POWER PLANT MANAGER

COMMISSIONING MANAGER

ROTATING MACHINE SPECIALIST

Personal details

Nationality: French

Date of Birth: 07 august 1966 Status: married, 4 children

Languages: French (mother tongue)

English (fluent)

Italian & Spanish (basic)

Qualifications: Master's Degree in Mechanical Engineering (Ecole Nationale

des Arts et Industries de Strasbourg France) Date of

qualification: 1989.

Master's degree in Fluids Mechanic and Acoustic (D.E.A.

Institut de M canique des Fluides de Strasbourg France)

Date : 1989.

Career Summary

From March 2014 to present :

FRANCE. POWEO PSS production SAS.

Pont sur Sambre power plant 420MW : Siemens SGT54000F gas

turbine single shaft in combined cycle. HRSG CMI 3 steam stage

pressure, DCS Siemens T3000.

Plant Manager (owner side) in charge 35 agents from the O&M

company.

From October 2012 to March 2014 :

ALGERIA. ALGERIAN OPERATION & MAINTENANCE company.

Koudiet Eddraouch power plant 1200MW : 3xGT GE9FB single shaft in

combined cycle. 3xST GE, 3xHRSG Doosan 3 steam stage pressure,

DCS system MK6e by GE. Water plant including 2 desalination

units.

Plant Manager in charge of 85 agents for the operation &

Maintenance of the plant.

From January 2012 to September 2012 :

TUNISIA. SEREPT company : ASHTART revamping project (GABES gulf). Start-

up leader, in charge of bringing an Oil production platform back

to production after a major revamping.

From June 2010 to January 2012:

FRANCE. SNC LAVALIN : Saint-Avit gas compression and interconnection

station (100ME). 2 GE/Thermodyn compressors (10MW) associated

with 10 pig receiving stations. OPERCOM methodology (ICAPS

software) used for commissioning follow up. Capacity up to

750kNm3/h.

Commissioning Manager in charge of all pre-commissioning &

commissioning activities up to handover from HV substation,

compressors, gas coolers, metering, Fire fighting system, SCADA,

motorized and control valves @ 80b.

November 2007 to May 2010 :

ALGERIA. SNC LAVALIN : SKIKDA power plant (525ME) 830MW : 2 GT GE9FA in

combined cycle double shaft. 2 ST ALSTOM, 2 HRSG ALSTOM 3 steam

stage pressure, P320 SCADA system by ALSTOM. Water plant

including 2 desalination units (AQUATEC).

Plant Operation Manager in charge of 32 agents.

Mars 2007 to October 2007 :

ITALY. ACEA-ELECTRABEL : LEINI power plant (158ME) 390MW : 1 GT

Siemens V94.3A in combined cycle double shaft. 1 ST ANSALDO, 1

HRSG STF, DCS by ABB.

Owner engineer in charge of the verification / validation of the

commissioning activities up to performance tests and take over.

Mars 2006 to January 07 :

ITALY. ELECTRABEL : Rosignano/Roselectra power plant (160ME) 400MW : 1

GT Siemens V94.3A in combined cycle single shaft. 1 ST ANSALDO,

1 HRSG ANSALDO, DCS by ABB.

Owner engineer in charge of the verification / validation of the

commissioning activities up to performance tests and take over.

April 2004 to February 06 :

TURQUEY. GENERAL ELECTRIC project : Kemalpasa power plant ($58M; 120MW): 2

GE Gas Turbines 6C dual fuel in combined cycle. 1 GE Steam

Turbine, 2 NEM HRSG's, YOKOGAWA DCS.

Commissioning Manager, in charge of the commissioning of the

whole plant (GT, ST, HRSG, ACC, BOP). Challenge to integrate

prototype GT test (MK6 supervision, DLN2.5H) still under

development in a tight overall schedule.

My responsibilities involve preparing Commissioning Schedules,

managing commissioning teams and relation with customer for

contract follow up. In charge of the site management as well

since November 05.

May 2001 to March 04 :

UNITED ARAB EMIRATES. TOTAL/TRACTEBEL project : Taweelah power &

desalination plant ($1500M; 1350MW) : 8 General

Electric Gas Turbines 9E DLN1 dual in combined

cycle, 3 Alstom Steam Turbines, Babcock HRSG's,

Sidem desalination units.

Consultant Engineer in charge of rotating

machines:

. Upgrading of three old gas turbines to frame 9E : mechanical

refurbishment, control system upgrade to MK5 under HMI supervision.

Pre commissioning, commissioning, performance test.

. Commissioning manager of 5 brand new gas turbines GE 9E from pre

commissioning to final acceptance certificate.

. Technical advisor for Steam turbines commissioning.

. Technical assistance to the operators and the maintenance team.

GENERAL ELECTRIC Energy Products Europe (previously European Gas Turbines)

November 1998 to April 2001 :

GREECE: Lavrion power plant (550MW) 3 GE Gas Turbines 9E DLN1 dual in

combined cycle, 1 Alstom Steam Turbine, 3 Alstom HRSG's

GE Site Manager for the 3 gas turbines from the end of erection up to

customer final acceptance, in charge of:

. Commissioning of the gas turbine and its auxiliaries; gas reducing and

filtering station, Fuel oil treatment plant, tuning of DLN1 system,

Inlet bleed heating system, on & off line compressor water wash skid.

. Customer relations.

. Technical assistance to the operators and the maintenance team.

. Warranty engineer

. Maintenance leader for combustion inspection and Hot gas part

inspection

December 1997 to October 1998 :

U.K. : SMURFIT Townsend Hook paper mill factory (57MW) 1 GE Gas Turbine 6B

dual in combined cycle.

GE Site Manager from the end of erection to the end of commissioning in

charge of:

. Commissioning of the gas turbine and its auxiliaries; gas reducing and

filtering station, steam injection skid for Nox reduction.

. Interface with the boiler and the steam turbine.

. Customer relations.

February 1997 to November 1997 :

IVORY COAST : VRIDI 2 power plant (110MW) 1GE gas turbine 9E triple fuel.

Field commissioning engineer in charge of both pre comm. and commissioning

of the gas turbine and all of its auxiliaries: fuel heating skid, fire

fighting system, water wash skid and to the integration of this new unit in

the existing plant: DCS re configuration. Follow up from the end of

erection to the customer final acceptance.

February 1996 to January 1997 :

U.K. : Connah's Quay power plant. (1400 MW) 4x 9FA DLN2 Gas Turbine

Generators in combined cycle

Field commissioning engineer in charge of pre comm and commissioning of one

unit and its auxiliary : DLN2 gas skid, fire fighting system, water wash

skid, Inlet bleed heating system, DCS serial link, combustion monitoring to

optimise the Nox emission.

ALPHATEM Company

December 1993 to January 1996 :

FRANCE: Cadarache nuclear research center (COGEMA)

Commissioning engineer in charge of:

. Redaction of commissioning procedures

. Commissioning and optimization of double acting press for nuclear fuel

. Technical assistance to the operators and the maintenance team.

March 1993 to November 1993 :

GERMANY : European Transonic Wind tunnel research center

Commissioning engineer in charge of pre commissioning of mechanical

equipment

Traveling crane, instrumentation room, cryogenic compressor

November 1989 to November 1991 :

FRANCE : La Hague nuclear waste reprocessing plant (COGEMA)

Commissioning engineer in charge of:

. Redaction of commissioning procedures

. Commissioning of automatic conditioner unit for by-products of

reprocessing radioactive waste.

TRAINING :

. GE Speedtronic MK4 (1996), MK5 (1996), MK6 (2007), MK6e (2013)

. DCS Alstom P320 : CentraLOG + ControCAD (2008)

. ATEX and (French) Electrical habilitations H2 B2 BR HC BC