WILFREDO R. BLANCO
Friendswood, Texas 77546
316-***-**** Cell
******.********@*******.***
Work Experience
Titan 360SI: Huntsman Chemical Port Neches, TX March 2014 to present.
Vendor surveillance for the F-4 T/A. Following all facets of the work per the job scope. From delivery to return back to the plant. Making sure the work stays within the allotted by communicating with the shops QC and production department. Communicating with the customer if there was any deviations to the job scope and by daily reports with pictures stating the status of the job.
Petrochem Inspection- Huntsman Chemical Conroe Plant Jan 2014 to March 2014
Inspector/ RBMI Analyst- QC Capstone RBMI software, entering, updating data, running and updating criticality, work plans and analyzing ultrasonic readings. Also mentoring and helping inspectors with daily effort of repairs, run and maintain.
Draco Global Solutions- Sinclair Refinery 11/ 2013 to 01 /2014
Performed API 510, 570,653 inspection. Mentoring and training in house unit inspectors. Support RBI implementation, coordinate NDE and Metallurgical inspection on stream and T/A. Report directly to the Corporate PSM manager.
Early Companies- Simplot Company 08/ 2011 to 11/ 2013
Performed API 510 inspection and 579 FFS on an Anhydrous Ammonia Bullet Tank
Early Companies- Eagle Rock partners, Kuraray 2011
Sr. Mechanical Integrity Specialist
• Performed MI Gap Analysis Per OSHA 1910.119 J1 through J6
Premier MI – Enterprise Chemical, Chaco N.M and Odjfell Terminal, Seabrook, Tx –2009 – 2011
Site Lead
• RBMI Program implementation and Data input
• Data collection (P&ID verifications, Mechanical Integrity Evaluations and Updates)
• Corrosion Study
• Criticality run and Inspection work planning.
• API 510, 570, 653
Capstone Engineering – Huntsman Chemical, Conroe – 01/09 to 08/09.
Inspector / Site Lead
• RBMI Program implementation and Data input
• Data collection (P&ID verifications, Mechanical Integrity Evaluations and Updates)
• Corrosion Study
• Criticality run and Inspection work planning.
• Generation and update of Inspection ISO’s and inspection systems
• Field verification of pressure vessels, Storage Tanks, RV’s and Piping
• API 510, 570, 653
Capstone Engineering – NASA Stennis Space Center – 7/06 to 01/09.
Inspector / Site Lead
• RBMI Program implementation and Data input
• Data collection (P&ID verifications, Mechanical Integrity Evaluations and Updates)
• Corrosion Study
• Criticality run and Inspection work planning.
• Generation and update of Inspection ISO’s and inspection systems
• Field verification of pressure vessels, Storage Tanks, RV’s and Piping
• API 510, 570, 653
Capstone Engineering – Tesoro Refinery., SLC, Utah – 2/06 to 05/06, Anacortes, Wa 5/06 to 6/06 and Golden Eagle 6/06 to 7/06
RBMI Specialist
• RBMI Program implementation and Data input
• Data collection (P&ID verifications, Mechanical Integrity Evaluations and Updates)
• Corrosion Study
• Criticality run and Inspection work planning.
• Generation and update of Inspection ISO’s and inspection systems
• Field verification of pressure vessels, Storage Tanks, RV’s and Piping
• API 510, 570, 653
Capstone Engineering – Valero Refinery– 11/00 to 02/06
RBMI Specialist
• Data collection (Field verification of pressure vessels, Storage Tanks, RV’s and Piping)
• API 510, 570, 653
Moody International – Air Products and Chemicals Inc., Wichita, KS – 9/96 to 11/00
MI Specialist
• Mechanical Integrity Program Implementation (510)
• RBI Program implementation and Data input per API
• Data collection (P&ID verifications, Mechanical Integrity Evaluations and Updates)
• Corrosion Study
• Criticality run and Inspection work planning.
• Generation and update of Inspection ISO’s and inspection systems
• Field verification of pressure vessels, Storage Tanks, RV’s and Piping
• T/A support (Internal, and external inspections of pressure vessels)
• API 510
Longview Inspection – Petrochemical Complex-Bayport, Pasadena, TX – 11/95 to 9/96
Inspector
• Mechanical Integrity Program Implementation (510/570/653)
• RBMI Program implementation and Data input
• Data collection (P&ID verifications, Mechanical Integrity Evaluations and Updates)
• Maintenance Shutdowns
• Hydro Testing
• Valve Call out support for facility
• Criticality run and Inspection work planning.
• Generation and update of Inspection ISO’s and inspection systems
• Field verification of pressure vessels, Storage Tanks, RV’s and Piping
• T/A support (Internal, and external inspections of pressure vessels)
• API 510
SGS Industrial Services – Lyondell Petrochemical Complex-Pasadena, TX – 7/95 to 11/95.
Inspector
• Maintenance Shutdowns
• Hydro Testing
• Valve Call out support for facility
• Criticality run and Inspection work planning.
• Generation and update of Inspection ISO’s and inspection systems
• Field verification of pressure vessels, Storage Tanks, RV’s and Piping
• T/A support (Internal, and external inspections of pressure vessels)
• API 510
SGS Industrial Services – Shell Oil DPMC, Deer Park, TX-Delayed Coker Project – 3/9 to 7/95
Inspector
• Maintenance Shutdowns
• Baseline Inspections for corrosion/erosion surveys
• Ultrasonic thickness gauging utilizing Krautkramer DME2
• Panametrics 26DL, and Panametrics 26DL Plus
• Hydro Testing
• external inspections of new and in service above ground storage tanks in accordance with API 653
• Valve Call out support for facility
• Criticality run and Inspection work planning.
• Generation and update of Inspection ISO’s and inspection systems
• Field verification of pressure vessels, Storage Tanks, RV’s and Piping
• T/A support (Internal, and external inspections of pressure vessels)
• API 510, 570, 653
Technical Welding Laboratory – Hess Oil, St. Croix, USVI-FCC Project – 9/92 to 9/94.
Inspector
• Maintenance Shutdowns
• Baseline Inspections for corrosion/erosion surveys
• Ultrasonic thickness gauging utilizing Krautkramer DME2
• Panametrics 26DL, and Panametrics 26DL Plus
• External inspections of new and in service above ground storage tanks in accordance with API 653
• Valve Call out support for facility
• Criticality run and Inspection work planning.
• Generation and update of Inspection ISO’s and inspection systems
• Field verification of pressure vessels, Storage Tanks, RV’s and Piping
• T/A support (Internal, and external inspections of pressure vessels)
• NDE to include ultrasonic straight beam, and thickness gauging, liquid penetrant, magnetic particle, and industrial radiography.
• Read and interpreted inspection results and isometric drawings.
• Participated in crew coordination at Hess Oil Catalytic Cracker construction project.
Technical Welding Laboratory – Shell Oil DPMC, Deer Park, TX – 2/90 to 9/94
Inspector
• Maintenance Shutdowns
• Baseline Inspections for corrosion/erosion surveys
• Ultrasonic thickness gauging utilizing Krautkramer DME2
• Panametrics 26DL, and Panametrics 26DL Plus
• External inspections of new and in service above ground storage tanks in accordance with API 653
• Valve Call out support for facility
• Criticality run and Inspection work planning.
• Generation and update of Inspection ISO’s and inspection systems
• Field verification of pressure vessels, Storage Tanks, RV’s and Piping
• T/A support (Internal, and external inspections of pressure vessels)
• NDE to include ultrasonic shear wave, straight beam, and thickness gauging, liquid penetrant, magnetic particle, and industrial radiography.
• Read and interpreted inspection results and isometric drawings.
• PSM of in service vessels, classifying pipe, and revising isometric drawings at Catalytic Cracker facility
• Participated in crew coordination at Hess Oil Catalytic Cracker construction project.
TRAINING & EXPERIENCE
• API 510 Tested Certification # 2255
• API 570 Tested Certification # 25188
• API 653 Tested Certification # 26744
• Welding Technology Inspection San Jacinto College, Houston, TX – 7/94
• Computer Aided Drafting, Graphics Engineering
• GED San Jacinto College, Houston, TX – 1986
• Professional Management Training 2/2009
• Certified Basic, Practical Applications and Introduction to Risk Analysis Training
Other Skills
Supervisorial and managerial skills, fluent in English and Spanish, mechanical abilities
Computer Skills
Microsoft Office (Word, Excel, Access, PowerPoint)
Windows
CAPSTONE’s RBMI Software
PCMS