Dayna Moore [pic]
Rainier, Or 97048
**********@****.***
Education: 1yr at Skagit Valley College, Skagit Valley Wa, Graduated
from Houston International University
BS Business Management 1984
Certified as a Super user in Oracle: Production Planner, ECO Coordinator,
Shipping Clerk, Buyer/Planner Oracle 2008
15 yrs as a Buyer/Planner,10 yrs as a Production/Planner. 15 yrs
Experience as a Buyer planner/10 yrs as a Production Planner and 3 yrs as a
Master Scheduler. Materials Control planner 3
Evraz NA Portland
Purchasing Manager
4/2012 to present
. Manage total of 5 people, 2 Purchasing Agents, Sr Buyer, Buyer and a
temp Buyer
. Negotiated contracted, and add ons. Saving Evraz NA Portland a total of
2 million dollars this yr, with a goal of 4 million.
. Wrote up contracts and bid packets and wrote up letters of awards.
Managed Suppliers for construction contractors, third party labor and
13.9 million dollars of purchases of MRO parts.
Was hired as a Purchasing Agent and promoted in 9 months.
Dayna Moore and Assc./ Intel D1X Hillsboro Oregon
San Marco, TX
9/2010 to 11/2011
Contract Purchasing Manager
. Manage 3 Billion dollars worth of construction contracts
. Negotiated contracted, and add ons. Saving Intel a total of 3.2 million
dollars, and 2.7 million cost avoidance.
. Supervisor of 4 temp buyers 1 MRO, 3 Contract/purchase expeditors
. Wrote up contracts and bid packets and wrote up letters of awards.
Managed Suppliers for design and cost accounting for one of the largest
construction builds in the nation, D1X at Intel.
Motorola, Inc
Cibolo, TX
!/2006 to 9/2010
Purchasing Agent
* Manage Semiconductor raw material inventory 3.8 million. Procure MRO
and Production material.
* Wrote all contracts and bid packets, wrote letters of awards.
. Negotiated pricing and other terms of purchase orders Negotiated
vendor contracts, as appropriate. Following purchasing business processes..
Quoted materials, procures material, components, equipment and services at
the lowest cost consistent with consideration of quality, reliability of
source and urgency of need. Expedited shortages to meet manufacturing need
dates.
. Expedited to ensure timely receipt of materials. Monitors and
updates commit dates on shortage reports
. Followed up on orders, verified delivery, approves payment, and
maintains necessary records.
. Negotiated vendor contracts, as appropriate. Following purchasing
business processes.
. Coordinating purchasing activities with manufacturing and engineering
departments to maintain inventory at planned levels.
. Interfaced with Accounting and Receiving to resolve problems.
. Maintains inventory levels per plan to minimizes excess and zero
demand inventories. .
. Evaluated supplier reliability. Surveys supplies to maintain adequate
working relationship. Developed new supply sources where suppliers were
inadequate.
. Pulled and read part specifications and engineering drawings.
Certified as a Super user in Oracle:
Production Planner, ECO Coordinator, Shipping Clerk, Buyer/Planner Oracle
Fountain People
San Marcos, TX
12/2004 to 12/2006
Inventory Control Manager
. Procurement, transactions forecast and suppliers' performance,
keeping creating and maintaining program metrics to include on-time
delivery, inventory levels, forecast accuracy and available to promise.
. Maintain a level of inventory by placing on order a wide variety of
material/ supplies managed suppliers.
Manpower/ Motorola
Seguin, TX
4/2004 to 11/2004
AA operator.
. Topside assy, auto-assembly equipment for the F150 engine control.
. Responsible for meeting the run rate and the quality driven by
Motorola's Master Schedule and Production schedules per Customer Sales
orders. Member of the Reduction of Scrap Team
D & M Equine Transport/ Dayna Moore and Assoc. LLC
San Marcos, TX
1/2002 to 2010
Owner of a small businesses
. Purchase all equipment, materials and supplies for the business,
Transport equines across the United States. Owner of a small restaurant
Little Red Caboose and the Fat and Happy Bakery.
Applied Materials
Austin, TX
1/2000 to 1/2004
Production Planner II
. Responsible for production line to meet master schedule.
. Evaluating MRP using planning procures within Oracle executed
cancellations and pull ins, push out, and planned orders as
prioritized.
. Released jobs, expedited parts and placed subcontractor purchase
orders with suppliers.
. Team leader over 2 temporary works expediting parts to meet all of
the planners needs.
. ECO Coordinator: Reviewed and ensured action per
disposition of ECOs within building 46. MRP/ Oracle
Manpower/Applied Material
Austin, TX
9/1999 to 1/2000
Buyer/Planner
. Negotiated pricing and other terms of purchase. Quotes materials,
procures material, components, equipment and services at the lowest
cost consistent with consideration of quality, reliability of source
and urgency of need.
. Expedited to ensure timely receipt of materials.
. Worked with engineering and MPM to recommend new suppliers. Issues
RFQs, analyzes proposals,
D. L. Clark Manufacturing A Texas Family owned Forge and Machine shop
Kyle, TX
7/94 to 8/99
Buyer/ Master Scheduler
. Negotiated pricing and other terms of purchase. Quotes materials,
procures material, components, equipment and services at the lowest
cost consistent with consideration of quality, reliability of source
and urgency of need. Developed new supply sources where suppliers
were inadequate
. Expedited to ensure timely receipt of materials.
. Worked with engineering and MPM to recommend new suppliers. Issues
RFQs, analyzes proposals, negotiates prices and delivery, issues and
/or adjusts purchase orders in a timely manner.
. Followed up on orders, verified delivery, approves payment, and
maintains necessary records.
. Negotiated vendor contracts, as appropriate. Following purchasing
business processes.
. Coordinating purchasing activities with manufacturing and
engineering departments to maintain inventory at planned levels.
. Interfaced with Accounting and Receiving to resolve problems.
. Reviewed on a worldwide basis.
. Maintains inventory levels per plan and performs E&Z analysis.
Minimizes excess and zero demand inventories. Monitors and updates
commit dates on shortage reports.
. Expedited shortages to meet manufacturing need dates.
..When Master Scheduler quit took over all his duties. MRP / SAP
Motorola
Austin, TX
10/90 TO 7/94
Master Scheduler
. Responsible for master schedule of the H-4 semiconductor production
line worldwide in 4 different countries.
. Entered data into master schedule data, based off of the top up and
the top down numbers from marketing. Taking forecast and open sales
orders to product master schedule for wafer, die, test, assy and
final test for my product line.
. Scheduled orders world wide for assy and test at subcontract assy
sites.
. Expedited product through out the world to meet my customer needs.
(Ford, GM, TRW) MRP Oracle
D. L. Clark Manufacturing/ Longhorn Machine Works
San Marcos, TX
10/88 TO 7/90
Production Control Planner/ Buyer Supervisor over 4 indirect employees,
. Worked with Master Scheduler all the forge and machine shop to
maintain production and capacity levels to utilize all manpower and
equipment to meet the goals of management.
. Responsible to fill in with over flow of Purchasing.
. Promoted to Production Control Supervisor after 9 months. MRP/
software SAP
Motorola
Sequin, TX
6/86 TO 10/88
Buyer/Planner Purchased capacitors, resistors and other components using
MRP/ Man Man/ MAS 90/ Oracle.
Datapoint
San Antonio, TX
2/79 TO 6/86
Buyer/Planner Purchased plastic, sheet meta and PCB's and other computer
parts using MRP. Timberline/ Man Man