Post Job Free
Sign in

Project Manager High School

Location:
Yucaipa, CA
Salary:
59,000
Posted:
December 15, 2014

Contact this candidate

Resume:

RESUME'

Albert V. Alvarado

**** *** ******

Calimesa CA. 92320

Home Phone: 909-***-****

**********@***.***

Industry Focus: Glass and Glazing Looking For: Permanent Full

time,

Project Manager

Part time, 1099

Assistant Project Manager

Project Coordinator

Coordinator

Fabrication project manager

Aluminum Extrusions

Auto Cad Drafting

Experience: 25-30 years Relocation: no

Visa Status: U.S. Citizen

Travel: 60%

Skills:

Quality control and documentation (intermediate) 10 years.

Preparation of shop drawings, fabrication drawings, cut sheets, die

drawings (advance) 20 years.

Material take offs, material optimization, bill of materials, RFI's,

change orders (advance) 25 years

Computer programs-Auto Cad, 2004, 05, 06, 07, 08, Excel, Word, Microsoft

Project. Optimization Programs (advance) 18 years

GDS Estimating program (intermediate) 1 year

Timberline-some experience

WORK EXPERIENCE

Heinaman Contract Glazing

November 2012-April 2013

Project Manager

Three new projects.

Glass stair railing for a parking structure in Irvine

Glass Skylights for a laboratory in Irvine

Structural unitized curtain wall, entrance doors, architectural aluminum

panels, and aluminum sunshades in West Los Angeles.

Pacific Architectural Millwork

January 2012- August 2012

Project Manager-

J. Craig Venter Institute La Jolla Ca. Managed custom wood curtain wall

and window wall.

Spectrum Glass and Aluminum November 2008- July 2009

Project Manager-

Four new construction projects;

Catholic Church materials used, curtain wall, storefront, suspended glass,

aluminum sunshades.

Presbyterian Church material used, storefronts, commercial windows.

Embassy Suites hotel materials used, stick curtain wall, automatic doors.

Recreational Park materials used, commercial windows, storefront.

The Glass Factory January 2008 - April

2008

Different responsibilities; estimating, shop drawings preparation-

Arcadia Inc November 2006 - November 2007

Project Manager-

Peppermill Resort and Casino, Reno Nevada. Expanded on the custom system

design and managed the engineering and fabrication. Conducted mock-up test.

Prepared the construction schedule showing all phases of the project

including the delivery of materials to the job site. Purchase all

materials. Coordinated all deliveries with the customer and suppliers.

Change orders and RFI's and monthly billing. Created fabrication drawings

for miscellaneous parts.

LA-Live, Los Angeles CA- Prepared the construction schedule and delivery

schedule. Managed the preparation of shop drawings and fabrication

drawings.

Purchase all materials.

Permasteelisa Cladding Technologies June 2002 - November 2006

Project Manager-

LAC+USC General Hospital, Los Angeles CA. Managed the preparation of shop

drawings created in Montr al Canada and the preparation of fabrication

drawings and the fabrication of aluminum parts from Tennessee, Philippines

and China. Prepared the project schedule and supervised the deliveries of

units from China. Conducted and installed the project mock-up. Attended

meetings regarding the approval of shop drawings with OSHPD and Los Angeles

County planning department. Prepared revision of shop drawings using Auto

Cad 2004 according to job conditions. Issue changer orders, RFI's and

monthly billings.

Sierra Aluminum Architectural February 2000-June 2002

Fabrication shop project manager-

As a shop project manager I was in charge of all the projects in progress.

My responsibilities were; material schedule, fabrication schedule, delivery

schedules, coordination with different Sierra Aluminum departments.

Prepared

fabrication drawings using Auto Cad for miscellaneous parts. QC all

materials and conducted sealant tests. Main project, the Walt Disney

Concert hall

Carmel Architectural Sales February 1999-February

2000

Project Manager-

Dual role- project manager and project engineer. I managed and prepared

all shop drawings and fabrication drawings to include RFI's, change orders,

bill of materials for all my projects: Shanghai Commercial Bank in

Alhambra CA, FABCOM building in Santa Ana, and surveyed the LA County

Museum of Art in Los Angels for the possibility for new fa ade

Harmon Contract Asia Ltd Hong Kong January 1997- June 1999

Project Manager-

Participated in the mock-up installation and test in Florida for the Tsing

Yi MTR station in Hong Kong. Was transferred to Hong Kong to manage the

project. Managed preparation of fabrication drawings and the fabrication of

aluminum frames from the United States. Prepared the project schedule and

supervised the deliveries of units to the site. Purchase material from

Singapore and China. Issued RFI's and monthly billings, prepared bill of

materials.

Transferred back to the United Stated and assisted as a project manager the

senior project manger on the San Francisco International Airport. My

duties were to coordinate and schedule all material deliveries from the

fabricator and assembly plant to the job site.

Harmon Contract W.S.A. Inc November1990- January1997

Project Manager-

I was one of the project managers involved on the John Paul Getty Museum my

responsibilities were to coordinate all shop drawing and document all

change orders. Another part of my responsibilities was to do crisis

management. I solved schedule problems, material problems and job

condition problems. Managed a crew of 6 draftsmen and conducted QC at the

job site. Order steel anchors and miscellaneous materials.

Project coordinator for the MGM hotel in Las Vegas. Coordinated all

material deliveries from the extruder and fabricators.

Project Manager for the Southern California Gas Center 54 floors. My

responsibilities were to schedule all deliveries of unit and floor embeds

for the entire project. This project had over 8,500 units. Submitted all

documents and samples for approval. QC all workmanship and installation.

EDUCATION

James A. Garfield High School- high school diploma ; general major.

East Los Angeles Jr. College- Major Architecture, AA degree.

Cal-Poly University of Pomona- Major Urban Planning- 14 more units to

complete for BA degree.



Contact this candidate