EMCOR. PPM / Power Plant Maintenance

Santee Cooper

Conway/Grainger

July 2014- present

Johnsonville, South Carolina

Five Star Development/Metroburgh Properties

December 2012- July 2014

Pittsburgh, PA 15233

Facilities Manager/Project Manager

. Oversight of new commercial/restaurant construction/consultation.

. Supervising/scheduling of staff/subcontractors.

. HVAC and electrical design. Set/monitor parameters on automation

systems

. Bryant & Lockinvar boiler systems.

The American Red Cross, Pittsburgh, PA

October 2012-April 2013

Southwestern PA Chapter

Regional Facilities Director

Manage facilities operations for 17 locations in 25 counties.

. Implemented a CMMS for all locations.

. Initiated a capital budget for HVAC upgrades at 8 facilities.

. Achieved a 12% reduction in energy cost.

. Re-bid HVAC service contract reducing by 28%. Upgrade chillers &

boilers.

. Design & procurement of 22,000sf office furniture/equipment.

CB Richard Ellis, CBRE York, PA

March 2012- September 2012

EDMC Account, The Art Institute of York

Facilities Manager

Manage facilities operations for two academic facilities that supported

approximately 500 and 150 faculty members.

. Achieved 15% reduction in electricity cost by leveraging internal

procurement team to solicit supply costs and executed an agreement in

our deregulated territory.

. Maintained overall PM compliance at 100% goal utilizing CMMS

. Directed various tenant improvements consisting of office, medical,

culinary and retail premises.

. Coordinated re-bidding of janitorial & landscape services lowering

costs 10%

. Re-bid janitorial supplies lowering cost by 22%

. Reduced culinary waste by 20%.

. Developed & managed capital improvement budgets & projects for all

locations

. Negotiation/analysis of real estate contracts

. Utilize comprehensive work order system to manage daily work routines

to include client requests.

. Utilize on-line PO and bill pay system to ensure accuracy and on-time

payment of all service

rendered and supplies ordered/received.

. Demonstrate swift and effective response to sensitive issues, complex

inquires or complaints from client and/or management, though

approaching potential issues proactively.

. 2012 Employee Spotlight FM East Coast

. Microsoft Office Suite

CB Richard Ellis, CBRE Pittsburgh, PA

April 2011- March 2012

EDMC Account, The Art Institute of Pittsburgh

Assistant Facilities Manager / Maintenance Engineer

. Corrective, preventive, and predictive maintenance of facilities.

Scope of duties include, but not limited to, mechanical, electrical,

plumbing, HVAC, fire suppression, grounds, security, janitorial, and

pest control.

. Continuously and proactively identified areas for cost reduction

without adding risk, which include, but not limited to: Self-perform

painting, light carpentry, relocate off-site storage to on-site,

initiate HVAC automation system and coordinate/manage small client

box moves.

. Oversight of maintenance and IT technicians and all vendors and work

closely with staff and subcontractors to resolve issues in a timely

and cost effective manner. Review daily maintenance reports and

prioritize work routines. Attend regular management meetings with

Facility Manager and facility owners. Enforce compliance with all

local and state codes.

*Certificates: Ethics & Compliance, Harassment, Defensive Driving, OSHA

safety courses, JCAHO regulations, LEED values/sustainibilty.

*Equipment familiarity: Carrier AHU, MUA. Aaon MUA. BAC water tower,

Carrier chiller, KMC loop computer driven. Rheem Raypack 5-stage boilers,

DHW. Siemens Cerberus Pyrotromes fire suppression- both water & air

pressurized. Cummins transfer switch generator. Schindler elevator and

control panel 400A. ChemAqua tower chemical systems. Bosch surveillance,

Altronix.

*Excellent communication, multitasking and problem solving skills.

LOWES, Pittsburgh, PA

Sept 2010- April 2011

Manager

. Training and oversight of all department employees.

. Budget analysis and demographic studies.

. Store 'set', inventory replenishment, weekly cycle counts, monthly

price audits, loss prevention, and Hi/Lo reports.

. Power equipment certified.

CIRCUIT CITY, Pittsburgh, PA

July 1996- January 2009

Regional Facilities Manager/Maintenance Engineer

. Corrective, preventive, and predictive maintenance of up to 28

regional facilities. Scope of duties included all mechanical systems,

fire suppression, security, and access control. Oversight of all

subcontractors and vendors.

. Extensive travel for new store 'set' and LRT management of inventory

'set'.

. Equipment familiarity: Trane Tracer, Carrier, A.O.Smith, Cummins.

MORAN CUSTOM HOMES, Mars, PA December

1992- June 1996

Owner/Builder

. Selling and construction of Timber Frames & Log Homes.

. Skilled in masonry, carpentry, mechanicals, finish trades, elevations,

survey, excavation.

US NAVY, USS Nassau LHA-4, Norfolk, VA

June 1983- March 1986

Machinist Mate 3rd Class

. Maintained and operated hydraulic power plants, governors, hoists,

cylinders, refrigeration systems, diesel engines, and pressurized air

systems.

Education: University of Pittsburgh /Business

1991

References: David Colazzi CEO/CFO - 5 Star Development 412

901-4384

Allen Kuchinick; Facility Manager - CBRE

412-***-****

David Frazee; Building Manager- Metroburgh

412-***-****



Contact this candidate