Robert Lowe
**** * ******* **, ***********, TN **421 423-***-**** (
*******@*****.***
OPERATIONS Management
Plant Operations / CPI /Supply Chain / General Management / Cost Reduction
/ P&L / Systems
Lean / Productivity / ISO / New Products / Labor / TQM / Reorganization /
EPA / Team Building
I have a strong track record of accomplishment and wide-ranging
manufacturing management experience in electronics, fabricated metal, wood
products, plastics and oilfield equipment. Skilled in problem-solving,
improving operating efficiencies, controlling costs and development/launch
of new products. I can quickly contribute by:
< Reengineering processes to reduce labor and operating costs
< Implementing Lean Manufacturing to improve plant performance
< Managing new product development to drive sales and profits
< Leading cross-functional teams to increase customer satisfaction
I have been described as a strong manager who leads by example and
encourages top performance by creating a positive and team-oriented work
environment. Hardworking, high energy level, competitive, used to long
hours.
Selected Accomplishments
Kaizen Event $600k. Amazon Fulfillment Center's inbound receiving dock was
not 5S'd for FIFO of vendor freight. Organized and led a Kaizen team to
achieve FIFO of vendor freight including the removed of 30' of conveyor on
the sort line resulting in over $600,000 in labor savings by reducing dock
labor by a total of 12 associates over 4 shifts.
OT reduction resulting in over $560K in savings. Lectrus' non-linear demand
required excessive OT to meet Customer deliveries. Implemented a 6-day
work schedule to eliminate 32% overtime in the electrical department.
Cut on-site labor costs $1M. Jacobs was facing unrealistic demand for
skilled labor on construction of a new sulfur recovery plant in Canada.
Surveyed 35 modular piping fabricators as best cost-saving alternative.
Selected and contracted four suppliers to build 120 modularized skids,
eliminating significant labor costs at job site.
Reduced operating costs $250K. Obrist Americas lost a major contract and
needed to reduce direct labor costs. As Plant Manager, assembled cross-
functional team to realign production operations and scheduling. Post-
implementation of 12 major changes, labor and operating costs were cut 20%.
Introduced Lean Manufacturing to cut scrap & rework 12%. EcoQuest had worn-
out equipment and outdated manufacturing methods. Implemented Lean concepts
in a 3-step plan to revitalize plant and production. After upgrades,
employee morale skyrocketed, scrap & rework were reduced and quality issues
dropped 40%.
Streamlined new product development. EcoQuest marketing wanted a stream of
new products. Developed a new system to speed-up design, pilot, prototyping
and rapid production startup. Installed a dashboard tool and established
gates to control process. Introduced 9 new product lines in 2 years to
increase sales 30%.
Reorganized packaging operation to save $350K. Competition was putting
intense pressure on Portola gross margins. As GM, teamed-up with
engineering and maintenance to move secondary equipment downstream and
eliminate two assembly areas. Created innovative machine work centers and
cut 28 direct labor positions.
Improved customer satisfaction with TQM. Annual customer satisfaction
surveys at Portola showed room for improvement. Deployed Lean methods,
Kaizen, Kanban, 5S and elements of Toyota Production System to map and
measure steady quality year-to-year gains. Attained ISO certification.
Improved quality rating to record 90%.
Career History
Inbound Manager, Amazon Fulfillment,
2011-Current.
Manager for the Inbound Receiving area and Dock in a 1,000,000 square foot
sortable distribution center with responsibility for over 250 warehouse
associates. Functions include: Receive Dock, Sortation Lines, Receive,
Prep, Replenishment, Non-Conforming product, Customer Returns, ISS and
Problem Solving. Led entire FC during peak week 2011 by receiving over
400,000 items in a 10-hour shift. Exceptional leader providing motivation,
coaching, associate barrier removal and attainment of daily plan in a Safe,
Customer Centric Experience environment.
Plant Manager, Lectrus Corporation,
2010-2011
$48M metal fabrication and electrical integration supplier of custom
modular buildings. Managed plant operations including manufacturing,
maintenance, purchasing, shipping, receiving, scheduling and warehousing.
Project Procurement Manager, Jacobs Engineering,
2008-2010.
Responsible for oilfield and process industry project procurement
activities including purchasing, expediting, scheduling, cost control and
quality assurance.
Plant Manager, Obrist Americas,
2007-2008.
$60M plastics injection molding operation. Managed plant operations
including engineering, maintenance, purchasing, shipping, scheduling,
customer service and human resources.
Director of Manufacturing, EcoQuest International,
2004-2007.
Managed three plants in manufacture of air and water purification
equipment; wood fabrication, metal stamping and electronic assembly and
final assembly.
GM/Plant Manager, Portola Packaging,
1996-2004.
$36M plastic injection molding division of $250M firm. Responsible for
plant operations with manufacturing, engineering and maintenance. Full P&L
responsibility.
Earlier: GM with Columbus Electric Manufacturing (electronic controls),
Materials Manager with Falcon Products (commercial furniture) and several
manufacturing management positions with Texas Instruments.
Education: BSBA - Industrial Management 1980
Personal: I lead a very active lifestyle and enjoy skiing boating, scuba
diving and riding my motorcycle.