Richard Sean Wright

**** **** **** **** #****

Galveston, TX 77554

606-***-****

acffjh@r.postjobfree.com

Objective:

A position utilizing my Instrumentation Supervision/I&E Inspection in the

process instrumentation Electrical and controls field .

Work Experience:

Over 20 years experience troubleshooting process control systems and motor

controls. Very experienced with Distributed Control Systems, Honeywell TDC-

3000, Honeywell FSC, Experion, Triconix, Bailey Net 90, Emerson Delta-V,

Ovation,Fieldbus,Modbus,Profibus,ABB,GE Mark-V, GE Mark VI. Woodward.

Experienced with PLC'S Siemens, Allen Bradley. Skilled in installation and

testing of Safety Instrument Systems .Proven capabilities verifying

accuracy of mass liquid flow meters utilizing volumetric provers .

Experienced in various analytical sample systems including Ametek,

Servomex, Omni, Total Flow, Thermo Scientific, Rosemount,YZ Industries,

Applied Automation .Experienced with Cems, Nox, and GC Systems. Skilled in

supervising people of various skill levels . Trained in Operations of GE LM-

2500 gas turbines . Trained and Certified in Smart Plant Instrumentation

(In-Tools). Experienced and Certified in Training Instrument Technician's

for Meridium Calibration Management for Fluke 744 Data Logging. Experienced

in planning and scheduling using Packet Pro, and SAP .

NCCER Certified Instrument Technician # 4948848

OSHA 10 Certified

Current TWIC card to expire 2018

Work History:

OCT. 13 - Present

TEAM Management and Consulting, BP Terminal Carteret NJ. I&E Supervisor /

Inspector over upgrade of loading terminal with Allen Bradley / Fieldbus

automation system and Security camera system from Hurricane Sandy damage.

Supervisor/Inspector over Forest Electric electrical contractor and

Rockwell automation contractor over installation automation control system.

Supervised / Inspected security system including installation of Backbone

all FIC's and camera's from front gate through out fuel loading terminal

all the way to barge loading dock. Inspected all electrical

installation's along with commissioning of instrument loop check out as a

BP job reresenitive role to insure reliable terminal I&E functionality

April 13 - Nov.13

STS Consulting Texstar Midstream Pettus Tx . I&E Supervisor/ Inspector

over construction of cryogenic Inlet gas facility I&E construction.

Supervisor / Inspector over MMR electrical contractor in construction and

installation over installation of electrical power distribution

installation. Supervisor / Inspector over Prime Controls with control

wiring along with instrumentation installation and loop commissioning as a

Texstar Midstream Job representative role to insure reliable plant I&E

functionality.

Feb.13 - April 13

Houston Controls, Holly Frontier Refining, El Dorado KS. I & C Forman .

Supervised up to 10 instrument technicians in refinery turn around .

Performed supervision of SIS check out in Crude and Sulfur units insuring

I&E safety system functionality along with normal turn around I&E

maintenance support .

Jan.13 - Feb. 13

Meitec Inc., Enterprise Products, Houston, TX . I & C Forman .

Supervised up to 20 instrument technicians on commissioning and start-up of

LPG loading facility . Led in loop package commissioning and control of

all plant instrumentation loop's handling and tracking to insure all are

accounted for and sold off to Enterprise job representative. Supervisor

over instrument technicians performing loop check out on start-up of unit

. Assisted Enterprise Products in QA/QC and Inspection to insure a safe

functional start up of plant .

Dec. 12 - Jan 13

CBM Inc., CVR Energy, Coffeyville, KS . I & C Foreman . Supervised up to 16

instrument technicians on commissioning and start-up of ammonia plant .

Supervised SIS functionality loop check out and troubleshooting of all

instrumentation in plant. Supervised and instructed all instrument

technicians to insure unit start-up safely and functioning correctly.

Worked directly with plant maintenance supervisor in support of the whole

unit commissioning and start up .

Sept. 12 - Dec. 12

Houston Controls, ConocoPhillips, Borger, Tx. I & C Foreman . Supervised up

to 20 people on gas oil hydrogen desulfurization unit shut down and start

up . Supervised in bringing plant down for maintenance turnaround on whole

hydrogen desulphurization plant . Directed in performing day to day

supervision and instruction to I & C technician's and assisted with plant

maintenance support with pulling and reinstalling of control

instrumentation. Supervised instrument technicians in safe start up of the

plant after complete rebuild.

July 12 - Sept. 12

Austin Industrial, PCS Nitrogen, Augusta, GA . I&C Technician Performed

turnaround maintenance of compressor's removing and reinstalling Bentley

Nevada vibration monitoring systems. Including graphing and resetting of

probes on compressor's .

April 12 - July 12

Edge Dynamic Solutions, CAMS / Waterside Power, Stamford CT. I&C

Technician / Combustion Turbine Technician, Performed day to day operations

of 66 MW power plant. Performed I&C maintenance for plant along with

operations of 3 LM-2500 peeker units . Was responsible for starting units

when dispatched and was the soul person operating units when dispatched

for service. Responsible for day to day I&C PM's and Maintenance in plant .

Jan 12 - April 12

Brenderson, Tesoro Refining, Martinez, Ca . Instrument Technician .

Performed SIS verification and check out . Performed CIP testing and

calibration of various instrumentation for turnaround. Performed start-up

of several units after shut down was completed.

OCT 11 - Nov 11

Houston Controls, ConocoPhillips, Ponca City Ok. Lead Instrument

Technician, Lead Technician for turnaround. Shut down and start-up of Wet

Gas compressor and Main Air Blower for FCC . Lead technician working

directly with ConocoPhillips for SIS checkout support and verify of

instrumentation.

May 11-Oct 11

MKD Electrical, ExxonMobil, Chicago, IL. I & C Technician. Performed day

to day maintenance on plant instrumentation and low voltage electrical

controls.Performed Start-up and Commissioning on new Instrumentation

installed.

March 11-April 11

Pacific Technical Resources, Calpine Energy, Needles Ca .I & C

Technician. Performed technical Support for new installation's during

outage of 630 megawatt combined cycle power plant. Performed normal

maintenance outage support .

October 10- Feb. 11

TDS, Basin Dry Fork Station, Gillette WY. Startup I & C Technician . Start

- up and commissioning of B & W Boiler and 430 megawatt Mitsubishi

Generator. Performed loop checkout of Ovation DCS along with various

Filedbus instrumentation.

July 10-October 10

Mills Electric, US Oil, Tacoma WA . General Foreman . Supervised and

commissioned startup of Bailey Net 90 DCS . Cut over 10,000+ loops for new

central control room .Performed Shut down and Start-up of refinery after

work was completed.

April 10-June 10

GMHR, Tesoro Refining, Bismarck ND. Lead Instrument Technician, Lead

Technician over shut down and start-up . Responsible for SIS check out of

Alky unit . Night Lead technician working directly with Tesoro for

maintenance support and verify of new instrumentation.

May 08-Mar 10

SGF Global, Marathon Oil, Findley OH. Instrumentation Specialist for

Meridium Calibration Manager, Tested and trained I & C technicians on

calibration data logging software used with Fluke 744 multifunction process

meters.

Dec. 07-May 08

Del Tech, Citgo Refining, Lemont IL. I&C Technician, Performed day to day

maintenance on plant instrumentation and low voltage electrical

controls.Performed Start-up and Commissioning on new Instrumentation

installed.

Aug. 07-Dec. 07

Headway, Mackinaw Power, Sandersville GA . I&C Technician, Analytical

Technician, Combustion Technician on 4 GE 7FA Turbine's Performed day to

day operations. I&C maintenance along with maintaining CEMS systems and

assisted in Operation's support of plant .

June 07-Aug. 07

ICS, Enterprise Products, Opal WY. I & C Supervisor, Supervised Honeywell

TDC 3000 installation . Performed Commissioning, Loop checks and Start-Up

of Cryogenic Gas Facility .

May 07-June 07

Omega Energy, Enterprise Products, Farson WY I&C Technician, Commissioned,

Loop Checked and Performed Start-Up on Solar TITAN Combustion Turbines for

Gas Pipeline Facility.

April 07-May 07

Caliper, Consolidated Edison, New York NY, I & C Technician, Performed

Commissioning and Start-Up of instrumentation on steam boilers for steam

supply to the City of New York.

Nov. 06-April 07

Instrument and Electrical Specialties, FMC Chemicals, Pasadena TX Performed

day to day maintenance on I & C equipment along with Analytical

maintenance including CEMS Systems.

April 05-Nov. 06

South Texas Coatings & Sealants, Houston TX, Field Services, Supervisor

over a crew of 10-15 employees . Performed supervision and installation of

industrial coatings and sealants .

March 05-April 05

ISC, Dow Chemicals, Seadrift TX, I & C technician, Performed

instrumentation maintenance on reactors Performed shutdown and start-up of

chemical manufacturing facility.

Jan. 04-Feb, 05

JM Davidson, Weatherford TX, I&C Technician, Performed construction in

expansion of gas compressor station. Forman and Start-Up Lead Man to

bringing compressor station on-line.

Dec. 04-Jan. 04

Think Energy Group, Mid America Power, Sioux City IA, I & C Technician and

Start up Technician. Performed outage on LM-6000 Turbine's .Degassed

generators and calibrated control systems.

May 02-Nov. 04

Gulf Coast Valves, Outside Instrument Sales and Field Service Technician.

Performed industrial valve sales and supported installation on offshore oil

platforms.

April 02-May 02

American Instruments, Power New Mexico, Lordsberg NM, I & C

Supervisor.Supervised Start-up of GE LM-6000 turbines. Loop check out and

commissioning of turbines.

Feb. 02-April 02

American Instruments, Chevron Refining, El Paso TX, I&E Lead for shut down.

Performed Start-up of refinery and supervised new Ametek CEMS analyzer

installation and check out.

Nov. 01-Feb. 02

Amber Electrical & Instrumentation, Crown Petroleum, Pasadena TX, Board

Operator for E.S.D. Checkout of TDC-3000 . Verified and commissioned

shutdown system for refinery control system.

Oct. 01-Nov. 01

Triad Electrical & Controls, Lyondell-Basell, Pasadena TX, Instrument

technician for shut-down, Performed Loop check out and start-up on loop

reactor I&C Start-up Technician.

June 01-Oct. 01

Bay Ltd., Valero Refining, Texas City, TX Maintenance I & E Technician,

Performed day to day Instrumentation maintenance and low voltage electrical

maintenance.

Feb. 01-June 01

J.E. Merit, Solvay Polymers, Deer Park, TX Maintenance I & E Technician,

Performed day to day Instrumentation maintenance.Commissioned new

installations.

June. 00-Feb. 01

Bay Ltd., Valero Refining, Texas City, TX I &C Technician Supervised

Honeywell FSC installation and commissioning, Supervised and

commissioned CEMS Analyzer Installation on hot oil heaters.

July 99-June 00

Egar Inc., Texas City TX, Outside Instrument Sales and Field Service

Technician, Performed outside sales and worked as Field service technician.

Feb. 99-June 99

Ref-Chem, Kaneka Texas Corp. Pasadena, TX .Maintenance I & E Technician

and Analytical Technician, Performed day to day maintenance of

Instrumentation and electrical control systems.

Jan. 99-Feb. 99

Kaverner John Brown, Bayer Chemical Corp, Baytown, TX Q/C Inspector,

Performed Instrumentation Quality Control on commissioning on new

instrumentation installed.

References upon request



Contact this candidate