Post Job Free
Sign in

Power Plant Electrical Engineer

Location:
U.S. Air Force Academy, CO
Salary:
60000
Posted:
August 15, 2014

Contact this candidate

Resume:

VARUNKUMAR ALAGARSAMY,

************@*****.**.**

+91-994*******

Skype ID: avarunkumar1984

***, ************,

T.puthupatti (P.O),

Tirumangalam (Taulk),

Madurai (District),

TamilNadu, INDIA-625704

Personal Details

Date of Birth 12.11.1984

Nationality Indian

Marital Status Married

Objectives

* Experienced in AC/DC drivers, PLC/SCADA, Electrical Systems and Pulp &

Paper process.

* Skilled in implementing project plans within the stipulated time.

* Expertise in designing, troubleshooting and reviewing of electrical

designs and drawings (e.g., Piping and instrument diagram (P&ID),

circuit diagram, Bill Of material, general arrangement etc.)

* Adherence to best practices in regard to project support and

documentation.

* Responsible for detailed technical documentation and presentations as per

requirements

* Commissioning and testing of systems and panel thoroughly at client

site.

* Designing SCADA according to process parameters and setting up

communication between SCADA and PLC as well as between SCADA and HMI.

* Preparing the logic for PLC according to the process and customer scope.

* Designing & preparing Control & Converter Panels, wiring documentation,

interconnection, interlocking logic, Control loop Diagram.

* Sound knowledge of ISO and NEMA standards.

* Highly skilled in designing, assessing, monitoring and implementing

various projects.

* Ability to think analytically and strategically.

* Ability to perform task under pressure and within deadlines.

01-12-2012 To Till Executive Electrical Engineer-Plant Services,

Date.

ST PAPER LLC(International Paper),USA

Successfully converted BELOIT Paper machine run by

(International paper) to tissue machine in Jan 2013

speed 2500FPM and Deckle 8.0 meters.ABB DCS,Accuracy

1190 QCS system and smart profiler automation with

highway communication AB PLC,GE drives Profibus.

ANDRITZ Hood and Honeywell Burners with using

natural gas system erected, commissioned and running

successfully since Jan 2013.

Maintenance of 7.5MVA HT, 1.5 MVA and 2MVA

Transformers Make: Westinghouse and GE.

Maintenance of MCC bucket and HT Motor Make:

Westinghouse and AB.

Erected and commissioned Paper machine sectional

drives by TM-10 GE Drives, ABB stand alone drives,

AB VFD's, ABB VFD's ACS600 and 800.

Having Knowledge in Proficy quick panel programming,

GE control system.

Having knowledge in logixRx3i PAC PLC communication

system.

Key Deliverables:

* Minimizing the down time by improving overall

equipment efficiency

* Leading a team of technocrats for execution of

maintenance activities of Preventive, Predictive and

shut-down type of all equipments for one of the

largest Paper Facilities

* Working for improving the Overall Equipment

Effectiveness (OEE) by focusing on improvements in

availability & performance of equipments for quality

products

* Responsible for breakdown trend analysis, Root

cause failure analysis & planning/execution of

corrective actions

* Responsible for providing adequate support for

continuous improvement in Safety standards and

reduction in maintenance costs

* Responsible for providing technical consultation

for different new Projects & modifications in

existing systems for Process Improvement.

* Accountable for general in-house Administration

and management of Spares & PLC programs

* Assist in developing SLD, relay coordination,

preparation of calculations, specifications, control

schematics, cable schedule, electrical room layout,

hazardous area classification.

* Review and finalize Design criteria documents,

Purchase specifications in line with Contract

specifications.

* Review Control Philosophy/schemes, Panel wiring

drawings, cable schedules, Master Schematic

Diagrams, JB schedules, Control Valve/Flow element

sizing, and instrument installation drawings.

* Assigned the tasks of developing budgets,

material, estimating labor and project construction

costs.

* Responsible for preparing specifications for

purchase of electrical equipments and materials.

* Coordinate and liaise with engineers, architects

and contractors

* Participation in Factory Acceptance Tests (FAT)for

Control systems.

* Erection planning/supervision at site ;

Commissioning of plant control systems.

* Interacting with clients/consultants for resolving

issues of engineering/erection/commissioning.

* Responsible for monitoring budget and schedules.

* Experience in handling power distribution system

in the plant, energy conservation & project

implementation.

* Testing of all Protection components and Numerical

Relays.

* All scheme checks including stability, Bus bar

Protection, REF Protection and Differential

Protection sensitivity.

05-09-2011 To Executive Engineer-Plant Services,

01-12-2012 SIEMENS LTD, I&S,PS, NaviMumbai, SAGARDIGHI

ThermalPowerPlant(2x300MW),WBPDCL

Operation and Maintenance of (IPH,OPH)

Boiler,Turbine Auxillaries,All Electrical Material

Supply=DEC[China]

Maintenance of GT-1&2,370MVA (20/420KV),

ST-1&2,50MVA (230/6.9KV) and 4X25MVA Transformer UAT

(20/6.9KV) all Power Transformer Routine Inspection

Work.

ICT, 315MVA (400/220/33KV),3 No's Shunt

Reactor(21MVA) Maintenance work, and all DRY Type

Transformer (6.6/0.433KV).

Maintenance of all HT&LT Motors, 6.6KV&415V

Switchgear System.

Maintenance of 400KV, 220KV&33KV Switchyard All

Equipments.

14-04-2011 to Electrical Engineer(E1)

01-09-2011 M/S CETHAR VESSElS LIMITED,Trichy

Commissioned and Operation maintenance of

Transformer Protection, Motor Protection Relays

MicomRelayP632,p211,p921,p922,p923,p111,p120,p121,p1

22,p123,p124P125,p126,p127 make AREVA.

Setting of relay Input and output configuration

programming.

Commissioned and Operation maintenance of HTpanel

(VCB) make AREVA 2400Kw, 1100Kw, 500kw, 230kw, 132kw

all H.TMotors &HTPanels.

Commissioned and Operation maintenance of u/v relay,

numerical relay(51n),lockout relay(86),Trip circuit

supervision relay(TCS95),Time delay relay(NT10).

IN M/S CETHAR LIMITED(EPC CONTRACTOR),Raipur site

(ACB)2x135 MW Thermal Power plant (270MW) as an

Electrical Engineer in power plant,from28-04-2011 to

01-09-2011

Responsibilities for 400kv Feeder lines

2,Generators2x135MW(270

MW),13.8kv,3ph,50hz,0.8p.f.(Make HTC

China),H.Tmotor,420/13.8 kv,2x180 Mva generator

transformers,400/6.69kv,2x40 Mva station

transformers,13.8/6.9 kv,2x20MVA Unit Auxillary

Transformers, mv panel,pmcc panel,mcc panel also

Inter connecting transformer, Erected and

commissioned.

2x150MW Thermal Power Plant (300MW), Rajasthan Site

(SREECEMENTS) in 14-04-2011 to 28-04-2011.Plant

Erected and commissioned.

January 2007 to April Electrical Engineer,(Plant Engg).

2011 SUBBURAJ PAPERS PVT LTD, Tirunelveli.

Responsible for 110 KV switchyard, Thermal (CFBC &

AFBC Boiler) Power plant, and 350 tons paper machine

drives - Sinamics. Maintenance of HT motor, 15000

KVA Transformer, SF6 Circuit breaker and S7 400 PLC,

Sinamics Drives S 120, G120, G130.

Operation and maintenance of 35 ton capacity of EOT

Crane system.

Erected and commissioned, drive tuning and

troubleshooting of the following drives,

Siemens sinamics G120,G150,G130,sinamics S120 and

micro master 420 and 440 drives,ABB Acs 550,Acs800,

AB Drives and L&T For Paper machine and DIP.

Maintenance and testing of soft starter

(12KV,50Hz,1250Amps,siemens),vacuum circuit

breaker(2000Amps,12KV,50Hz,siemens),Air circuit

breaker(415V,2000A,siemens).

Overhauling and testing of HT and LT motor.

Operation and maintenance of 1x30MW,11KV steam turbo

generator and Its all auxiliary equipment trouble

shooting knowledge in synchronizing panel, generator

protection relay panel, LA,NGR,CT and PT.

Operation and maintenance of 1x1.5 MW Diesel power

generator trouble shooting knowledge in

synchronizing circuit, AVR panel and relay

protection circuit.

Operation and maintenance of 10x2500 KVA, 11KV/415V

step down power transformer and various protective

relay.

Operation, maintenance and testing of UPS system,

Battery charger panel.

Maintenance of plant total lighting system, testing

of earth pit.

Operation and maintenance of the following familiar

of Siemens Sinamics, G120, G130, Sinamics S120/150,

Micro master 420,440 drive tuning and programming.

Siemens S7 400 PLC Ladder program knowledge.

110/11KV Substation Operating activities for SF6

CB,OCB, ACB, VCB.

Handled Maximum capacity AC motors 1250 KW.

DOL&SOFT starters handling.

Maintenance of Hoists cranes.

Preparing the cable schedule, cable tag & cable

October 2006 to laying Plans.

January 2007 Having Knowledge in S7 400, S7 300 & SIEMENS PLC.

Service Engineer.

ABB SYSTEMHOUSE, Coimbatore.

June 2006 to Programming &Maintenance of ABBMake ACS600, ACS550,

October2006 ACS 800.

Trainee Engg

Servalakshmi Paper and Boards Pvt Ltd, Vilampatti.

Trained up Paper machine Electrical maintenance

activities.

Reference

Robert visscher *************@***.***

(Mill manager) +1-757-***-****

Ajay tak +1-240-***-****

(Management analyst)

Educational Qualifications

2002 - 2006

Bachelor of Engineering - Electrical & Electronics

Engineering with 72% First class.

Certificate received: Bachelors Degree (B. E.,)

Awarded by: Anna University, Chennai.

School Education

2000-2002 St.Xaviers Higher Secondary School 12th std with 92%.

Certificate received: High school education

certificate.

1999-2000

V.N.Higher secondary school 10th std with 96%.

License and Passport Number

TNEB C License No C41858(Electrical HT,LT Approval)

F7384992

Passport No

Franklin, Virginia, USA-23851



Contact this candidate