Gary J. Grabowski
P.O. Box ******
Tulsa, OK ****5
**************@*****.***
Objective:
To obtain a position with a respectable, and fast growing company with opportunity for
advancement.
Education:
Snead State Community College Boaz, Alabama
Completed AAS Airframe Technology 06-14-2012
Completed ACT ready to work program. 03-21-2013
Enterprise/ Ozark Community College
Alabama Aviation Center (branch of EOCC) Albertville, Alabama
Airframe Certificate 12-15-2010
License:
Obtained FAA Airframe License 05-21-2011
Experience:
Newman Technologies Albertville, Alabama
Assembly Associate/ Inspector 06/2013 to present
• Inspecting parts to meet customers specifications.
• Ensuring current orders are met and finished on time.
• Assisting other associates during down-time.
• Ensuring the proper rotation with line associates, are being met.
Lowe's Guntersville, Alabama
Commercial Service Associate/ Loader 01/2008 to 08/2012
• Ensured the pulling of delivery, commercial, & customer orders.
• Controlled the rotation of product by using First-In First-Out method.
• Assisted associates in other departments as needed.
• Operator of various powered equipment.
Pinnacle Mfg. Boaz, Alabama
Welder/ Plasma Table Operator 03/2007 to 12/2007
• Ensured the proper layout of materials needed, prior to welding and assembly.
• Use computer numerical control plasma table to cut out parts as needed on a day-by-
day order basis.
• Welded with MIG welders, automatic guided, and free handed.
• Operator of various powered equipment and overhead cranes.
Anson Restaurant Group Boaz, Alabama
Maintenance 07/2005 to 02/2008
• Ensured the proper cleaning and maintenance of all restaurant equipment.
• Stocked, rotated product, & confirmed all deliveries.
• Performed all other preventive maintenance duties on a scheduled basis.
T. S. Tech Boaz, Alabama
Material Service Handler/ Assembly 05/2002 to 5/2006
• Ensured the proper replacement and assignments of all parts, tools, safety equipment,
and chemicals for the entire plant.
• Inspected, confirmed, and logged all internal and vendor scrap, as well as line parts to
be verified to be used
• Collaborated with management to implement cost effective programs and ideas.
• Aided with a developed team to support just-in-time delivery by vendors, to suppliers.
• Supplied assembly lines with the necessary parts needed to fill their orders.