Post Job Free

Resume

Sign in

Engineer Project

Location:
Denver, CO
Posted:
September 10, 2014

Contact this candidate

Resume:

Ashraf Almasry

** *** ****** ****# *****

Henderson, NV 89011

acfvpn@r.postjobfree.com

702-***-****

OBJECTIVE Project Controls Engineer

July 2010 Scheduling Engineer

Present Vegas Tunnel Constructors/ SA Healy

Lake Mead Tunnel/Boulder City, NV

Developed and maintained logic driven cost loaded schedule for

construction activities

Submitted CPM monthly update schedule and weekly three week

look ahead Schedule

Produced daily production reports and prepared pay application

Generated project monthly cash flow reports and forecasted

revenue

August 2009 Project Scheduler

November2009 TSSD Services/TRC Engineering/FPL Seabrook Nuclear Plant, NH

Developed, updated online Switchyard Reliability project

schedule. Issued daily progress reports included 2 week look

ahead, critical path, short sheets, usage profile, 24 hours of

critical and project Variance. Performed critical path analysis

and base line management.

April 2009 Primavera Developer

May 2009 National Grid Work Delivery Group Northborough, MA

Reviewed and developed power transmission project schedules

(Substations/Lines)

March 2007 Planner/Scheduler

March 2009 North East Utilities / PSNH Manchester, NH

115kV Power St. Substation Hudson, NH

Hudson SS/Power St. Line Cutover Hudson, NH

V182 115kV Transmission Line between Garvins /Webster, NH (25Miles)

V182 P+C Modifications @ Webster SS and Garvins SS, NH

K165 P+C Modifications @ Reeds Ferry SS, NH

345 kV Breakers, CCVTs and LAs Replacement @ Scobie SS and

Berlin SS

Utilized Primavera P6 to develop and maintain detailed logic

driven schedules Included (Engineering/Procurement

/Constructions/Outages) based on the WBS, with task-definitions,

dependencies between activities, deliverables and milestone

dates explicitly identified, Interact with suppliers and vendor

to collect and collate progress information and status to update

the project schedule and report to the project team for the

above mentioned transmission projects

Created and maintained baseline schedules for comparison reports

January00 Scheduler/Cost Engineer

March 2007 Modern Continental, Central Artery Tunnel project Boston, MA

I-90 Fort Point Channel Crossing, Silver Line Tunnel & I-90/I-

93 Tunnel projects

. Utilized Primavera software to support site construction

activities with updated

Ashraf Malk

Page 2

construction schedules and analysis, and interface with various

project subcontractors

to coordinate schedule integration

. Prepare construction estimation, cost planning and claim

analysis reports

. Prepare and submit claims for extra work and change orders

including labor, material, equipment and sub costs.

. Monitor and assign cost codes for construction activities on

foremen daily labour reports

. Prepare and submit contractor quantity estimate for all the

project's pay items

August99 QC Engineer

January00 EnviroServe Inc., Wakefield, Massachusetts

Barracks Rehabilitation Building 15, US Army, Natick, MA

. Prepared and reviewed submittals for construction activities in

accordance with the project's specifications

Feb. 1996 Engineering Field and Lab Technician

August1999 METRO TESTING LABORATORIES BURNABY, BC

Vancouver International Airport runway & Bay shore Towers

projects

. Prepared field and lab test results reports as well as

letters of assurance for different projects

. Approved tested and monitored excavation and compaction of

soils

. Performed quality control tests on concrete and soils in

accordance with ASTM

January 1996 Surveyor

February 1996 WALTER & SCI CONSTRUCTION

West Coast Express Second Narrows Shoreline Improvements

. Layout and grading for the excavation, backfilling, side slopes

and the sub-grade of the pre-cast stress wall

July 1995- Grade Checker/Surveyor

October 1995 PETER KIEWIT SONS Co. Ltd. Richmond, B.C.

Vancouver International Airport Parallel Runway project

. Operated the dual plane laser level in slope staking and

grading the infields between the Taxiways and the Runway, the

glide path and the sub-base of the access road and monitored the

paving of the cement soil base of the Apron.

EDUCATION B.Sc.Civil Engineering

1986 Assiut University, Assiut, Egypt

1997 Computer Estimating Course

New Westminster, B.C.

1997 Conflict Resolutions Studies

October 99 Construction Quality Management for Contractors

Course US Army Corps of Engineers, Concord

Massachusetts

November 2000 Planning and Scheduling with P3 Course #601,

Cambridge MA

COMPUTER SKILLS AutoCAD, PrimaveraP3, P5 and P6, Autosketch, Word

Perfect 5.1, Word, Excel 5, Lotus 1-2-3 V5 for

windows 3.11+ 95andQ +

REFERENCES Letters of reference available upon request.



Contact this candidate