Post Job Free
Sign in

Electrical Engineer

Location:
Fremont, CA
Salary:
depond on you
Posted:
August 15, 2014

Contact this candidate

Resume:

Syed Muhammad Najamuddin

**-** ********* ***, ******* CA, 94538; ************@*******.*** ; 510-

***-****

Objective:

A challenging position in the field of residential and commercial building

electrical design that would provide an opportunity for learning,

development and application of techniques and methodologies to resolve real

world problem(s).

Project related skills

Electrical Design Execution of Factories Commercial & Residential

Works Electrical Electrical Designing

Designing

Electrical skills

Load Calculation. Circuit Distribution Board Low Tension Panel

Designing. Designing Designing

Pole Mounted Equipment KVR (Kilo Volt Ampere) Generator Size

Transformer earthing Calculation.

Designing Panel Designing.

and Calculation.

Power Load High Tension Power Distribution

Calculation. Panel Board.

Designing

Computer Skills

. Applications: Autocad, MS - Word, MS-Excel, MS-Powerpoint,

. Operating System: Windows XP, Windows 7, Window 2000 Server

(Educational Knowledge), and Advance Operating System / VS for Data

General, MV Series.

Training & Certifications

. CCNA 6.0

. Windows 2000 Server

. LAN Network Configuration and Implementation

. Oracle 9i DBMS

Education

NED University of Engineering & Technology Karachi, PK

Jan 1998 - Jan 2000

Master of Science - Electrical Power

NED University of Engineering & Technology Karachi, PK

Jan 1994 - Dec 1998

Bachelor of Engineering - Electronics

PROFESSIONAL EXPERIENCE:

PERIOD COMPANY NAME EXPERIENCE

August 1999 - International Project Management of all projects

March 2014 Consulting undertaken by the firm Preparation of

Engineering design criteria of various power

Distribution, Industrial and Commercial

Projects. Contract negotiation and

evaluation.

Planning and design engineer Design

assignments for 11 Kv. and 400 Volt

Distribution networks in Korangi and

Landhi Industrial Areas, 11 Kv. & 400

Volt Distribution scheme for Korangi and

Industrial and various street lighting

system.

Responsible for preparing schemes and

checking of design reports and tender

documents prepared by the Consultants,

evolution reports affecting the contract

administration and coordinating with the

consultants and contractors.

1995 To 1998 Associates Planning and design of Electrical

Electrical distribution facilities for the city of

Engineer Karachi.

Execution and installation of Transformers

Switch gear etc.

Erection and installation of L.T. & 11 KV

panels etc.

Erection and installation of Street

Lights.

Supervision of the installation of LT & 11

KV O/H mains.

Inspection of equipment and material.

Preparation of contract documents, Bill of

material and evaluation.

Supervision of the construction of

Sub-stations

Power house Heavy sectional foundations

etc.

Prepared project proposal for various

schemes of development of distribution

networks Bill of Material, Material

procurement.

August 1993 To Development Responsibilities including keep a close

1995 Projects eye the Transaction manual handing of

confidential Land files, security of data

Implementation and Evaluation of the land

management system.

Coordinate Efforts with the additional &

assistant.

Director of different housing scheme in

land department.

Managing three Groups comprising twenty

seven (27) computer personnel (Three

Supervisors, each supervisor consist of

eight data Entry operators.

Supervisors involved in various jobs

viz:(Almost 5 lace Hosing units in Karachi

have to be computerized.

Current affairs of directorate of land

Management Updating & printing of document

e.g. Allotment & Possession Order etc. of

plots of all schemes.

Running pay Roll system of almost Eight

Thousands employees. All Assistant

Director (DP) are responsible to manage

data

Processing and entire affairs of the

groups.

Aug .1991 to HI-TECH Installing Configuring trouble shooting

Aug. 1993 and maintaining of Novell Netware system.

Installing configuring trouble shooting

and maintaining of UNIX operating system.

Cabling of Local Area Network.

Jan. 1988 to Lakson Tobacco Electrical and electronics panel of

July 1991 Company Tobacco Machine.



Contact this candidate