***** ******* ***** **. **** Wagner Cell: 419-***-****
E. ************@*****.***
Bowling Green, OH 43402
PROFESSIONAL PROFILE
. Results-driven, quality-focused and technically proficient Materials,
Production Planning & SIOP professional, with over 7 years
manufacturing experience.
. Experienced in identifying continuous improvement opportunities,
contributing to cost and waste reduction and increased productivity.
. Demonstrate cross-functional and proactive planning, with strong work
ethic & innovative integrity to improve bottom-line profitability and
operational efficiency.
. Skilled in meeting deadlines within team-oriented framework under high-
pressure conditions.
. Technical proficiency with MS Office ( QAD/MFG-Pro ( 20/20 Design
Software ( AutoCAD ( Allen-Bradley
education
University of Toledo; Toledo, OH
B.S. - Business Administration, Supply Chain Management and Finance
2009
professional Experience
SCHERER & TRIER USA; Saline, MI 2013 - Present
Logistics/Materials Manager
. Supervise 3 Material Analyst and 15 hourly employees as direct
reports, over 3 shifts
. Reduced days on hand by 70%
. Reduced the consumption of expendable packaging from $30,000 a month
to zero unrecoverable costs
. Collectively worked with all departments to pass the VDA 6.3 Audit
. A critical asset to achievement of the ISO/TS 16949 certification,
2009, 4th edition.
. Work with Operations Manager to develop models for plant capacity,
materials requirement, and labor forecasting in support of Sales and
Operations Planning cycle.
. Increased On-Time delivery performance from 75% to 100% in 3 months
and have maintained this level.
. Improved all customer scorecards with an improvement up to 64%
. Continually work with Operations Manager to plan production based on
theoretical outputs, manning, returnable packaging and customer
demands.
. Record and report out month end reports along with developing
necessary preventative measures to ensure all future goals are met.
JOHNSON CONTROLS INC.; Sycamore, IL
2010 - 2013
Master Scheduler
. Day-to-Day Responsibilities
o Assisted Materials Manager in the supervision of 24 operators
between 2 shifts
o Managed days on hand inventory to meet the $2.3 million monthly
goal while providing JIT (just-in-time) production to the
automotive industry at a Tier 1 level.
o Established and maintained appropriate inventory levels required
to maintain production based on data analysis of customer
demand, forecasts, and supplier reliability.
o Forecasted and managed $4.2 M yearly spend for freight along
with continually monitoring trailer utilization.
o Participated in support of Sales and Operations Process (S&OP)
o Maintained bill of materials and sales order revisions that are
critical to its accuracy of ensuring proper material being
transacted through EDI, affecting supplier releases.
o Monitored inventory accuracy, stocking location, cycle count and
physical inventory programs. Provided monthly reporting of
trailer utilization.
. Inventory Control
o Responsible for continuous improvement of all measures of
inventory control.
o Developed and implement material control systems to assure the
availability of parts, materials, and transportation for an
uninterrupted flow of production in accordance with customer
release while maintaining inventories and reasonable work force
stability.
o Prepared for model build-out and implement actions to prevent
unclaimable obsolescence along with ensuring no production
shortages.
. Operations Support
o Determined indirect labor manning including modifying processes
to achieve maximum efficiency.
o Worked with the Operations Manager to develop models for plant
capacity, materials requirement, and labor forecasting in
support of Sales and Operations Planning cycle.
o Analyzed, designed and implemented line replenishment methods,
locations, racking, and scheduling to optimize material handler
utilization.
. Supplier Relations
o Managed releases to over 46 suppliers and over 400 parts, in
both the U.S. and Mexico to meet fluctuating requirements.
o Communicated with suppliers to resolve issues involving
manufacturing delays or delays in transportation of material to
arrive at a solution while not impacting the customer.
. Reporting
o Responsible for the tracking and validation of accurate releases
including raw and fabrication of material to ensure proper
authorization of material procurement occurs in a timely manner.
o Updated and maintain internal MRP systems including data basis
and reports required for on-going service and accuracy.
o Recorded and report out month end reports along with developing
necessary preventative measures to ensure all future goals are
met.
CONTROL DESIGN SOLUTIONS, LTD; Bowling Green, OH 2005 -
2010
Production Planner/CAD Designer
. Designed and developed equipment to replace two high maintenance
machines with one lower maintenance machine able to produce at a
higher capacity resulting in $120k project investment paying for
itself in 18 months.
. Instrumental part of the team for the upgrade industrial machine
servos project resulting in an increased output by 8%, from 70 to
75 bags per minute.
. Implemented/created standardized procedures and symbols for
projects that reduced inconsistencies and design time.
. Hands-on experience with industrial automation equipment problem
identification and resolution techniques.
. Assisted with marketing efforts to generate new clientele through
developing and executing new promotional ideas and strategies.
JIM'S KITCHENS & BATHS; Murfreesboro, TN
2005
Project Manager
. Created standardized layout drawings for housing models resulting
in better inventory turnover, reduced order cycle times and
minimizing errors.
. Executed inventory scanning procedure instead of manual check,
reducing errors and decreasing average unload time by 30 minutes.
. Minimized total inventory by seven (7) days, while maintaining a
10% safety stock for most common products.
. Managed day-to-day operations and implemented morning meeting
reviews to establish team priorities and scheduling goals for crew
of eight.
. Controlled procurement of countertops to minimize cost per unit
delivery charges and preventing excess inventory.
. Instituted job performance evaluation checklist to expedite project
completion. Monitored and evaluated efficiency of all
installations.