ROBERT FREYTAG
Gresham, OR, ***30
Home: 503-***-****
Cell: 503-***-****
********@********.***
PROFESSIONAL SUMMARY
An experienced Electrical Engineering Technician with more than 40 years of substation
design experience. Have exceptional MicroStation knowledge, skills and abilities.
SKILLS
• MicroStation V8i
• ProjectWise File Management
• MicroSoft Office 2010 Word, Excel, Outlook
• Troubleshooting
• Visualization
• Coordination
EXPERIENCE
Designer III Jan 2000 - Jun 2014
POWER Engineers Inc. Portland, OR
• Designed electrical control and relay systems including SCADA, SER, and RAS
for power substations including all single-line, three-line, relay schematics, rack
layout, wiring diagrams and associated documents.
• Designed Substation Yard Layouts for 69KV through 500KV substations.
• Trained Drafters in the use of MicroStation CADD and Substation Design
Principles.
Designer III Jan 1998 - Dec 1999
TDEC Portland, OR
• Participated in the design of converting multiple hydroelectric generators to
synchronous condensers. Designed relaying cabinets for valve control, PLC
cabinet. Acted as CAD lead for all designers and drafters.
• Designed the 500kV yard bus, conduit and grounding for four new 500kV bays.
Acted as CAD lead for all designers and drafters to coordinate the drawing
packages. Checked schematics and wiring diagrams for accuracy and
completeness.
• Added control and relaying for two 230kV breakers, including all single-line,
three-line, relay schematics, rack layouts and wiring diagrams and associated
documents.
Designer III Apr 1995 to Dec 1996
Elcon Associates, Portland, OR
• Develop Automated Wiring Procedures to create Wiring Diagrams based on
intelligent Schematics and Rack Layouts utilizing Intergraph's WireWorks
software.
• Designed Protection and Control systems for High Voltage Substations
• Managed CAD Drafters
Lead Electrical Engineering Technician Mar 1967 - Mar 1995
Bonneville Power Administration Portland, OR
• Designed electrical control and relay systems, including all single-line, three-line,
relay schematics, rack layout, wiring diagrams and associated documents for
power substations.
• Setup the Electrical Engineering Software to work in BPA’s environment.
• Designed Substation Yard Layouts for 115KV through 500KV substations.
• Setup MicroStation CADD including Cell Libraries, Macros, and Utilities to work
in BPA’s environment.
EDUCATION
Portland State University Portland, OR
Engineering and related courses
Intergraph Huntsville, AL
MicroStation
MicroStation 3D
MicroStation Development Language
Electrical Engineering Software (WireWorks)