Post Job Free

Resume

Sign in

Engineer Project

Location:
Columbus, OH
Posted:
September 10, 2014

Contact this candidate

Resume:

Mahmood Shirvani Tell: 614-***-****

**** **** ********** *** ****: 614-***-****

Grove City, Ohio 43123

acfu6e@r.postjobfree.com

Summary of Qualifications

Extensive experiment and highly motivated in Mechanical and Industrial (E-

MBA) Engineering Profession. With over 20 years of diversified engineering

background, having operated in both public and private sectors in various

engineering processes and project management, including project

engineering, Facilities Engineering infrastructures, product design

improvement, value engineering, construction engineering, manufacturing,

sourcing and supply chain development, Logistics, quality improvement by

utilizing six sigma, manufacturing and manufacturing finance.

Core Competencies

Facilities and Plant Management, Construction Supervision, Logistics

Engineer, Project Organization, Staff Management, Hospitalities, Client

Relations, Budgeting, Inventory Control, Vender Relations, Contract

Negotiations, Regulatory Compliance, Equipment Installation and

Maintenance, Maintenance Procedure Development, Project leadership.

Job Descriptions

Ensuring complete predictive, preventative maintenance and calibration is

performed on all facility equipment prior to and following installations.

Confirm site infrastructure and facility's support is in compliance with

all Federal, State, and Local regulatory agencies and site requirements.

Providing leadership and support for all facility equipment including

boilers, chillers, water treatment gears, cooling tower, environmental

systems, air handling units, electrical and distribution systems, including

equipment management controls (VFDs', AFDs', and PLCs), plumbing, piping,

control systems, building energy management, fire suppression, and security

systems. Ensure monthly, quarterly, and annual maintenance operations and

equipment reliability as well as reviews are accomplished to facilitate and

enhancing maintenance operations and equipment dependability. Manage and

coordinate with outside and third party contractors and vendors.

PROFESINAL EXPERIENCE and PROJECTS HIGHLIGHTS

2012 -- Present Dynotec, Inc. Columbus, Ohio

Mechanical Project Engineer/Manager: (Contract)

. Assisted with a $30 M Contract construction of a raw water pumping

station with Four Vertical Turbine pumps with 1000 Horse Power motors for

a new Nine Billion Gallons Reservoir, including an inflatable weir in the

Scioto River, a river intake structure, intake piping and channel,

screening equipment, piping and appurtenances, and all associated site

work and utilities including Air conditioning, Gas unit heaters,

Dehumidifiers, Pressure tanks, 10 HP Air compressors, Furnace and Hot

water heater at the pump station site.

. Administered installation of major capital equipment in Industrial

setting. Coordinate contractors for needed improvements and changes to

accommodate new equipment. Negotiated best prices with contractors to

control costs Monitor scheduling and assure timeliness of project.

Oversee and ensure scheduled equipment installations are accomplished by

manufacturers and contractors.

2011 - 2012 Advanced Engineering Design, Inc. Raleigh, North Carolina

Mechanical Project Manager: (Contract)

Environmental Protection Agency (EPA),

. Provided leadership, direction and support to EPA's staff and engineering

department on overall Facilities operations to ensure complete predictive

and preventative maintenance for all facility aged and latest equipment,

including interior and exterior maintenance of all buildings (1,000,000

Square Feet) with, mechanical systems and equipment to include utilities,

refrigeration, HVAC, BAS (Building Automation System), plumbing,

electricity, natural gas as well as elevators and grounds.

. Assisted in planning, execution and management of day-to-day operations

of current and future Construction/Engineering Projects for EPA property,

and working closely with Architects and Design professionals,

Construction and Contractors to satisfy the needs of the properties.

. Oversaw renovation and reconstruction of National Computer Center with

installation new Heating, Ventilation and Air-conditioning fan coil

system for new renovated office use with 42 new workstations.

. Administered renovation of environmental systems for design of Glycol

Heat Recovery Loops within existing air handling units, in conjunction

with electrical dampers for exhaust air distribution systems, including

equipment management controls (AFDs', and PLCs), pluming, and piping.

. Supervised renovation of an aged Electrical lab to a class 1000 clean

room as a prototype for future renovations of 170 aged laboratory units.

. Supervised substitution and de-commissioning of the of four, 250 Horse

Power aged and existing air compressors with installations with two new

50 Horse Power air compressors to provide high-pressure compressed air

for control air, pneumatic actuation of dampers, valves and laboratories

supply air.

2006 - 2011 Dynotec, Inc. Columbus, Ohio

Mechanical Project Engineer/Manager: (Contract)

Southerly Waste Water Treatment Plant, Jackson Pike Waste Water Treatment

Plant,

S76 Sludge Thickening Improvements and Renovations,

. Administered a $60 M Contract replacing the four aged activated sludge-

thickening centrifuges with gravity thickeners. Project interchange

includes the thickeners feed pumps and its associated piping, polymer

feed system, wash water piping, instrumentation and controls, thickening

sludge wells, filtrate pumping system and odor control system. This

process will result in centralized operation that will increase

efficiency.

J209 Skimming Concentrator System Improvements,

. Oversaw a $5 M contract consisting of installation, production, startup

of new skimming concentrator and their mixing units, transfer pumps,

grinders, skimming reticulating pumps and its associated piping, variable

drive frequency units and related electrical and mechanical apparatus in

order to monitor and operate all equipment from remote location.

J210 Skimming Concentrator System Improvements,

. Administrated a $45 M Contract in order to perform installation,

production, startup, testing and commissioning of mechanical, electrical,

and fluid assemblies with the purpose of upgrading aeration system and

final clarifiers to increase its process capacity from 40 Million Gallons

per Day to 60 Million Gallons. This Project consisted of the

rehabilitation of 5 secondary clarifiers and various hydraulic and its

associated pipeline improvements, including modifications to air

throttling operation, upsizing influent pipes, providing larger flow into

aeration tanks with the installation of six new pumps, additional relief

pipes, and advance diffuser's air system improvements.

J211 Plant Wet Weather Hydraulic Improvements

. Supervised construction and modification of a $15 M Contract consisting

of upgrading capacities of effluent pump station and the disinfections

chlorine storage tanks from 100 to 150 Million Gallons per day.

Jackson Pike Waste water Treatment Plant, December 1, 2007 - June 30, 2008.

. Administrated a $2 M Contract consisting of mechanical configuration,

repairs, and assembly of two Methane Digesters for Fuel Gas, including

operation repairs, installation, production, startup, testing and

commissioning.

Southerly Wastewater treatment Plant, November 21, 2006 - November 30, 2007

. Conducting operations installation, production, startup, testing and

commissioning of mechanical assembly to be completed on two discrete

contracts consisting of Contract S65, A $51-Million Dollars Raw Sewage

Pump Building, and contract S67 A $45.8-Million Dollars Screen and Grit

Facilities Projects. These critical projects met the City of Columbus

Consent Order with the Ohio Environmental Protection Agency (EPA) by Dec

31, 2007.

S 65, Raw Sewage Pump Building.

. Supervised installation of four raw sewage pumps with capability of

displacing 400 Million Gallons of fluid a day with 1250 Horse Power

motors, operating with variable frequency drive units. It also included

installation of four mechanically cleaned bar racks system, sluice gates,

four 54-inch diameter magnetic flow meters, instrumentation and control

systems, plumbing, Five Million BTU's HVAC, and electrical systems

including an 8000 kilovolts emergency generator.

S67, Screen and Grit Facility.

. Oversaw installation of four perforated panel screens and Grit separation

units, four 25-foot diameter grit tanks with propeller/impeller and drive

units, eight-recessed centrifugal grit pumps and their associated

instrumentation and control systems. Administrated installation of

project's plumbing, installation of 87000 square feet of cooled and

conditioned space from 5 Acre (218000 square feet) between both

contracts, three Eight Million BTUs of Natural and supplemental Methane

Gas WEIL- McLAIN heating boilers units, and electrical systems including

Variable Frequency Drive and 15000 KVA MCCs. This contract also included

construction of the Odor Control Facility with control fans and

bioreactors.

2001- 2006 ABX AIR, INC. Wilmington, Ohio

Facilities Project Coordinator, Sr. Industrial Engineer, Component

Maintenance Engineer:

. Supervised and monitored planning and developing for utilization of 18

facilities and distribution hubs across North America for equipment,

materials, Building expansions and personnel to improve efficiency of

operations. Establishing work measurement programs and analyzing work

models to develop standards for labor utilization. Developing and

monitoring long-range research and development plans based on corporate

strategic objectives. Contributed to the developments of budgets and

forecasts.

. Contributed and supported the relocation and integration of DHL global

delivery Air Cargo Airline from Cincinnati, to Wilmington, Ohio.

Integrated 1900 pieces of machinery and equipment. Employed 500 new staff

to facilitate and operate 1.5 million Square feet of new sorting facility

with 7.2 miles conveyor belts. Design and outline of over 275000 square

feet of new facility and office spaces for several different departments

including Grounds Operations, Quality Assurance, Operation Training,

Ground Training, and Environmental safety.

. Analyzed repair requirements, and provided substantiation reports for the

repairs. Drafted engineering reports, memos, Developed Repair Engineering

Authorizations. Evaluated technical information from Vendors,

Manufacturers, and Regulatory Agencies.

. Collaborated with needs of other department such as maintenance planning,

scheduling, material management, maintenance programs, management, and

finance. Proceeding of the project work plan, planning the workflow,

Coordination of project meeting, project production and following up

during and after initial project accomplishment to ensure successful

project implementation.

. Accumulated savings over Twenty Five Million Dollars in work stations

locations and spaces, product sites, equipment sites, aircraft landings

areas/ fuel optimizations, preventing maintenance, procurement, and

inventory control from 2002 - 2006.

1997- 2001 Stewart-Glapat Corp. Zanesville, Ohio

Quality Assurance Manager/ Project Engineer:

. Oversee all aspects of quality control including development and

management of supplier quality program, shipping and receiving of all

incoming raw and unprocessed materials, as well as pre-fabricated

materials including electrical components.

. Supervised project estimation, organization, planning, and managing.

Improved implementation, procedure modification, and cost control.

Responsible for in-process and final inspection of adjustoveyors

(extendible cantilever conveyors as well as fully automated sorting

system).

. Responsible for employee safety program. Organized and produced detail

product's welding route, electrical, subassembly, and final assembly as

well as final checklist record keeping for future employees' training and

files. Data input and analysis and engineering blueprints change order.

. Oversaw activities of manufacturing employees' production as well as

productivity and employee safety. Made cold calls and follow-up visits

to retail vendors, as well as vendor representatives of several major

corporations.

. Improved the Quality Control program from 50% (marginal) to 90%

(outstanding) with a major corporate worldwide delivery service client.

EDUCATION & MEMBERSHIPS

Masters of Science: Industrial & Manufacturing Systems Engineering,

(Engineering Business Management), Ohio University.

Bachelor of Science: Mechanical Engineering. Ohio University.

CDT Certification: Construction Documentation Technology. Construction

Standards Institute (CSI).

Six Sigma Certification: ABX Air, Inc.

OSHA Certification: Plant Safety.

HVAC Certification: Heating, Ventilation, Air Conditioning, and

Refrigeration. TCJC.

American Society of Heating, Refrigeration and Air Conditioning Engineers,

Inc. (ASHRAE).

National Society of Professional Engineers (NSPE).

AWARDS

Time Management Commendation, Metro Corporation Hotels, Dallas-Ft. Worth,

Texas, (1989 -90).

Basic Sanitation Commendation, Lowe's Anatole Hotel, Dallas Texas, (1984-

85).

Supervisory Development Award, Marriott Hotel, Dallas (DFW), Texas, (1982-

83)

Who's who among Students in American Universities and Colleges, 1980-81.

International Youth in Achievements, 1980-81.



Contact this candidate