Post Job Free

Resume

Sign in

HFO Power Plant Manager

Location:
Guntur, AP, India
Salary:
Negotiable
Posted:
August 09, 2014

Contact this candidate

Resume:

Peddi Koteswara Rao email:acfas9@r.postjobfree.com

(Power Plant Mech Superintendent) Mobile: +918*********&939-***-****

To

Sub: Application for the post of HFO Power Plant Manager

Am available on immediate basis

Am a Mechanical Engineer with 23 years of experience exclusively in all

mechanical maintenance works related to Engine based Power plants, Marine

propulsion Engines and its support auxiliary equipment running on LFO and

HFO fuel. Out of 23 years I had 6 years overseas experience.

I have 23 years hands on experience in erection start-up operations,

maintenance, Overhauling, fault diagnosis & trouble shooting of large

capacity Diesel Engines up to 10,000 P.S. and its supported Engine room

auxiIiaries, I had worked on the below Engines exclusively used in Ship

main propulsion engines & Power generation Engines of low, medium and high

speed Engines like Skoda, Wartsila, Wartsila Pielstick, I.H.I Pielstick,

Mirrlees black stone, Caterpillar(MAK), and Cummins.

I would like to discuss further suitability to my position at an interview

stage to work in your esteemed organization.

Thanking You.

Place: Guntur

Date: 09-Aug-2014

Yours Sincerely,

[pic]

Peddi Koteswara Rao.

CURRICULUM - VITAE

NAME : PEDDI KOTESWARA RAO

Educational Qualification : Mechanical Engineering (DME)

Father's Name : Hanumantha Rao

Date of Birth : 12-Jun-1969

Permanent Address : S/o Hanumantha Rao

Vunnava Post

Edlapadu Mandalam

Guntur District - 522233

Andhra Pradesh, INDIA

Driving licence (Car & Bike) : DLFAP107123952008 (validity up to 2019)

Nationality : INDIAN

Passport number : L6017461 valid up to Nov 2023 (ECNR)

Computer Knowledge : MS-Excel, Word, project, outlook.

Languages Known : English, Hindi, Telugu, and Kannada.

Marital Status : Married

Height : 175(Cms) 5' and 8".

Weight : 79 Kgs

Work Experience:

1. Black & Veatch Corporation Kabul & Kandahar, Afghanistan (Feb-2011 to

Sep-2013)

Worked as Power Plant Mech Superintendent at USAID KPP & KHPP Power

Projects 105MW HFO power plant and 21MW Diesel Power Plant for Afghanistan

Infrastructure rehabilitation program built and Operated by Black & Veatch

for the Afghanistan National power grid parallel support with fully

automated state of the art technology and PLC & SCADA controls having

18X16CM32C Caterpillar (MAK) Engines and 14x16V4000 M63 MTU's Engines.

Achievements

>Erection and Commissioning of 105 MW CAT Power Plant

>Conversion of Caterpillar diesel Engines into HFO operation to reduce the

Plant Operating Cost

>Simplex Fire Protection system commissioning and tested

>Trained to Local staff's & fresher's with safe work environment

Skills:

>Good communication skills

>Implementation of Permit to work (PTW) and LOTO system

>Providing yearly Budget

>Taking measurement and compare with O.E.M tables

>Knowledge in Computerized Maintenance Management System (MAXIMO)

>Reading and explaining of P&ID diagram

>Work distribution to work men

> Planning for Scheduled maintenance,

>Exhaust heat recovery Thermal oil boilers for HFO heating.

>Update history records for scheduled maintenance.

>Minimize plant break down time.

>Spares inventory, ordering spares and fallow up

>Take own decision on emergency,

.

2. Telesource Fiji Ltd. SUVA, Fiji Islands (Oct 2006 to July-2010)

worked as a Maintenance Engineer at Kinoya & Vuda power stations having

fully automation with PLC & SCADA controls, and un-manned designed of 70 MW

HFO power plant for Fiji Islands National power grid parallel support

equipped with 2X10 MW Wartsila (18v38),2x6MW Wartsila(18V32), 2x5MW

Mirrlees Blackstone and 4X7.5 MW Caterpillar(MAK) (16CM32C),

Achievements

>Commissioning and erection of CAT power plant

>Conversion of Wartsila Diesel Engines into HFO operation to reduce the

Plant operating cost

>Installed Exhaust heat recovery Thermal oil boilers for HFO heating

>On Job training done to Local staff's & fresher's with safe work

environment

Skills:

>Good communication skills .

>Alignments of driven equipments,

>Taking measurement and compare with O.E.M tables

> Implementation of Permit to work(PTW) and LOTO System

>Reading and explaining of P&ID diagram

>Work distribution to work men

>Planning for Scheduled maintenance,

>Update history records of scheduled maintenance.

>Minimize plant break down time.

>Plant scheduled maintenance planning.

>Spares inventory, ordering spares and fallow up

>Take own decision on emergency,

>Providing yearly Budget

3. Fuji Technical Services (P) ltd. Kochi (Feb-2003 to Sep-2006)

Worked as a Sr. Engineer Maintenance of Marine Engines (At Kochi), Offshore

ONGC's flat form (At Bombay high) O&M Servicing and Complete Overhauling of

Engine and Engine room Maritime Assembly Systems (GMBH)

30,000 hrs Overhaul done 2X6CM32 Engines

Caterpillar (MAK)

15, 000 hrs Overhaul done 8CM32 Engines,,

15,000 hrs overhaul done 3X16CM32 Engines,,

30,000 hrs overhaul done 3X16CM 32 Engines,,

36.000 hrs overhaul done 2X 18V38 Engines

Wartsila

40,000 hrs overhaul done 3 x Mk6 major Engines Mirrlees

Black stone.

60,000 hrs overhaul done 3x 18V32 Engines

Wartsila

60,000 hrs overhaul done 9TS 35 Engines

Skoda.

60,000 hrs overhaul done 5x16Pc2V Engines

Pielstick.

The above Engines done O&M, Servicing, Complete Overhauling of Engines and

Engine room equipment's .On Ships, offshore platforms, power generation

power plants etc

Skills:

>Overall responsible of power plant

>Good leader ship qualities.

>Update history records of plant scheduled maintenance.

>Minimize plant brake down time.

>Plant scheduled maintenance planning.

>Spares inventory, ordering spares and fallow up

>Work allocation to work men.

>Taking measurement and compare with O.E.M tables,

>Take own decision on emergency,

4. Vimal Services Ltd Baroda (Feb 2001 to Feb2003)

Worked as a Maintenance Engineer 16PC2V IHI Pielstick Engines,

Skills:

>Good leader ship qualities.

>Overhauling of Engines at workshop which was brought form ship braking

industry

>Update history records of plant scheduled maintenance.

>Minimize plant brake down time.

> Plant scheduled maintenance planning.

>Spares inventory, ordering spares and fallow ups.

>Work allocation to work men.

>Taking measurement and compare with O.E.M tables,

>Take own decision on emergency

5. Sanghi Spinners India Ltd, Hyderabad (Jan1998 to Feb2001)

Worked as Asst Engineer on 27.2MW HFO based power plant with 5x5 MW

Wartsila Pielstick (16 pc 2v) 2.2 MW Mirrlees Blackstone M.K.major 6 with

PLC parallel operation.

6. Nagarjuna Aqua Exports Ltd, Nellore (Jun 1995 to Nov 1997)

Worked as a Generator cum Pump Operator for the sea water intake system for

the 10acres sea water storage pond through 1 KM long Jetty and

the12x7,000m /hr capacity pumps,

7. SS Captive Power Gen (P) Ltd Cuddapa (Sep 1993-Jul 1995)

Worked as a D.G Mechanic on 13.2MW power plant in Zuari cements ltd on

2x3.2MW Wartsila 9R32, 6MW Wartsila 18v32 & 1000KVA Cummins

8. G.P Cotton & oil Products ltd Thimmapuram (Aug 1990 to Aug 1993)

Worked as a D.G operator on 2x1450KVA Skoda, 2x500KVA Skoda, 1095KVA

Mirrlees Black stone and 380,320KVA Cummins

[pic]

Peddi Koteswara

Rao.



Contact this candidate