IHSAN HASSAN
**** ***** ******** ****. 905-***-****
Mississauga, ON/ L5M 7W3
E-mail: **********@*****.***
HIGHLIGHTS OF QUALIFICATIONS
. Professional Senior Project Manager with over 25 years of experience in
the construction business of Industrial, Commercial, Institutional,
Residential/ High-Rise Buildings, Infrastructures, Roads, Highways and
Heavy Civil Engineering Projects with Budgets valued up to US$ 700
Million.
. Expert in Multi Organization Trades: Supervision, Consultant,
Construction Project Management, Contractor, Developer accomplished
successfully a lot of diverse multiple-use/disciplines projects.
Adept in setting up project process / concept, extent, schedules, design,
tender, development, budgets, pre-construction, pre-qualification, value
engineering, execution, pursuant, construction management, biddings,
modifications, billings, claims, change orders, ADR and excellent in
mediation.
Strong skills in liaison with stakeholders, presided successfully various
project's meetings, directed project team with corporate policies, managed
subcontracts packages (sourcing, negotiating, hiring), led DRB, organized/
spanned multi-disciplines, oversaw progress, compressed schedules,
completion/ handing over/ fit out works of various projects from conception
to completion.
Competently managed the strategies of progress improvement and resource
optimization, prioritizing the essential elements (Time, Quality, Risk,
Budget and Flexibility) to maintain Client's expectations.
In depth knowledge of HSE practices, enforced safety procedures, optimized
efficient work environments that statutory complied and maintaining
consolidated risk assessments.
Experienced with the most efficient/ latest Construction Project Management
Techniques for the Heavy/ High Scaffold, Formwork Systems, BBS/ Rebar
Techniques, Concrete Technology, Pre-Cast/ Pre-Stress/ Pre-Tension/ Post-
Tension Concrete, Shoring, Deep Excavation, Piling, Anchoring, Shot- Crete,
Dewatering/ Water-Proofing Systems, Architectural Works/ Aluminum, Granite
Cladding/ Glazing, Landscape, Roads, Pavement, Infrastructures Works,
Project's Logistics and Procurement.
Effectively utilize MS (Word, Excel, Power Point, Outlook), AutoCAD,
Primavera and 4Projects.
EMPLOYMENT HISTORY
Project Manager/ Carillion Canada Inc., Toronto, ON, Canada
Contract / 2012 - 2013
Project/ Forensic Services and Coroner's Complex- MCSCS, Toronto, Budget of
CD$ 300 Million.
. Led, provided engineering support to construct seven floors building
(Total built-up area 13,700 M2- height 120 feet) of Forensics Laboratory,
Medicolegal Autopsy and Coroner's Court Complex. Labs contain chemistry,
biological services, instrumentation, microscopy, physical properties
analysis, plus two basements including CL3 Lab, Firing Range and Parking
for 350 spaces, Lot Area 22,260 M2.
. Managed successfully multi packages in line with PSOS, Contractual
Commitments and Financial Targets (Revenue/ Cash-flow) and oversaw
various Trades, Disciplines and Subcontractors.
. Proactively with the head management identified risks to the schedule and
conducted weekly constructability review for the whole operable
construction process and ensured efficient resolutions which enabled to
attend timely the Project's Milestones (Occupancy, Substantial, Final)
Completion.
Project Manager/ Rafat General Contractor Inc., Toronto, ON, Canada
2011 - 2012
Project/ Dundas Development (Retail Area- Phase 1) - FCML - Project Budget
of CD$ 10 Million.
Led, provided engineering support to construct Storm, Sanitary Sewer, Water
Distribution/ Fire Fighting, LPG, Power and Telecommunication Networks
Systems, Storm Water Management Systems (Storm Pond, Underground
Infiltration Trenches (2/ 300+2/ 600) m3 up to 15 M. Depth, Earth/ Cut,
Grading, Engineering Fill, Concrete Curbs/ Sidewalks, 5 Km. length of
Roads, Parking Lots for 2000 Cars and Asphalt Pavement Works as well.
Verified effectively the land construction developments including desired
levels, cut/ fill, subgrade/ grades, recycling materials used, soil
replacement by the engineering fill construction management.
Maintained the Environmental Protection for the adjacent surrounded (River,
Green area, Buildings).
Accomplished Phase I- one month ahead of the schedule to the Client's full
expectation.
Sr. Project Manager/ Al Habtoor-Leighton Group (Contractor), Abu Dhabi -
(U.A.E) 2008 - 2011
Project / Al Bustan Complex Mixed Use Development - Project Budget of US$
650 Million.
. Spearheaded construction of Five Buildings including Offices, Hotel/
Retail Mall and Three Residential Apartments Buildings consisting of
18 Floors, Podium, 5 Basements Combined Parking 800 Cars/ Level
(Total built-up area 275,200 m2), Landscape and Infrastructures.
Works comprised 22 m. span/ 3.8 m. height pre-stressed/ post tension
concrete podium girder.
. Managed a team of 15 Engineers, 45 Professionals, up to 1200 Workers
and 14 Subcontractors.
. Effectively led the reconstruction of the 50 Lm. collapsed secant
piles 20 m. shoring depth out of 900 Lm., scheduling, redesign,
groundwater monitoring, engineering techniques such as re-anchoring,
pressure grouting, re-shoring with precast wall units and reinforced
shot- crete.
. Successfully accomplished 10 months recovery program in 5 months and
resolved the delay by maintaining always the project expediting list
for the biggest building - West Residential Tower.
. Utilized latest Systems of Heavy/ High Scaffold, Formworks from Raft,
Transfer Slab to Roof.
. Optimized Formworks accessibility/ delivery, carried- out exceptional
logistics construction management and used Climbing System for the
lift cores and precast units for the stair cases flights that reduced
30% from the concrete structure lifecycle.
. Monitored/ analyzed through the construction management weekly
meetings the financial performance audits, project costs/ forecast,
budgets, cash-flow and assisted in determining corrective actions
that tracking actuals against budgets in a timely efficient manner.
Resident Engineer / Dar Al-Handasah Consultants (Shair& Partners), ( U.A.E
) 2006 - 2008 Oceana
Development Project, Palm Jumeirah, Dubai - Project Budget of US$ 700
Million.
. Supervised the construction of Tourist complex of 240,000 m total
built-up area on an island of 40,000 m, 7 Shoreline Condominiums
Buildings, 16 stories (640 units), 3 Basements Parking 500 Cars/
Level, Landscaping, Lazy River, Health Club and Out Door Pool over the
Podium and Twin Towers 5-Stars Hotel 300/ key, 130 Furnished
Apartments, Indoor Pool and Restaurant in the 14thand 15th Floors.
. Directed, developed a team of 40 Engineers, 15 Professionals and being
held accountable to recommend revisions, redesign review, change
orders, undertook the value engineering to confine the cost within the
budget and implementing deficiency inspections, correction programs
and archiving documentation.
. Managed / maintained a close working relationship with 15 Individual
Contractors and created efficient project deliverables including
quality, timelines and budget to the stakeholders most expectations.
. Led the design team to reduce the indoor swimming pool depth from 1.7
to 1.4m. by lifting the steel structure deck ( 22m. span) by 0.30m.
short steel columns distributed on the purlins and main girders.
Project Manager / Dar Al-Handasah Consultants (Shair& Partners), ( U.A.E )
2003 - 2005
Police Administration Complex Project, Abu Dhabi - Project Budget of US$ 60
Million.
. Spearheaded the supervision / design review team for the construction
of Four Buildings (modified at construction stage), Administration,
Officers Residence, Soldier Barracks, Club, Mosque, Stores, Workshops,
Shaded Parking (45,000 m total built up area), Sports Facilities/
Landscaping (65,000 m ),
5Km. length of Roads, Parking Lots for 1500 Cars and Asphalt Pavement
as well.
. Managed successfully a team of 12 Engineers and 10 Professionals
(Multi-Disciplines) with a strategy of continued diligent to achieve
objectives with boundaries of Client requirements.
. Led the supervision of infrastructures works (storm, sanitary sewers
pipelines, storm underground storage, cabling, district- cooling
system, irrigation system, specialized training facilities and
recreational infrastructures), landscape, road works and buildings
cladding with stoned finish pre-cast concrete units.
. Led the redesign, modifications and developments of the Underground
Concrete Water Tank capacity from 200 thousands to 1.2 million gallons
and the expansion of all the buildings successfully by the seniors
construction management team and saved the redesign cost of US$
550,000 for the Client's benefit.
Resident Engineer / Schuster Pechtold & Partners Consultants, Dubai - UAE
2001- 2003
Dubai Media City Project - Phase II,Dubai - UAE - Project value US$ 35
million
. Managed the construction of Five Buildings (Offices, Residential and
Retail Areas) with total built-up area of (36,000 m2) including 2
Basements Parking, Ground + 8 Floors and 3Km. length of Roads.
Works also included external aluminum / glazing cladding, site
landscaping and infrastructures.
. Led a team of 8 Engineers and 7 Professionals to supervise/
renegotiate packages with sub-contractors/ suppliers, scheduled all
tasks, performed cost analysis and valued engineering within budget,
without foregoing quality resulting project substantially completion
two months ahead the deadline.
Project Manager / Dhabi Contracting Est. (Contractor), Abu Dhabi - UAE
1997 - 2001
Spearheaded / accomplished the construction of the following projects:-
-Project - 3 / Clock Towers (Two Adjacent Towers), Project Value US$ 47
Million 1999 - 2001
. Two Towers consisting of 30 Levels, Three Basements Parking (total of
- 157 Luxury Apartments, Offices, Retail Area, 2 Indoor Pools, Health
Club and Gymnasium).
-Project - 2 / Al Heel Tower, Project Value US$ 32 Million
1998 - 1999
. Tower consisting of 26 Levels, Three Basements Parking (80 Luxury
Apartments, Offices, Retail Area).
-Project - 1 / Three Sails Tower, Project Budget US$ 38 Million
1997 - 1998
. Tower consisting of 26 Levels, Three Basements Parking (Total of
50+One Full Floor Luxury- Apartments, 50 Offices, Retail Area, 2
Restaurants, Health Club/ Gym and Mechanical Floor).
For the above said Three Projects jointly achieved the following:-
. Led the major role/ achieved exceptionally budget saving around US$
750,000 for the company benefit by reselling the used purchased
scaffold, formwork systems to the same supplier after sharp
renegotiation.
. Managed, developed, hired effectively (350 to 500) Professionals and
(30 to 40) Subcontractors.
. Accomplished the projects successfully/ recovered the delay due to the
Client's modifications by recovery monitored programs which enhanced
the team capability, productivity, accountability besides the earlier
identifying to the interfaces and the immediate active resolutions.
. Carried out directly most of the finishing works (saved around
US$1,750,000) and that stood as a landmark in my career through the
efficient managing of the domestic resources, maintaining the
training/ coaching with incentive man-hour plans and cost saving which
all addressed in a timely manner.
. Works also comprised external aluminum/ glazing cladding/ curtain
walls, central air-conditioning, central gas supply, waste management
system, infrastructures works and Window Cleaning Systems (BMU).
. Obtained / assembled project close-out documentation (As-Built
Drawings, Manuals, Warranties, Vendors List, Certificate of
Substantial Completion, Municipal Departments Sign-offs and Building
Permit).
Al Rasheed Construction Contracts Co. / Ministry of Housing&
Construction, Baghdad- Iraq.
Head of Technical Department 1994 - 1996
Sr. Project Manager 1990 - 1993
. Led/ assisted the head construction management in the preparation of
tender's submissions, project budgets/ updated forecasts, schedules,
approvals, client's reports, contracts negotiations and promoted in
the company marketing effort, growth and construction business
strategies.
. Established/ developed a quality control program for the projects and
define roles, scope, responsibilities and procedures for meeting
quality requirements and ensured that all contractual obligations,
improvement programmes were understood and met by all parties.
. Identified potential risks, opportunities, design/ construction
conflicts, cost tracking, alternative solutions using best
construction practices, value engineering and logistic strategies
ensuring full compliance to the HSE requirements, scope, time and
budget to the client's full satisfaction.
. Managed/ multitasked in a fast paced construction environment and
accomplished successfully:-
. 25 Km. of Asphalt Pavement Highway with Granular Shoulders and
Concrete Culverts.
. 20 Industrial Buildings of precast pre-stressed concrete elements
(Hollow -core Slab and Wall, Double- T Beam/ Slab, Columns and
Footings), span 20m.x 48m. and budget of US$ 30 Million.
. Vegetable Oil Refinery, fast track job consisted form the construction
of 12 Cylinder Steel Tanks (20 m. Dia. x 10m. Height). Works comprised
concrete piles, concrete platforms for the steel tanks, steel sheet
piles shoring, piping networks, equipment/ storage buildings,
infrastructures, roads and MEP works. Project Budget: US$ 20 Million.
. Installation of Prefabricated Steel Structures for Ten Warehouses
(60m. span x 120m. length) and civil works, sandwich aluminum walls/
ceilings panels. Project Budget: US$ 35 Million.
. Earned profitably the bidding of various projects of total budgets
over US$ 350 Million.
General Authority for Buildings / Ministry of Housing& Construction,
Baghdad- Iraq.
Head of Planning/ Pursuant Department 1988 - 1990
Sr. /Construction Project Manager 1984 - 1988
Resident Engineer 1979 -
1983
. Managed multi- construction disciplines and ensured that governance
construction laws/ standards, codes and projects methodology were met/
complied throughout the project life cycle.
. Accomplished successfully the following projects with multi-rules as a
( Client Representative, Consultant, Supervision/ Pursuant and
Construction Project Management Firm) :-
. 17 Stories Governmental Complex Building ( built-up area of 17,000m2)
+ 7000m2 Conference area (500 persons) with concrete dome 30m.
diameter and 17m. height with luxury finishing, stone, marble,
granite, joinery, aluminum and glazing cladding., Project Budget: US$
35 Million.
. Residential Camp, comprising 60 double floors buildings, each with a
built-up area of 1000m2.
Camp includes commercial centre, clinic, health club, playgrounds,
outdoor swimming pool, outdoor theatre and cinema, gas station,
mosque, parking, roads network, two schools, water/ waste treatment
plants, landscape and infrastructures networks. Project Budget: US$
350 Million.
. 35 Fortified Concrete Civil Shelters, Ground + Two Basements (built-up
area of each 6,000m2).
Project Budget: US$ 120 Million. Multi-use ground floor (Schools,
Libraries, Clinics, Nurseries, Sport/ Health Clubs, Social Celebration
Centres) and 2 Basements Shelter for 1000 persons.
EDUCATION
Bachelor of Science in Civil Engineering
University of Baghdad, Iraq / Accredited by: University of Toronto, ON. /
Canada
PROFESSIONAL DEVELOPMENT
- Professional Project Management Program/ Cambridge Education Centre/
U.A.E
- Standard First Aid with CPR A + AED
St. John Ambulance- Mississauga / Issued by Ontario Council (Expiry Date -
Aug 17, 2014)
MEMBERSHIPS AND AFFILIATIONS
. Eligible for PEO / P. Eng. Registration in process/ File Number
(100204841).
(Satisfied PEO's Academic Requirements for Licensure)
. Canadian Council of Professional Engineers - Initial Assessment of
Qualification for Engineers CCPE Initial Assessment Log # 00084879.