* + years experience in the Construction Industry in Power with

Bechtel Corporation and Capital Improvement Projects with the

City of Fort Worth. I am passionate about safety, quality, schedule

adherence and customer satisfaction with a record of improving

efficiency, resourcefulness, productivity, and profitability through

automation and process improvements. My outstanding

interpersonal, motivational, cross discipline coordination and

presentation skills permit me to be extremely flexible and easily

adaptable to a multitude of challenging assignments.

Education

2002 – 2007 University of Arkansas at Little Rock Little Rock, Arkansas

Bachelor of Science Degree in Construction Management

2002 – 2006 University of Arkansas at Little Rock Little Rock, Arkansas

Associate of Science Degree in Electronics and Computer Engineering Technology

2005 – 2006 City of Fort Worth Forth Worth, Texas

Co operative (Rotation in Survey, Soils/Concrete Lab, Field Inspection, As built, Wastewater treatment plant: Instrument &

Controls (I&C) and Mechanical (plant component) groups)

QUALIFICATIONS/Certifications/Professional development/memberships

Society of Piping and Engineering Design (SPED) Level 1

PPD Certification (in progress)

Primevera P6 (Oracle University)

Project Management Fundamentals (Second Edition) New

Horizons

Revit Architecture Fundamentals (LEDET Training)

LEDET

Mechanical/Piping Workshop Bechtel University

Maxi bolt, Hilti Anchors, GSSI Scanner Trained

Proficient in Maximo, Passport & NAMs

CANstruction Lead at Watt’s Bar Project 2013 – “Winner of

Competition”

Professional experience

03/2013 – Present Bechtel Construction Watts Bar Unit 2 Completion TVA

Mechanical Field Engineer (FE) for installation and inspection of ASME (Section III and Section XI) and Non ASME

piping, rotating equipment alignment, pipe supports, instrumentation and controls systems in the completion of Watts Bar

Unit 2 for TVA in Spring City, TN.

Selected by Senior Management to perform “constructability walkdowns” to provide constructability and correctness

completeness on new piping work orders released by the Planning group.

Member of the “Project Mechanical Readiness Team” performing initial & final constructability walkdown of (legacy and new)

T 4 work order packages with craft to identify issues (predecessors, successors, material restraints, specialty tools, proposed

schedule durations) and provide solutions. Reviewed work orders having low float, schedule priority and systems/project system

waterfall work orders. Worked closely with schedulers to verify and adjust schedule work order activity logic ties.

Managed work orders utilizing client’s MAXIMO and BSL system. Coordination with Design engineering through the engineering

change documentation process, worked with Authorized Nuclear Inspectors for material separation and work order hold points,

Quality Control, Superintendents, Foremen and craft to support/manage field work activities by performing critical technical

inspections of on going work, tracked man hours completed throughout the duration of work scope activities and performed work

order closure activities.

SWORD – System Work Order Department – Driven by project system priorities, performed scope estimation on existing and new

work orders and performed material take offs in an effort to re align the overall project schedule.

Gap Analysis Group – worked with the gap group to ensure that all Engineering Scope Packages drawings are captured in a work

order by utilizing MAXIMO & BSL in the initial planning review.

Materials Management Group – Maintained the project material tracker for all materials ordered for work orders, and processed

transmittals for material transfers.

02/2009 – 02/2013 Bechtel Construction Turkey Point EPU Project

Mechanical/Piping Field Engineer (FE) for installation and inspection of ASME B31.1 piping, pipe supports, heat

exchangers, instrumentation and controls systems in the completion of FPL/NextEra Turkey Point EPU Project “2013

Nuclear Project of the Year”.

Lead Field Engineer in charge of assisting field procurement in the inspection, resolution of material issues on mechanical and

civil materials (worked closely with suppliers to resolve design issues)

Engineering Change (EC) Lead Field Engineer over the Control Room Emergency Ventilation System (CREVS) & Spent Fuel Pool

(SFP) Projects scopes

Selected by Senior Management to support online pre outage hanger installation (Maxi/Hilti anchor bolts, steel fabrication and

component installation) for all hangers (200+) in the 4R27 outage scope.

Night shift Field Engineer for the Moisture Separator Reheater (MSR) team.

Provided engineering assistance to Superintendents during pre planning and implementation stages of the project

Planned first work package on the EPU Project for the Leading Edge Flow Meter (LEFM), worked closely with the client to

troubleshoot and set the expectations for the packages to follow.

Implemented initial Lessons Learned system/platform at Turkey Point EPU Project

Worked closely with supervision and project controls to prepare and update short term schedules.

Conducted field quantity take offs from “Issued For Construction” drawings

Coordinated Pre Outage Equipment Testing with on site group Ames and FPL on components that were received at the

warehouse to adhere with project schedule needs.

Evaluated engineering design to resolve issues with engineering and/or fabricator/vendor.

Prepared walk down packages prior to Bechtel plant outages for the implementation of design in containment areas.

Design/Construction Team member which consisted of the station representatives from Maintenance, Project Manager for Scope,

Responsible Mechanical Engineer, and Responsible Civil Engineer for the TPCW – (Turbine Plant Cooling Water System) for

constructability and design input to the vendor based on plant maintenance activities and available space for implementation.

Performed Initial Assessments and Constructability reviews with the client, engineers, Vendors and Bechtel supervision on

proposed Engineering Change Packages/Plant Change Modifications.

Worked closely with Bechtel procurement, Expeditors and the Client procurement group to purchase materials and perform

technical bid evaluations to ensure delivery dates supported the project’s schedule

Participated in P&ID System walkdowns with the client, system engineers and design engineers for final system turnover;

identified open items and discrepancies, monitored completion of open items on the punch list and identified systems/components

to be turned over on P&IDs.

Performed In Service Leak Check inspections on the stations Post Maintenance Testing documentation to ensure systems meet

design requirements

Developed a Project Management tracking tool using Microsoft Excel called “Scope Management Spreadsheet” that was utilized

on the CREVS (Control Room Emergency Ventilation System) and SFP (Spent Fuel Pool System) projects this concept was

implemented and used by the Field Engineering Dept.

Monitored the Client’s T Week schedule to ensure that the associated work packages and material aligned with the work schedule

Prepared and Finalized the Service Requisition for the potential “Sub Contractor” solicited for the “Contingency Air Cooled

Chiller” in support of the Spent Fuel Pool project. Point of contact and worked closely with the Contracts, Engineering and all

groups supporting this effort

Created Project Daily Reports to report status to management

Partnered with the Commercial Grade Dedication Engineers at the FPL’s Corporate Procurement Office to upgrade Augmented

Quality materials to Safety Related material

Quality Role – Served as the Work Package Close out Coordinator leading a team of 3 for the 3R26 Outage, reviewed all work

packages to process for Turnover and worked with the Welding Department to close out weld records.

Partnered with the Contract Department for the Control Room Emergency Ventilation – Filtration Unit (PMT Contract) on duct

work required for the modification; contracts affecting work, to request information and schedule and communicate design issues

Performed pre job briefings highlighting safety/hazard concerns, managed work order execution, Liaison with Design

Engineering, Quality Control, Superintendents, Foremen and craft to support field work activities by performing inspections of on

going work and close out phase of the project work packages

05/2008 – 01/2009 Bechtel Construction Fossil Division Sandow Unit 5

Piping Field Engineer (FE) for installation and inspection of ASME B31.1 piping and pipe supports in the completion of

Sandow Unit 5, Rockdale Texas.

Worked with TeamWorks (equipment and material tracking system) to verify accuracy of data from engineering, also worked with

other Bechtel systems Bechtel Procurement System (BPS), InfoWorks & 3DM

Worked with procurement to prioritize, expedite and control material deliveries to the site

Prepared Field Material Requisitions for permanent and temporary materials

Executed field quantity take offs for construction drawings

Provided technical assistance to craft

Performed inspections and documentation on assigned systems in working progress on a continuing basis to ensure quality and

conformance to project specifications are met and also created punchlist items to track working systems utilizing Punch Item in

TeamWorks.

Assisted in the execution of piping work packaging program

Participated in P&ID System walkdowns with the client and start up engineers

Attended punchlist and safety meetings as the piping rep.

Prepared and organized reports for Construction to Startup system turnover

Gained experience/understanding with Bechtel Program 3DM (shadowed Plant Design Engineer while visited site)

Coordinated with design engineering and vendors to resolve issues utilizing (RFI’s, FCR’s, Backcharges etc.)

Supported boiler Hydro test team for monitoring pump pressure gauge

Responsible Field Engineer for the Feedwater System and Bag House