EDUCATION:
NORTHEASTERN UNIVERSITY
Boston, MA
PORTER AND CHESTER INSTITUTE
Canton, MA
Architectural and Engineering CADD Technology
**** ***** ** "hands-on" training in Computer Aided Drafting and Design
Revit
CADD FUNDMENTALS
? Layers / Annotation / Dimensioning /
Schedules
? Image Manipulation: X-References / View
Ports
? Model Space / Paper Space / Sheet Files
ARCHITECTURAL
? Floor Plans / Elevations / Cross Sections
? Stair Layouts / Perspectives
? Green Buildings / Sustainable Building /
LEED
STRUCTURAL
? Framing: Foundations / Walls / Roofs
? Building Codes / Material Lists / Detailing
? Steel: Columns / Beams / O.W.S.J
? Concrete: Pre-Cast / Cast in Place
? Imported and Converted AutoCAD Files
? BIM (Building Information Modeling)
? Rendered Photo Realistic Images / Design Options
? Created Commercial and Residential 3D Projects
M.E.P.
? Plumbing: Layout / Sizing / Isometric
? Electrical: Lighting Calculations and Layout / Power
? HVAC: Hydronic Heating / Radiant Heating / Rigid Duct
CIVIL
? Topographic: Horizontal Curves / Bearings and Distances
? Site: Parking and Drainage / Slopes and Grading
? Landscape: Plants / Trees / Parking Lot Lighting
? Utilities: Septic / Electric / Water /Gas
EMPLOYMENT HISTORY
Toys "R" Us/Babies "R" Us, Dedham, MA
01/2011 - 10/2013
Department Manager``
. Analyze daily metrics to increase sales at the department level
. Merchandise products for the most efficient sales
. Manage front end cash transactions and decide on price adjustments to
suit customer needs
. Work toward satisfied customer surveys and buyer protection services
to best serve consumer needs
. Mentor co-workers to increase sales and productivity
. Delegated work load for store re-model night crew as directed by store
manager
CVS/Pharmacy, Millis, MA
04/2009 - 06/2011
Shift Supervisor
. Processed truck deliveries and vendor orders and decided on position
of 7-9 employees for most effective use of skills and time.
. Maintained store aisles and bulk stock
. Constructed seasonal isles and sale items for maximum sales
John Moriarty & Associates Construction, Winchester, MA
05/2008 - 02/2009
Assistant Superintendent, Longwood Center
. Supervised demolition of building on site and the cut and cap of
utilities
. Managed distribution of plans and specifications
. Participated in daily progress meetings taking minutes and site photos
to post on job website
. Coordinated subcontractor schedules and manpower resolving daily
issues and conflicts
. Worked with city to get permits for work, sidewalk closings, and
cutting and capping of utilities
. Compared architectural and structural drawings for conflicts relaying
information to architect for possible missing contract work
. Used architectural and structural drawings to compile take-offs
. Estimated linear footage needed for electrical wiring on Longwood
Center project.
. Provided estimate based on take-offs and compared with sub-contractor
bids
. Involved in pre-construction awards, proposals, submittals
. Assisted project estimator in analyzing contract documents vs. sub-
contractor bids
William A. Berry & Son, Inc. Construction, Danvers, MA
01/2002 -04/2007
Field Engineer/Project Coordinator/ Assistant Superintendent
. Worked on three sites: Brigham & Women's Hospital, Center for Life
Sciences, Kendall Square Building "B"
. Updated and facilitated Requests for Information and entered drawing
submittals into Timberline
. Processed subcontractor Extra Work Orders and Time & Material slips
using Vela
. Managed payroll allocating hours to appropriate jobs and disbursing
checks for field operations
. Maintained all electronic and paper files for field office creating
site specific Excel and Word templates
. Project managed multiple contained renovations within the active
Brigham and Women's Hospital
. Reviewed and modified steel and structural drawings for quality
control as needed for architect and engineer
. Surveyed elevations for below grade footings
. Managed field office for 13 superintendents directing work flow to
union foreman.
. Communicated activities, facilitated work requests from client to
field, and coordinated assignments between field personnel and office
personnel
. Scheduled hospital shutdowns and night work
. Controlled punch-list correction team including union steel workers,
inspectors, laborers, and carpenters for C of O permitting
. Tracked steel installation above and below grade addressing issues on
beams that were not installed
. Verified structural steel shaft openings for elevation, vertical
alignment, and width
. Completed structural steel punch lists as required by engineer and
inspector
. Supervised steel, rebar, and concrete construction above grade ensure
quality control
. Facilitated rebar and post tension cable inspections and sign offs
prior to concrete pour
. Oversaw below grade rebar and post tension cable install, facilitating
post tension pulls after concrete pour
. Located and marked locations for dowel bar inserts for drill and epoxy
as needed
. Coordinated building inspections and sign offs as well as OSHA site
safety meetings [pic]