CORE COMPETENCIES:
. Project Management . Requirements Analysis .
Subcontractor Contract Negotiation
. Installation Supervision . Conveyor/Material Handling .
Vendor Bid Analysis and Selection
. MS Project Scheduling . RFI / RFQ Development . Risk
& Issue Resolution
PROFESSIONAL PROFILE:
Senior Project Manager and Mechanical Engineer - Capital Projects
. Complete oversight of turn-key plant material handling capital
projects including equipment layout and installation supervision.
. Experience in planning and directing capital projects from concept
to performance acceptance.
. Extensive hands-on experience in project management, design layout,
engineering, generation of equipment specifications, Operation &
Maintenance procedures, purchasing, budgeting, cost estimating,
hiring, contract and vendor management, relocation & installation
of capital equipment plus commissioning of capital equipment.
. Capable of tracking all schedule milestones through the Life Cycle
of material handling & process systems.
. Strong equipment trouble shooting skills and understanding of
manufacturing and process equipment.
. On-the-floor, hands-on type Project Engineer / Manager who has
planned and designed material handling systems, manufacturing
production processes and process improvements in industrial plants.
. Conducted Root Cause Analysis on various systems to resolve
problems and improve quality. Ability to provide solid analytical
problem solving skills, and to provide leadership in equipment and
process flow layouts.
. Capable of maximizing lean efficiency by analyzing waste, layout of
equipment, workflow, assembly methods, and work force utilization.
. Determined, selected, purchased and justified project costs for
process equipment in order to achieve manufacturing goals according
to product specification.
. Ensured the engineering team and other manufacturing departments
worked together cohesively.
. Relied on experience and judgment to plan and accomplish goals.
. Effective communicator who achieves high levels of Stake Holder
satisfaction by managing contract scope of work requirements that
ensure alignment with project financials, schedule, goals and
objectives.
. Strong fundamentals and professional experience implementing PMI's
PMBOK (Project Management Body of Knowledge), Equipment
Commissioning, and Engineering best practices across multiple
industries.
EXPERIENCE:
EMIT, INC. located in Nashville, TN - Primary Projects are FedEx
Distribution Centers.
Senior Project Manager February 2014 - June
2014 (5 months)
EMIT, Inc. is an Electro Mechanical Conveyor System Integrator in
Nashville, TN
My main responsibility was to manage all aspects of FedEx New Conveyor
System Integration Projects. My overall job accomplishments were as
follows:
. Developed the Company's Project Management Plan to be utilized on all
Projects.
. Maintained positive customer relationships by ensuring detailed and
consistent project management tasks were completed professionally and
timely.
. Provided detailed project reporting and schedule updates that were
communicated via email on a weekly basis (and cc'd to CEO and CFO)
. Ran the High-Level Status Update Meetings every Monday and Thursday
morning at 9:00am CST in the absence of the Operations Manager.
. Scheduled and initiated Periodic Project Meetings for ALL active FedEx
projects
. Scheduled and initiated Project Milestone Meetings as defined by the
project
. Created templates for action item punch-lists, pre-install and install
checklists, sign-off sheets, and other required documents for project
execution from start to finish.
. Ensured project milestones invoicing was scheduled in a prompt and timely
manner for ALL FedEx projects
. Monitored changes to the scope of the work and negotiated the
reconciliation of those changes and issued Change Orders for approval.
. Maintained positive employee morale by holding weekly project review
meetings
. Monitored work productivity of the engineers and support staff.
. Monitored the purchasing and receipt of the project materials
. Maintained a working MS Project Schedule for each of the company's FedEx
projects.
. Supported the sales department.
Managed the following projects in accordance with FedEx Ground
Specifications, and prepared all documentation and requirements per
Section 01782 - Documentation Standards, Deliverables, Training & Startup
Assistance methods and requirements. Project Managed Conveyor Integrated
System installation projects concurrently for the following FedEx Ground
(FXG) customers:
.
V Cookeville, Tennessee
V Beckley, West Virginia
V Marion, Indiana
V Sheridan, Wyoming
V Bowling Green, Kentucky
V Dayton, Ohio
.
Contract: AEROTEK, INC to ELECTROLUX CONSUMER HOME PRODUCTS Manufacturing
Plant located in Springfield, TN.
Senior Manufacturing Project Engineer (July 9, 2013
- January 1, 2014)
My most recent project oversight was for a new automated stamping press &
conveyor line for Electrolux Cook Tops. Project was very challenging and
demanding of my time. I was responsible for recording all process equipment
downtime issues, minute by minute, and develop the solution to resolve the
issues to eliminate them from reoccurring (Root Cause Analysis). This
required me to be at the presses at all times, which equates to 12 to 14
hours a day, 7 days a week most of the time. Through my efforts the
System's Downtime was reduced significantly.
Accomplishments:
. Developed a detailed Downtime Data Recording Process and all required
recording templates.
. Trained three shifts of System Operators on the Downtime Data
Recording Process and Methodology.
. Created and initiated a Production Cycle Time Improvement Program,
including Daily and Monthly recording Excel templates.
. Instituted the Scott Cook Top Line Manufacturing Metric (OEE) Overall
Equipment Effectiveness data recording process and required Excel
Template.
. Created a Quality Improvement & Scrap Reduction Program and Scrap
Tracking Process with Excel templates for all production shifts.
FLOSTOR ENGINEERING, INC. located in Brentwood, TN - Distribution and
Warehouse, Automotive & Process Conveyor Equipment Integrator into Process
Systems.
Senior Project Manager (July 2, 2012 -
February 1, 2013)
. Responsible for all aspects of a project's life cycle, from Sales
turnover meeting through final acceptance.
. Purchased and expedited materials for each project.
. Obtained all necessary permits, supervised field work crews, dealt
with aspects of the Uniform Building Code, and worked closely with
all departments within the organization to coordinate a smooth
running, on time project.
. Negotiated reductions in vendor labor costs.
. Produced and maintained MS Project Schedules and field reports
using templates that I custom designed.
. Reviewed, verified, tracked, and expedited customer and vendor
invoice payment requests.
. Established and presented kick off, progress, scheduling and site
safety meetings.
. Interfaced with facility user staff to address their needs and
concerns during system design, installation and customer acceptance
testing.
. Selected and supervised site installation vendors.
Site Project Managed Conveyor & Process Integrated System installation
projects concurrently for the following customers:
.
. FedEx Ground - Hub # 288, Charlotte, NC - Distribution System:
Supported the delivery of solutions including existing
distribution center smalls conveyor redesign and retrofit
project and new FXG conveyor and controls.
Managed the project in accordance with FedEx Ground
Specifications, and prepared all documentation and requirements
per Section 01782 - Documentation Standards, Deliverables,
Training & Startup Assistance methods and requirements.
.
. OnTrac - Salt Lake City, UT - Distribution Material Handling
System:
Supported the delivery of solutions for a new distribution
center project. Managed all aspects of the project including
permitting, purchasing, scheduling, installation and acceptance
testing. Directed and tracked all milestone invoicing. Hired all
installation team members and created the master project
schedule in MS Project.
.
. Driscoll - Tampa, FL - QA Inspection Custom Process Conveyor
System:
Managed all aspects of the project including permitting,
purchasing, scheduling, vendor selection and installation and
acceptance testing.
Accomplishments:
. Maintained forecasted project budgets and project schedule milestones.
. Generated concise and accurate integrated account-level project status
reporting (including a 3 week look ahead) utilizing MS Project
Professional scheduling software which resulted in on time milestone
completion.
. Manage project financial P&L including accurately forecasting costs,
operating within established budgets and attaining margin improvement
objectives up to 30% GP.
RPM . ROBINSON PROJECT MANAGEMENT - Brentwood, TN 1991 - 2011
Position: Self Employed Project Management and Engineering Consultant
PROJECT EXAMPLES (not all inclusive):
Contract: KELLY SERVICES to Nissan Automotive Assembly Plant in Smyrna, TN
Project Type: Manufacturing Material Handling System Design and
Implementation
Project Length: 1.0 year (2011-2012)
Job Function: Mechanical Project Engineer
. Responsible for the conception and engineering of plant wide process
material handling systems. This included needs analysis, cost / ROI
justification to upper management, Layout design and engineering,
planning & monitoring of project budgets and resources, project cost
estimating, bid package preparation, project management, systems
testing and start-up, including Test Plan development.
. Coordinated the utility power and equipment mechanical & control PLC
specifications required for each project.
. Responsible for engineering support for manufacturing and maintenance
troubleshooting.
. Monitored and managed installations on a daily basis to ensure
milestone schedules were kept on track. Created Master MS Project
Schedules.
. Selected contractors and administered all contractor contracts during
system design, fabrication, installation and system launch.
Accomplishments:
. Successfully managed 6 projects concurrently. This involved
supervision of plant maintenance team members assisting with the
system installation & testing, and 4 different contractor mechanical,
programming and electrical installation crews.
. Redesigned and improved production performance on existing system
conveyor equipment.
. All projects were successfully completed on time and within budget.
Contract: AEROTEK, INC to Mercedes-Benz Manufacturing Plant in Vance, AL
Project Type: Project Management, Scheduling, and Project Tracking.
Project Length: 6 months (2010-2011)
Job Function: Project Coordination Engineer / Project Manager
. Ensured the on time implementation of plant readiness for the new
BR166 Vehicle Program and alignment of all shops (Press, Body, and
Paint & Assembly) for transition to full Series production at Mercedes-
Benz USA. Controlled overall project implementation timeline for
implementation of Project.
1. Establish OEM vendor status updates reporting process.
2. Do a 3 week look-a-head.
3. Merge all schedules into a Master Schedule
Assisted the BIW Body shop team in bringing the Weld Cell
vendor, Comau/Pico, back on the original installation
schedule. Coordinated floor space between contractors & MBUSI operations.
4. Lay-down areas.
5. Logistics BIW vehicle parts storage.
6. Pull ahead work (advanced install).
Assigned outside lay-down areas and equipment staging areas.
Audited contractor timeliness & critical path.
7. Attended shop inspection visits during design/fabrication
phases.
8. Performed site walk-throughs during installation for visual %
complete.
. Developed / delivered progress reports upon request (problem
tracking).
. Created and monitored Master Open Issues List.
. Established recurring meetings (Conducted daily face to face
meetings during installation phase).
. Submitted MS Project schedule % complete reports and Mercedes-Benz
specialized European scheduling program named RPlan.
. Pro-activity assessed project changes and identified potential
risks/ impacts.
Accomplishments:
. Successfully negotiated storage space for Logistics BIW parts storage.
. Established the Construction Turn Over Implementation Plan.
. Developed a Plant wide Master Issues List and tracking / update
process.
Contract: Faithful & Gould to Rolls-Royce - Jet Engine Manufacturing & Test
Plant in Petersburg, VA
Project Type: Project Management, Scheduling, and Project Tracking.
Project Length: 10 months (2008 - 2009)
Job Function: Site Senior Construction Project Manager - MEP
. (Green Field Construction Site) Promoted the client's interests and
assisted them in maintaining their budget, schedule, design and
quality standards by applying sound project management techniques
for the planning and execution of my assigned MEP tasks.
. Attended and participated in open issues, progress, scheduling,
design, state & county government coordination and other meetings
related to the Project and project activities.
. Designed and Produced the Monthly Project Status Report and Open
Issues Lists. Attended and participated in the Building Design
Charette held in Derby, UK. Analyzed, calculated and coordinated
building and plant process utility requirements (mechanical,
electrical, water, gas, etc.) with the local Utility Companies.
Maintained other pertinent project documentation in an efficient
manner.
Accomplishments:
. Assisted in the RFI and RFP Design and Build contractor selection
process through the design, creation and application of Excel Spread
Sheets used for comparative analysis.
. Assisted in the conversion of UK construction standards and building
codes manual (Rolls-Royce Blue Book) to US and International standards
and codes to be used for this and future construction projects.
Contract: TAG to Berry Plastics, Inc. - Manufacturing and Process Plant in
Homer, Louisiana
Project Type: Resolution of Process Quality Issues
Project Length: 6 months (2007-2008)
Job Function: Senior Project Engineer
. Lead project improvement team.
. Applied Root Cause Analysis techniques to analyze and resolve 12
identified production problems.
. Implemented vision inspection technology to verify quality and
accuracy of manufactured product.
. Promoted lean manufacturing concepts within the Engineering
department.
. Created and maintained Task Implementation Status Reports and
Master Project Schedule for presentation to Plant Manager and Team.
Created Site equipment Installation Plans.
Accomplishments:
. Saved the customer over $500,000 annually in reduced product waste by
resolving process issues that were negatively affecting the quality of
the products being manufactured.
. Coordinated and mentored 15 Team members.
. Negotiated $26,000 reduction in equipment cost.
. All projects were successfully completed on time and within budget.
Contract: FloStor to Trane Air Conditioner Mfg. Plants in Clarksville, TN &
Fort Smith, AR
Project Type: Manufacturing Material Handling Systems Layout Design and
Implementation
Project Length: 3.5 years (2004-2007)
Job Function: Senior Project Manager / Project Engineer
. Created plant process flow and material handling system equipment
layouts.
. Managed subcontractor contracts on all projects. Authored RFI's, RFP's
and PCO's (Project Change Orders).
. Reviewed, verified, tracked, and expedited customer and vendor
invoice payment requests.
. Established and presented kick off, progress, scheduling and site
safety meetings. Identified, tracked and mitigated punch list issues.
Interfaced with facility user staff to address their needs and
concerns during system design, installation and customer acceptance
testing. Produced and maintained field reports. Acted as SME in pre-
sales meetings with sales representatives.
Accomplishments:
. Supervised site installation contractors with crew sizes of up to 28
per project.
. Developed and instituted a "Project Change Order" Approval &
Documentation Program.
. Achieved customer confidence and satisfaction which resulted in
increased sales of $264,000.
. Negotiated over $137,000 reduction in contractor installation costs
through improved recommended methods.
. All projects were successfully completed on time and within budget.
Contract: ResourceTek to Nissan Automotive Assembly Plant in Smyrna, TN
Project Type: Manufacturing System Design and Implementation
Project Length: 3.0 years (2001-2004)
Job Function: Mechanical Project Engineer
. Created the Tire & Wheel handling and Storage System Layout
utilizing AutoCAD.
. Prepared cost estimates, scope of work (SOW), specification &
Request for Quote (RFQ).
. Obtained Maintenance Department cooperation and backing for project
activities, including installation assistance.
. Developed and updated all departmental master project schedules, and
CPM charts using MS Project Professional.
. Oversight of operational equipment controls applications including all
PLC logic and control system integration testing and acceptance.
Administered all contractor contracts during system design,
fabrication, installation and system launch. Developed the Standard
Specification Bid Package for the entire Engineering Department.
Accomplishments:
. Successfully supervised 3 maintenance team members assisting with the
system installation & testing, and 8 contractor mechanical and
electrical employees.
. Negotiated over $158,000 reduction in vendor equipment and
installation labor costs.
. Redesigned plant equipment layout which reduced project cost by
$253,000.
. All projects were successfully completed on time and within budget.
Contract: ResourceTek to BWSC at Nissan Automotive Assembly Plant in
Canton, MS
Project Type: Field Engineering & Process Piping Installation Inspection
Approval
Project Length: 6 months (2001-2001)
Job Function: Field Process Piping Project Engineer
. Managed the Process Piping portion of the Construction of the Nissan
Plant in Canton, MS for Barge, Waggoner, Sumner and Cannon, Inc.
Performed Nissan / Subcontractor coordination and Installation
Management of all plant secondary process piping (air, oil, water and
gas) and Tool Rail utilities.
. Created and maintained all project field documentation including
engineering & field change orders.
. Maintained project cost controls and tracking as directed by BWSC.
. Supervised various construction subcontractors and conducted
construction coordination meetings.
. Responsible for implementing QA/QC procedures.
. Helped developed system test & debug plans and performed system
commissioning.
Accomplishments:
. Projects were successfully completed on time and within budget.
. No lost time recordable incidents, or near misses.
Contract: SRI to GM Power-Train Manufacturing Plant in Warren, Michigan
Project Type: Manufacturing Process Improvement
Project Length: 9 months (2000-2001)
Job Function: Regional Senior Facilities / Manufacturing Engineer
. Engineered stamping press layouts and scrap take away conveyor
system.
. Planned and designed manufacturing production processes and plant
process improvements.
. Maximized lean efficiency by analyzing layout of equipment, workflow,
assembly methods, and work force utilization.
. Conducted Root Cause Analysis on various components to improve
preventative maintenance.
. Determined, selected, purchased and justified project costs for
process equipment in order to achieve manufacturing goals according to
product specification.
. Chaired Plant (IRI) Industrial Risk Insurers Response Team for
resolution of issues previously generated from corporate plant safety
inspection initiative recommended by IRI. All issues were resolved.
. Obtained best IRI Warren Plant Safety Survey Report ever recorded.
Managed Fire Protection System piping and controls installations in
accordance with NFPA guidelines.
. Conducted performance testing and secured Fire Marshall's acceptance.
. Prepared Appropriations request and performed cost estimating.
. Managed Security camera (CCTV) and card access systems upgrade
projects.
Accomplishments:
. Supervised 6 maintenance team members, and 3 team engineers.
. Completed more major projects during my 9-month tenure than in
predecessor's 2 years.
. Honored with "Facilities Maintenance Department Achievement Award".
. All projects were successfully completed on time and within budget.
Contract: SRI to GM Manufacturing & Assembly Plant in Doraville, Georgia
Project Type: Resolution of Production Throughput Issues
Project Length: 1.5 years (1999-2000)
Job Function: Plant Resident Engineer
. Analyzed and resolved "Plant Open Issues" concerning production
utilizing Root Cause Analysis techniques and engineering best
practices.
. Conceived, designed, prototyped, tested and managed the installation
of an IP&F carrier positioning fixture.
. Conceived, designed, prototyped, tested and managed the installation
of a safety anti-backup & alarm actuation device for the production
assembly line which eliminated personnel safety concerns.
. Coordinated the Bid Package development.
. Created MS Project Schedule for each assigned project.
Accomplishments:
. Eliminated potential daily damage to vehicles of $80,000 per shift.
. Utilized available on-site components which saved the project $23,000.
. All projects were successfully completed on time and within budget.
Contract: Litton to Ford Kentucky Truck in Louisville Kentucky
Project Type: Multiple system equipment installation projects
Project Length: 1.5 years (1997-1999)
Function: Site Manager Construction & Equipment Installation
. Assigned to establish and manage a Construction & Equipment
Installation Site Management Office comprised of Design Drafters,
Mechanical Engineers, Electrical Controls Engineers, Project Managers,
Millwrights, Ironworkers and Carpenters.
. Managed multiple material handling system installation projects with
conveyor, AGV & ASRS interface, storage racking and fire protection
rack sprinkler system.
. Managed installations ranging in size from $100,000 to $200,000,000.
. Selected and hired local fabricators and union construction tradesmen
for economical completion of outstanding mechanical construction and
electrical issues.
. Supervised system startup test & debug and launch teams.
. Assured that all punch list items were completed in a timely and cost
effective manner.
Accomplishments:
. Oversight Management of mechanical, electrical, controls, piping and
painting subcontractors and their contracts, invoice approval, and
safety program compliance. Contractor manpower totaled approximately
500 skilled craft personnel.
. Saved $784,000 in project losses by establishing Project Document
Control and Change Control Programs.
. Maintained forecasted project budgets and project schedule milestones.
Contract Direct: CONVEYORIZATION, INC. - Louisville, KY
Position: Engineering Department Manager (1.5 years: 1990-
1991)
. Directed conveyor engineering projects through all development phases
from concept to manufacturing to installation and customer acceptance.
. Ensured product designs conformed to required specifications and met
established design and performance standards for the organization.
. Developed deliverables checklist to insure customers' expected scope
of work was achieved.
. Directed and managed efforts of Mechanical Applications, Sales and
Engineering departments.
. Approved all Requests for Quotation and price estimating. Oversight of
proposal, scope of work and specification preparation.
Accomplishments:
. Provided strategic leadership for engineering, hardware, and process
technology. Ensured that all product designs conformed to required
specifications and meet my established design and performance
standards for the organization.
. Established the overall objectives and initiatives for the engineering
and applications department.
. Worked closely with the Marketing team throughout the process to
insure that the customers expected scope of work was achieved.
EDUCATION - CERTIFICATIONS:
Degree - Mechanical Engineering
(CET) Have been certified as an Engineering Technician by NICET
COMPUTER PROFICIENCY:
AutoCAD 2010
Microsoft Project Professional - Scheduling
Microsoft Word
Microsoft Excel
Microsoft PowerPoint
PROFESSIONAL DEVELOPMENT TRAINING:
Certificate - AutoCAD Training by Autodesk
Certificate - MS Project 2007 Basic Level
Certificate - MS Project 2007 Advanced Level
Certificate - Project+ by CompTIA
Certificate - SharePoint 3.0 Level 1
PMBOK study for PMP certification exam
Lean Manufacturing (GM Basic Training Course)
Root Cause Analysis (Ford Basic Training Course)
Six Sigma Basics (GM Basic Training Course)
Job Site Specific Safety training classes
Various 29 CFR and OSHA training classes
PROFESSIONAL AFFILIATIONS:
(PMI) Project Management Institute member - Nashville, TN Chapter
(ASME) American Society of Mechanical Engineers - Board of Directors,
Nashville Section
(NYAS) New York Academy of Sciences - former member
(TSCAR) Tennessee State Children of American Revolution - Society Senior
Vice President
(NSCAR) National Society Children of American Revolution - Mid-Southern
Regional Treasurer