008
I coordinated a group of 10 engineers to accomplish and monitoring yield
improvement and follow 8D projects.
I provided coaching on statistical tools for data analysis used in yield
improvements projects, increasing yield by 5%.
Coordinate and I administered the FMEA process to identify the root causes
of problems and their solution.
I provided coaching on Db2 (QMF) queries programming for a daily monitoring
of both output per employee per workstation, as well as by type of batch
and type of defect generated etc.
I did program queries for monitoring the daily trend of the different
product contamination defects, (Db2 using QMF)
I prepared weekly status reports for senior management process.
I generated information with actions items to improve responses to customer
complains
I did use DOE on critical variables to detect and improve the processes
Achievements
Increased productivity by 7% by monitoring automatically (through queries)
production throughput per workstation as well as the 40% decrease in the
rate of defective (dppm) by operator by taking immediate action in their
solution.
Implemented a predictive monitoring system on backend workstations with
high defective index, making an early defect detection and segregating the
material on time.
Contamination process engineer Jun 2004-Dic 2006
I made programs (Queries in DB2, QMF) to monitoring the daily trend of
defects by product contamination.
Coordinate a group of 4 technicians for the collection of qualitative and
quantitative laboratory analysis of material samples.
Generate reports 8D and coordinate working groups of the 3 areas to
identify defect generating sources.
Achievements
Use of tools such as DOE statistics, hypothesis testing, Pareto charts and
control limits etc. To detect and take action to reduce defects due to
contamination from 7% to 3%.
Perform queries to identify non-conforming material batches and
automatically segregated in each workstation thus preventing its shipment
to the customer.
Process engineer (Slider FAB) Mar 2003-Jun 2004
Propose, manage and control activities of the cutting process, such as
continuous monitoring of variables through control charts.
Coordinate a group of four engineers in the monitoring and implementation
of continuous improvement actions and preventative maintenance.
I made a new cutting program that improved cutting quality and decreased
cycle time by 20%, supported by a design of experiments,
I made a measurement systems analysis (MSA) including GR & R, ANOVA,
keeping equipment reliability measurement
I programmed in Db2 (QMF) queries in order to monitor the productivity per
workstation and take action in not conforming situations with procedures
Achievements
I generate a measurement program based on statistical inference achieving
100% accuracy decreasing the measurement cycle time by 75%
I helped start the qualification cutting process of the Shenzhen China
facility achieved the 20% optimization in cutting cycle time thus increase
thruput capacity.
IBM de M xico El Salto Jalisco, 1998-2003
Process engineer (Slider FAB and Wheelroom) Dec 1998-Mar 2003
With the use of DOE, I developed a new technique for the preparation of
cutting blades, this increased on 3x the blade lifespan.
With the help of statistics tools (DOE, control charts, etc.)
the process was optimized to decreasing the downtime on changing equipment
blades from 120 to 45 minutes. (62%)
Implemented control charts in both areas to monitor changes in critical
variables and take action against non-compliant situations.
Use and practice the 5S culture in blade preparation area to maintain order
in the process.
Set queries (QMF) to monitor each blade used, and evaluate their
performance.
Achievements
Optimize the process, by slowing down time on changing equipment knives 120-
45 minutes, increasing the blade performance in 4x and therefore
With the new technique of preparation, I saved an average of 250 k USD to
the company annual blades consumption.
.
Texas Instruments Aguascalientes, AGS. 1996 to 1998
Process/Mfg. engineer
Using SPC tools to control three production processes (Thermo protectors
for electric motors).
Coordinate and lead three engineers to manage responsibilities on
preventive and predictive maintenance of manufacturing tooling, as well as
in the implementation of TPM.
Generate weekly processes status reports to present to upper management.
Ensure quality of incoming raw material performing sample analysis.
Collaborate on the development and qualification of local suppliers of
stamping and injection molding
Generate 8D reports on nonconforming material
Achievements
I worked in the qualification, certification and production transfer line
of a thermal protector device from the R&D facility in Attleboro Ma, to
production facility in Aguascalientes Mx.
Design the continuity tester for devices "heaters" used in Copeland
compressors, thus ensuring increased productivity in that production line
and reducing cycle time 3x.
Participate in the design of one-piece terminal used on starter motor
Klixon 8EA used in Copeland compressors.
Education
Master Optimization on productive processes (IE)
Universidad Panamericana 2002
Electronic engineering (EE)
Universidad de Guadalajara 1994
Skills
ISO 900:2008, BSC, 4Dx, 6S Black Belt, Making team decision, 8-D training,
DOE, FMEA (Failure Mode & Effect Analysis), Pneumatic s, Ethics, OEE
(Overall Equipment Efficiency), Industrial safety and security, effective
supervising, Incident investigation, Manufacturing methods, Chemical
handling, Finances for NO financial people, QS Auditor, Systematic Methods
to solve problems, 7 QC tools, TPM Basis, LASER safety, PLC programming
(Ladder), 5's Methodology, Personal growth and management action.