V I N C E N T J. S P A L L I E R O
*** ******* ****** ***** ****, CA 95060 831-***-**** ***************@*****.***
Summary of Qualifications
A highly organized, accomplished and talented candidate with extensive knowledge of handling daily
administrative tasks; seeking a position to utilize my skills and abilities to fulfill the needs of clients and
the organization.
Core Competencies:
• Ability to communicate professionally and effectively
• Enthusiastic, ability to take initiative with excellent telephone etiquette
• Extensive knowledge of customer service, accounting, human relations and management
• Ability to write business correspondence in a clear and concise way
• Possess excellent organizational and multi tasking skills
• Good problem solving and excellent time management skills
• Possess working knowledge of Word, Excel and the Internet
Professional Experience
Exalt Communications, Inc., Campbell, CA
Production Manager (2013 Present)
• •
Oversee and supervise mechanical Kanban inventory
assembly. • Repair for NPI production
• Responsible for day to day backlog. • Bill of Material (BOM)
• Expandable backflush • Revision controls
• Box build statistical analysis • ISO 9011, TL 9001
• Regulating compliance • Data collection for gap analysis
• Six sigma, DFM, DFA practices • Best practices
• Lean Manufacturing • Product Management
• Inventory control
Milestone Technologies, Inc., Fremont, CA
Production Manager / D/R Lead (2012 2013)
• Deinstall and reinstall computers, peripherals and servers
• Accurately inventory desktop and server equipment
• Create accurate diagrams of cubical setups
• Deploy Cisco phones
• Managed desktop/server relocations, Cisco phone deployments and inventory projects
• Desktops: PCs
• Servers: HP/Dell/Cisco/IBM/Juniper
• Switches: Brocade/Cisco/Juniper
• Cable Management: power supply, Cat 5, Cat 5e, Cat 6, Fiber
• Installation/troubleshooting/configuration of Windows XP/Vista/7
PCA / Pacific Circuit Assembly, San Jose, CA
Program Manager / Site Manager (2008 2012)
• Quotes: All production and prototype RFQ’s
• Component (level) procurement
• PPV Responsibilities and analysis
• DFM Review and implementation
• WIP Factory loading and analysis to ensure on time delivery.
• Prototype board analysis Ensure customers are aware of all levels of production cost controls
and potential quality deficits.
• Customer base new customer identification and factory follow through
• AP and AR responsibilities
Vinney’s Wine and Spirits, Palm Desert, CA
Owner Operator (2006 2008)
• Responsible for day to day operations.
• Managed eight employees.
• Responsible for all accounting functions (AP & AR).
• 15 inventory turn per annum.
• Procurement/buyer – All inventory.
Comtel Electronics, Irvine, CA
Operations Manager (1998 2006)
• Responsible for all departments on the manufacturing floor: Prep, Surface Mount Technology (6
Fuji Lines), Stuffing, Wave Solder, Second Operations, Final Assembly, In Circuit and
Functional Test, Shipping and Receiving.
• Met or exceeded all revenue expectations (Backlog) on month to month basis.
• Problem solved each department reducing process inefficiencies as well as quality issues from a
net first pass yield of 75% to an overall 93% first pass yield (avg. encompasses entire customer
base) through In Circuit and/or Functional Test.
• Reduced work order variance by approximately 20% throughout customer base by instituting
process review.
• Instituted New Product Development Center for prototype manufacturing as a stand alone unit.
• Responsible for ISO 9000, 9002 procedure implementation, control and audits throughout
factory.
Superior Manufacturing, Santa Ana, CA
Materials Operations / Program Manager (1995 1998)
• Improved on time delivery from 78% 98% throughout customer base by improving
communications, material analysis and design review.
• Successfully facilitated projects / customers through all stages of business development.
Introduction of new projects, cost controls, on time delivery, PPV and material controls.
• Customers: Tandem, LTX, Sequel, Xerox, Gammalink, Lam Research, Intermec, Applied
Materials, Etc.
• Responsible for all material movement throughout factory including costing.
2
• Responsible for ISO implementation and procedure production.
LeeMah Manufacturing
Program Manager
Stanford Telecommunications
Project Manager
Tanon Manufacturing
Program Manager, Production Manager, Materials Manager, Supervisor Materials
Education and Training
• •
San Jose State University, San Jose, Management Negotiations
CA (1992), 6 units GE pending. • ISO 9000 and 9002 Training
• B.A. Natural Science/Mammalian • S212 Quality Training
Physiology
• Hazardous Materials Training
• Dean’s List (4 years)
• Aames Intensive Loan Officer
• SPC Training / Total Quality Training
Management
• Bank One Loan Officer Training
• Inventory and cycle count accuracy
Computer
• •
Microsoft Word Rapid Response
• •
Microsoft PowerPoint Agile (Oracle)
• •
Microsoft Excel Various financial software
• •
Microsoft Project Haven
• •
Expandable Oracle Vision
• •
Unify Fracas (WIP Tracking System)
• •
Syspro Aurora
3