Inderdeep Singh Raina
Email: *********.****@*****.***
Mob : +91-750*******, 852-***-****
EXPERIENCE SUMMARY
Worked as a Project Coordinator for different Telecom Projects, Team handling, Project Management, Training the fresher Engineers to work on live telecom sites, supports in troubleshooting of network deployment & Implementation activities.
L2 PTID certified professional for 2G, 3G, LTE Implementation and Commissioning and MW installation and commissioning from Nokia Siemens Networks.
High energy, result oriented professional with 6 yrs 9 months of experience.
Currently working for Rawelcom Services in Training Delivery Department, for ITS (Individual Training Solution), ATS (Academic Training Solution) and ETS (Entrepreneur Training Solution).
Strong analytical and communication skills with ability to understand project needs/practices for Industry and College tie-ups.
Excellent Training delivery capability on most Telecommunication modules related to ATS tie-ups.
Knowledge of the complete MSC, BSC and BTS installation and commissioning and Link installation and commissioning with experience of working at every stage.
Expertise in I/C Ericsson RBS 2204, RBS 2206, RBS 2964, RBS 2954, RBS 2111, RBS 6201, RBS 6202, RBS 6601, BTS 3900, BTS 3900A, ZTE 8812, 8800, NSN Flexi EDGE, Ultra BTS of Nokia Siemens Network and Node B, I/C of Nokia Flexi hopper. SARAL, NEC, CERAGON, FIU, FIFA, FTFB, FXCRRI, FLEXI HYBRID, FPMR, FMR, WIMAX, I-WAN,
Current Company : Rawelcom services
Current Location : New Delhi
Current Role in company : Assistant Manager Learning & Development Department cum Sr. Technical Trainer (Telecom)
Designation : Assistant Manager Learning & Development Department
KEY SKILLS IN TRAINING DELIVERY
WIRELESS COMMUNICATION BASICS
GSM, AND WCDMA(3G) BANDS, NETWORK ARCHITECTURE
LTE(4G)NETWORK ARCHITECTURE
BSS AND NSS
OPEARATION AND MAINTENANCE
MICROWAVE TRANSMISSION
PDH AND SDH
NETWORK TROUBLESHOOTING
INTEGRATION & COMMISSIONING OF MULTIVENDOR BTS (ERICSSON, NSN)
I/C OF MULTIVENDOR TRANSMISSION EQUIPMENTS (ERICSSON, NSN, NEC)
NOKIA GSM BTS / WCDMA NODE B / LTE e NODE B
ERICSSON GSM RBS 2204, RBS 2206, RBS 2964, RBS 2954, RBS 2111, RBS 6201, RBS 6202, RBS 6601, RBS 6601 E I&C
PROFESSIONAL EXPERIENCE
Currently Working For ( Rawelcom Services LOCATION –New Delhi
AM Cum Sr. Technical Trainer Telecom November 2011 to Present
Rawelcom Group is a fast growing enterprise in the field of Telecommunication Network. The Company which started with a meager strength now boasts of a strong, dedicated & experienced work force. Rawelcom Engineering Pvt. Ltd, erstwhile known as Rawelcom, is one of the leading approved Service Provider registered with Nokia Siemens Networks, Ericsson, Reliance GSM Delhi Huawei, ZTE Airtel, Aircel, Vodafone, Indus Towers, Idea, TTSL, HCL, Alcatel-Lucent and other leading Telecom Companies for Network Planning, Equipment Installation, Testing, Commissioning, Integration and Maintenance of GSM/CDMA Network on Pan India basis. In addition to this we are also the “Total Service Provider” for ERICSSON.
I have been involved in the training department in the company where I have to deliver Interactive and advanced training modules on different Telecom domains like on several College/University campuses which are having tie-up with the company. Apart from it I also used to deliver training to the project teams of Rawelcom Engineering Pvt. Ltd. and some other Telecom Vendor company’s professionals.
Role and Key Responsibility Attributes-
L&D Asst. Manager & Telecom Training Delivery (Corporate/Individual)
Conducting Training Programs in academy (Approx. of 1250 hrs an year, i.e. 5 hrs for 250 days
Conducting 15 Batches for different clients e.g. DGR, VTP, DTP, STP, JLP, ITP, DGET, MRIU, DCET, LPU, PTU, UPTU and many B. Tech candidates.
Take care of Content development, preparing CMR (Classroom Management Report) for Dwarka, Noida & Bhubaneswar Centers and also Manage Trainer Availability, Plan Vs Actual of course modules for Telecom, Embedded & Networking Batches, Final assessment of candidates.
Snapshots:
Delivered proficiency in coordinating final year project to students in Academic Tie-up for 6 months Industrial Internship training with Manav Rachna International University (MRIU), Faridabad. (Batch Size-80)
Delivered complete training on different modules to 6 weeks Summer Internship Training Tie- up with Dronacharya College of Engineering (DCET), Gurgaon (Batch Size- 40)
Delivered complete training on different modules to 3 weeks Summer Internship Training Tie- up with HP
Education Services (HPES), Delhi. (Batch Size- 15)
Delivered complete training on different modules in 2 months training program for Fresher hired candidates. (Batch Size- 30)
Delivered complete training on different modules in 3 months Directorate of General Resettlement (DGR) training program for Armed forces Personals (Batch Size-40)
Delivered interactive training sessions to the Project Manpower of Rawelcom Group (Batch Size-30
Projects Handled
CircleProjectRoleDurationRajasthanAirtel-EricssonProject ManagementMar-11 to Nov-11RajasthanUninor- EricssonProject ManagementRajasthanAircel-NSNProject ManagementUP WestAirtel-EricssonProject CoordinationDec-10 to Mar-11UP WestUninor- EricssonProject CoordinationUP WestIdea-NSNProject CoordinationUP WestTata 3G-NSNProject CoordinationUP WestAirtel I-WAN-EricssonProject CoordinationRajasthanAircel-NSNProject CoordinationOct-10 to Dec-10DelhiEtisalat-EricssonO&M EngineerJuly-10 to Oct-10UP WestTata 2G-NSNProject CoordinationMar-10 to July-10UP WestAirceL ZTE, NECCommissioning, Integration and ATPJan-10 to Mar-10DelhiAircel-NSNCommissioning, Integration and ATPJan-09 to Jan-10RajasthanAirtel -EricssonCommissioning and Integration RolloutMar-08 to Jan 09DelhiAirtel-EricssonCommissioning, Integration and ATPSep-07 to Mar-08DelhiIdea-NSNCommissioning, Integration and ATPSep-07 to Mar-08
ADDITIONAL SKILLS
( Handling and implementing man power as per Customer’s planning and Project needs.
( Handling all documentation regarding project like Work order, Site Quality reports, WCC, Invoice Billing etc.
( Overlooking the productivity of employees on monthly basis.
( Preparing and updating DPRs on daily basis.
( Site Integration (including E1 testing, cascading etc.)
( External Alarm Termination & Rectification.
( VSWR measurement and fault finding (Site Master handling)
( VSWR alarm rectification and Power Measurement.
( Site Quality visits.
( RFI survey for 3G
( Installation and Commissioning of different BTS like NSN Flexi, Ericsson 2964, 6601, 6201, 6202
( Documentation, including VSWR/SQR/RFI/EMR/FEASIBILITY Survey Report Submission.( AT and Site hand over Activities.
( Complete troubleshooting of NSN, Ericsson BTS.
COMPUTER PROFICIENCY
Operating Systems : DOS, Windows XP/Vista/7/8
Software packages : MS-Office 2003/2007, Outlook
CERTIFICATIONS
PTID RAWELCOM/T/L-4/033***-****
PTID 0239-091AASX0040186 L2 PTID JUNE 2012 July 2014
MSC Health & Safety Certificate From NSN (Force tech) July2012
SAMSUNG SOLPAR LTE 4G Training RJIL March 2014
ACADEMIC QUALIFICATIONS
Courses Institute%Year M.A. EnglishMahatma Gandhi University, Meghalaya.62%2012B.A.Maharaja Ganga Singh University Bikaner, Rajasthan59%200712th Board of Secondary Education, Ajmer, Rajasthan.65.08%200410TH Board of Secondary Education, Ajmer, Rajasthan.71.67%2002
PERSONAL INFORMATION
Passport Status : Available
Passport No : G 5210489
Passport Validity : 29/11/2007 to 28/11/2017
Date of Birth : 31st August 1986
Gender : Male
Marital Status : Married.
Languages known : English, Hindi, Punjabi
Correspondence Address : WZ-605, 1 st Floor, Bay 5, Near Jain Dharamshala, Jaat Chaupal, Palam Colony, New Delhi.110077
Permanent Address : S/O Satinder Singh Raina, House no 122, Ward No. 10, Raisinghnagar, Sriganganagar, Rajasthan, India PIN-335051
Dated (Inderdeep Raina)