Ashraf Almasry
Henderson, NV 89011
******.*********@*****.***
OBJECTIVE Project Controls Engineer
July 2010 Scheduling Engineer
Present Vegas Tunnel Constructors/ SA Healy
Lake Mead Tunnel/Boulder City, NV
Developed and maintained logic driven cost loaded schedule for
construction activities
Submitted CPM monthly update schedule and weekly three week
look ahead Schedule
Produced daily production reports and prepared pay application
Generated project monthly cash flow reports and forecasted
revenue
August 2009 Project Scheduler
November2009 TSSD Services/TRC Engineering/FPL Seabrook Nuclear Plant, NH
Developed, updated online Switchyard Reliability project
schedule. Issued daily progress reports included 2 week look
ahead, critical path, short sheets, usage profile, 24 hours of
critical and project Variance. Performed critical path analysis
and base line management.
April 2009 Primavera Developer
May 2009 National Grid Work Delivery Group Northborough, MA
Reviewed and developed power transmission project schedules
(Substations/Lines)
March 2007 Planner/Scheduler
March 2009 North East Utilities / PSNH Manchester, NH
115kV Power St. Substation Hudson, NH
Hudson SS/Power St. Line Cutover Hudson, NH
V182 115kV Transmission Line between Garvins /Webster, NH (25Miles)
V182 P+C Modifications @ Webster SS and Garvins SS, NH
K165 P+C Modifications @ Reeds Ferry SS, NH
345 kV Breakers, CCVTs and LAs Replacement @ Scobie SS and
Berlin SS
Utilized Primavera P6 to develop and maintain detailed logic
driven schedules Included (Engineering/Procurement
/Constructions/Outages) based on the WBS, with task-definitions,
dependencies between activities, deliverables and milestone
dates explicitly identified, Interact with suppliers and vendor
to collect and collate progress information and status to update
the project schedule and report to the project team for the
above mentioned transmission projects
Created and maintained baseline schedules for comparison reports
January00 Scheduler/Cost Engineer
March 2007 Modern Continental, Central Artery Tunnel project Boston, MA
I-90 Fort Point Channel Crossing, Silver Line Tunnel & I-90/I-
93 Tunnel projects
. Utilized Primavera software to support site construction
activities with updated
Ashraf Malk
Page 2
construction schedules and analysis, and interface with various
project subcontractors
to coordinate schedule integration
. Prepare construction estimation, cost planning and claim
analysis reports
. Prepare and submit claims for extra work and change orders
including labor, material, equipment and sub costs.
. Monitor and assign cost codes for construction activities on
foremen daily labour reports
. Prepare and submit contractor quantity estimate for all the
project's pay items
August99 QC Engineer
January00 EnviroServe Inc., Wakefield, Massachusetts
Barracks Rehabilitation Building 15, US Army, Natick, MA
. Prepared and reviewed submittals for construction activities in
accordance with the project's specifications
Feb. 1996 Engineering Field and Lab Technician
August1999 METRO TESTING LABORATORIES BURNABY, BC
Vancouver International Airport runway & Bay shore Towers
projects
. Prepared field and lab test results reports as well as
letters of assurance for different projects
. Approved tested and monitored excavation and compaction of
soils
. Performed quality control tests on concrete and soils in
accordance with ASTM
January 1996 Surveyor
February 1996 WALTER & SCI CONSTRUCTION
West Coast Express Second Narrows Shoreline Improvements
. Layout and grading for the excavation, backfilling, side slopes
and the sub-grade of the pre-cast stress wall
July 1995- Grade Checker/Surveyor
October 1995 PETER KIEWIT SONS Co. Ltd. Richmond, B.C.
Vancouver International Airport Parallel Runway project
. Operated the dual plane laser level in slope staking and
grading the infields between the Taxiways and the Runway, the
glide path and the sub-base of the access road and monitored the
paving of the cement soil base of the Apron.
EDUCATION B.Sc.Civil Engineering
1986 Assiut University, Assiut, Egypt
1997 Computer Estimating Course
New Westminster, B.C.
1997 Conflict Resolutions Studies
October 99 Construction Quality Management for Contractors
Course US Army Corps of Engineers, Concord
Massachusetts
November 2000 Planning and Scheduling with P3 Course #601,
Cambridge MA
COMPUTER SKILLS AutoCAD, PrimaveraP3, P5 and P6, Autosketch, Word
Perfect 5.1, Word, Excel 5, Lotus 1-2-3 V5 for
windows 3.11+ 95andQ +
REFERENCES Letters of reference available upon request.