James F. DeLucci
Clermont, FL 34714
Cell (352) 454- 2735
Twenty plus years of experience in Nuclear, Fossil, Conventional Power
Plant, Bio-Technical, Semiconductor, Petrochemical, Commercial and
Residential Construction. Positions Held - Senior Field Engineer, Planner,
Project Superintendent, Mechanical Superintendent, QA/QC Manager and QC
Inspector VT 1, 2 and 3 and Welding Instructor.
EDUCATION
Ricker University, Houlton, ME
B.S. Business Administration 1968-1972
Portsmouth Technical College, Portsmouth, NH
Certificate in Welding Techniques
EXPERIENCE
Self Employed - Welding Instructor (April 1, to Present)
Washington Group International Inc., Diablo Canyon Nuclear Power Plant,
(Outage) Senior Field Engineer for Steam Generator Team (Dec 4, 2007 to
March 2009)
Washington Group International Inc., Port St. Lucie Nuclear Power Plant,
(Outage) Mechanical Field Engineer for Steam Generator Team (Aug 3, 2007
to Nov 30)
GE/Sonic System International Inc., Port St Lucie Nuclear Power Plant
(Outage) GE Sump Strainer Project, QA/QC Representative (Mar 19, 2007 to
may 12, 2007)
GE/Sonic System International Inc., La Salle Nuclear Power Plant. (Outage)
Snubber Inspection Group, QA/QC. (Feb. 21 to Mar 11, 2007)
Jordan Development & Construction, L.L.C., Project Superintendent for
Wastewater System Expansion Project, Owner Representative (July 3, 2006 to
Feb. 15, 2007)
Total Facility Solutions Inc. - Infineon Semiconductor Plant, Sandston VA -
Tool Hookup, Quality Assurance Representative. (Feb.11, 2005 to Feb 20,
2006).
DPR Construction Inc. - Bank of America, Project Superintendent. (Sept. 10,
2004 to Dec. 2004)
Limbach Facility (Enron Corp.) - AES Gas Power Plant, Londonderry, NH -
Project Superintendent, responsibilities included 100 plus Craft, two
General Forman and four Foremen. Complete the fabrication installation of
critical & non-critical piping and hangers for plant completion. MEP
Superintendent. (March 3, 2004 to Sept. 1, 2004).
QAM Inc. - Intel Semiconductor, Hudson Mass. (Base Build & Tool Hook-up)
Quality Assurance Representative (Sept. to Feb. 2004)
DPR Construction Inc. - Micron Project-Lehi Semiconductor (Base Build &
Tool Hook-up) MEP Superintendent (March 2003 to July 2003)
FST Consulting International Inc. - Intel Semiconductor, Hudson Mass.
(Demobilizing & Re-Tooling Fab 17) QA/QC Representative (1992 to 1993)
Engineering Consulting Services LTD. - White Oak Semiconductor (Tool Hook-
up) Project Coordinator on loan to White Oak
Semiconductor Facilities Group (Dec.1990 to 1991)
Engineering Consulting Services LTD. - White Oak Semiconductor (New
Construction) QA/QC Manager on loan to DPR Construction Inc. (June 1990 to
Nov. 1990)
Zurn Energy Division - Boiler Outage, QA/QC Mechanical Supervisor for all
new installation and components for the reconstruction of boiler. (1990 to
April 1990)
Kamyr Enterprises Inc. - Paper Recycling Plant, (New Construction) QA/QC
Mechanical Supervisor (May 1989 to Dec.20 1989)
NASA - Supervisor for the welding and repair of satellite support stand
(Feb.1989 to March 1989)
XL Technical Corp. - Co-Generation Plant, (New Construction) QA/QC
Mechanical Supervisor (July 1988 to 1989)
Dick Enterprises Inc. - Boiler Outage, QA/QC Lead Mechanical Inspector
Level II VT and PT (Feb. 1988 to May 1988)
Cotter Diametric Inc. - Genetics Institute (New Bio-Tech Lab) QA/QC Lead
Mechanical Field Supervisor Level II VT, PT and RT Interpretation, Welder
Certification fiber optics inspection (1987 to Jan. 1988)
Pullman Power - Seabrook Nuclear Power Station (New Construction) QA/QC MEP
Lead Field Supervisor (1984 to 1986)
Johnson Controls - Seabrook Nuclear Power Station (New Construction) QC
Inspection Level II VT and PT. (Feb.1980 to 1984)
Mercury Company-Waterford Nuclear Power Plant (New Construction) QC
Inspection Level II VT and PT. (March 1979 to 1980)
CE/Combustion Engineering-Manufacturing Plant for Nuclear Components,
Welding Department (1973 to 1979)
JFD/PAGE 2
MEP SUPERINTENDENT
. Responsible for all contract documentation and scope of work for the
project.
. Responsible for scope of work for each subcontractor.
. Monitor contractor quality of workmanship and ensured compliance with
contract documentation.
. Managed and coordinated with subcontractors to eliminate field conflicts
and ensured proper sequence of construction activities.
. Expedite self-performed and subcontractors work to ensure timely
performance to meet project schedule.
. Assist Scheduler to prepare, monitor and update master schedule.
. Review requests for quotations from MEP subcontractor and review reply
for fairness and accuracy.
. Alerts MEP Coordinator/Project Manager/Construction Manager of any out of
scope work activity.
. Assists MEP Coordinator/Project Manger/Construction Manger in forecasting
projections of construction activity for both cost and schedule.
. Monitors subcontractor performance to ensure adherence to contract
documentation.
. Provides input into constructability and value engineering reviews.
. Provides three-week rolling schedules and ensures subcontractor progress
meets schedules.
. Maintains project daily construction reports.
. Maintains task execution plans.
. Assisted in the development and monitoring of project schedules and
alerts MEP Coordinator/Project Manager/Construction Manager of barriers
that impact schedule.
. Manage maintenance of tool equipment and material inventory
QUALITY MANAGER
. Develop and implement project quality procedures.
. Monitor or delegate to others all construction activities including
inspection of major equipment received, for compliance with
specifications, procedures and drawings.
. Maintain documentation of all reports and discrepancies required in the
quality control procedures.
. Inspection of materials and equipment.
. Monitor receipt of major equipment to ensure it complies with
specifications and ensure it is stored properly until it is installed.
. Coordinate and direct all outside testing services.
. Administer all welders testing, assign identification program and
maintain welding logs of subcontractors.
COMMERCIAL/RESIDENTIAL SUPERINTENDENT
. Coordinate the workflow and activities of multiple contractors in high-
production environment.
. Communicate with client throughout the construction process.
. Accurately implement exception reports and production schedule,
generating daily, weekly and monthly production reports.
. Conducted initial walk-through and final inspection on a timely basis.
. Inspect and maintain standing inventory units.
. Accompany building inspectors on compliance inspections.
. Responsible for verifying installation of underground gas and electric
services, as well as coordination of final grade for flood control
inspection.
QUALITY ASSURANCE REPRESENTATIVE
. Responsible for welding inspection, daily activity log including walk
downs and pressure test reports.
. Monitor the fabrication, installation of base build and tool hook-up.
. Responsible for analytical testing of high purity systems.
SENIOR FIELD ENGINEER
. Develop / implement / close work packages for Steam Generator
Replacement.
. Coordinate with craft, QC, design and client (FPL) to resolve field
related problems.
. Perform walk-downs for work package oversight.
. Material take off and material requisition.
. Coordinate with Vendor for drawings and technical representation.