IRFAN FAROOQ E: ************@*******.***
M: 647-***-****
A: 1380 Rimon st, Mississauga, L5V1T9
PROFESSIONAL PROFILE
• A seasoned Electrical professional with over 13 years in installation/Testing and commissioning
of (AC/DC) power networks for telecommunication services(BTS, BSC, MSC and media gateway)
• Expertise in installation/maintenance of UPS, batteries, DC power, fuse panel and circuit-breakers
• Hand on experience in Generators, Fuel Systems/ Monitoring an solar entities
• Conducting site power audits and load requirements
• Knowledge of TIA/EIA and BICSI standards
• Excellent inspection experience of site acceptance protocols (PAT, FAT) and methods of installing
electrical equipment
• Hands on experience with Testing/Troubleshooting and measuring instruments
• Installation of cable ladder and cable Tray
• Expertise in schematic and work packages
• Capable of leading cross-functional teams while effectively influencing team members to create
a positive climate in which they stay motivated to complete required tasks for special initiatives or
major projects
• Self-starter with an ability to handle and prioritize multiple tasks in a fast paced environment
• Advanced computer skills in MS office - MS Word, Excel, Power Point and MS Project
PROFESSIONAL EXPERIENCE
Power Specialist (Site Design & Implementation Department) 2007 – 2014
Telenor Pakistan, (Norwegian multinational telecommunications)
Accomplishments
• Successfully installed IPS (Integrated Power System) for 2500 BTS sites instead of three AC
cabinets (Main Power supply, Auto transfer switch and power distribution box)
• Deployed solar system at 37 off-grid USF sites
• Installed Generator monitoring controlling indigenously and executed on 1100 BTS sites and saved
CAD $ 18 M/year, which reduced CO2 emission.
• Installed FCU (Forced cooling unit) at BTS sits and linked it with the cooling system to manage the
BTS temperature, facilitated an OPEX electricity saving of 400 kwh units per month means 30%
saving of electricity and 76% diesel generator run time reduction, and reduced annual diesel fuel
consumption by approximately 8300 liters per site
Assistant Project Manager 2004 – 2007
ITEL, Islamabad, Pakistan
• Technical support to sales/field teams as well as to customers for proper operation of PIM Master,
Optical Power Meter, Light Source and OTDR.
• Evaluated of electrical (AC/ DC Power System) for WARID and Wi-MAX Telecom project
• Proposed generators & HVAC designs for Core and Access Locations
• Provided technical support to regional team for the resolution of electrical and mechanical issues.
Irfan Farooq M: (647) 534–2989 E: ************@*******.*** Page 2
• Conducted the nationwide load calculation and Power Audits on monthly basis for the AC/ DC Power
System to ensure smooth operations of Network (Core and BTS Sites)
• Performed corrective maintenance in the north region
• Configured the Nationwide Core Sites DC Power Systems audit, which had signification impact on
batteries health and root cause analysis of batteries premature reduction
Telecom Project Engineer 2001 – 2004
Exponent Engineers, Pakistan
• Tested of power infrastructure for telecommunication and submitted evaluation report
• Coordinated with site engineers and performed tests and installations of power systems and
associated devices.
• Conducted site surveys for power audits.
EDUCATION
Engineering Management 2012
Bachelor of Electrical and Electronics
2000
PROFESSIONAL DEVELOPMENT
• Workplace Essentials for Engineers 2014
ACCES Employment Mississauga, CA
• Safety & Leadership Training 2014
TWI Technology Engineering, Pakistan
• Management Training 2012
I2C, Pakistan
• Installation of Solar cell 2010
DWP Group, Lahore, Pakistan
• Rectifier Power System Training 2010
Eltek Valere
• Electrostatic Discharge & Electromagnetic Compatibility 2009
MAXTRAIN INTERNATIONAL
• OHSAS 18001:2007 2008
One Tree Hill, Islamabad, Pakistan.
• Installation, Commissioning/Operations of Integrated Power System
2008
Saltec Powerlink, Islamabad, Pakistan.
• Generator Installation, Commissioning and Operational 2007
Denyo, Singapore.