Curriculum Vitae
ABDUL KHALEEM KHAN
Garsi Street, NELLORE-524001
(A.P) INDIA. +91-949*******
E-mail:- acf9d5@r.postjobfree.com
Post Applied for:- QA/QC ENGINEER / INSPECTOR WELDING
(MECHANICAL)
CAREER OBJECTIVE: Seeking a challenging position to utilize my
Engineering skills and
experience where required most and enhance my
potentials in the
EXECUTIVE SUMMARY: field of Mechanical Engineering QA/QC Welding /
Piping.
CSWIP 3.1, Certified Welding Inspector, with 8
years of experience Welding & NDT Inspection in
QA/QC activities related to Welding/Piping.
Good knowledge on major codes and standards related
to welding,
Piping and NDT inspection.
Hands on experience in verifying and identifying
the issues related
to welding piping and resolving in accordance to
standard.
Ability to understand the WPS & WPQR and
implementing the same.
Good knowledge in understanding and selecting the
PROFESSIONAL QUALIFICATION: related information from the ITP, P&ID and
Isometric drawings and implementing the same.
Ability to understand the Hydro test (Pressure
test) package and implement the same.
Excellent communication and interpersonal skills.
A team player equally effective working
independently or as a part of team.
CERTIFICATION QUALIFICATION: Technically proficient in basic AUTO CAD and
computer.
B.Tech ( Mechanical Engineering)
From CMJ University Meghalaya.
DIPLOMA IN MECHANICAL ENGINEERING.
TECHNICAL KNOWLEDGE: State Board Techanical Education Hyderabad,A.P
CSWIP 3.1 (TWI) Certification Scheme for Welding
Inspection Personnel, the Welding Institute,
Cambridge,London.(UK) Cert no. 40444
Lead auditor ISO 9001:2008(qualified)
Auto cad 2000 (2D)
COMPUTER KNOWLEDGE: ASNT Level II. (NDT. Non Destructive Testing)
UT (Ultra sonic testing)
RT (Radiography Testing)
APPROVAL: MPT (Magnetic Particle Testing)
LPT (Liquid Penetrant Testing)
I am well versed with various NDT's like reviewing
of radiographs, witnessing ultrasonic flaw
detection test, Liquid Penetrant test and Magnetic
particle test.
Ms-Dos, Windows98, 2000, 2008. XP, W7, W8.
Ms-Office (Ms. Word, Ms Excel, Ms PowerPoint)
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY
(SATORP)
CHIYODA PETROSTAR/SAMSUNG SAUDI ARABIA(LTD)
KNOWLEDGE OF: P&ID, Legend of P&ID, Process Data Sheet, PMS, LDT,
Plot Plan, Different Welding Processes,
Development, Distillation Column, RF Pad
Calculation, PT Rating Calculation.
FAMILIAR WITH:
National and International CODES& STDS, ARAMCO STDS
and SATORP Specifications.
STANDARDS & CODES:
The above inspection activities are guided by
various standards and codes like B31.3 PIPING, API
1104, BHEL NDT PROCEDURES API, ASME (Sec - II, V,
VIII Div I, and IX), and ASTM, ANSI and Oil India
Safety Directorate guidelines.
1. NAME OF ORGANIZATION:
PROJECT: UNI-TECH, GENEARLContracting,INDIA.
Power plant Piping Fab & casting.
DESIGNATION:
QC Mechanical / Welding inspector
DURATION:
From 10Th sept 2013 to till to date.
2. NAME OF ORGANIZATION:
PROJECT: Nesma & Partners Contracting Co. Ltd. Al-Khobar,
Saudi Arabia.
DESIGNATION: Jubail Export Refinery & Petrochemical. Delayed
Coker Unit.
DURATION: (PACKAGE #4)
QA / QC Mechanical / Welding & Piping Engineer.
CLIENT:
From 17th July 2011 to 31ST July 2013
CONTRACTOR:
Saudi Armco Total Refining & Petrochemical Company
(SATORP)
PROJECT DESCRIPTION:
Chiyoda Petrostar LTD / Samsung Saudi ARABIA LTD
(CPSA)
Jubail Export Refinery and Petrochemical Project
located in Industrial City, Jubail-2, the eastern
part of Saudi Arabia. The client of the project is
Saudi Aramco Total Refining & Petrochemical Company
3. NAME OF ORGANIZATION: (SATORP). The Delayed Coker Unit Package#4 consists
of 6 Coker Drums in which Residual oil is converted
DESIGNATION: to wet coke by thermal cracking. The EPC Contractor
is Chiyoda Petrostar LTD / Samsung Saudi LTD
DURATION: (CPSA).
CLIENT: Sans Inspection Technologies, INDIA
QC Welding inspector / NDT Co-rd.
4. NAME OF ORGANIZATION: 05TH Apr 2009 to 30st Jun 2011.
PROJECT: PSL Pendurti, Steel plant, Naval Dockyard (VSP).
HPCL VIZAG REFINERY SITE, NTPC RAMAGUNDAM.
DESIGNATION: Petrospect Inspection service, Saudi Arabia.
DURATION: Tasnee petrochemicals, Khurais Aramco Oil & Gas
Plant & Soda chemicals, The company executed
5. NAME OF ORGANIZATION: experience in Pipeline & tank ages.
PROJECT: NDT Inspector/ NDT Co-rd
From 11th Nov 2007 to 16th Jan 2009.
DESIGNATION:
SMS METALLURGICAL SERVICES, Hyderabad, India.
DURATION:
Rolled & Forged shafts for WIDIA India Ltd.
Turbine Shafts, pressure vessels for BHEL projects
etc.
NDT Inspector.
WELDING RESPONSIBILITIES: 13th Aug 2002 to 30st sept 2007.
Approved documents review ITP, WPS, WPQR, PQT and
implementing the same.
Make sure that activities should be done in
accordance with standard codes of practice,
drawings, and applicable job specifications,
Quality control procedures (QCP) and Inspection and
Test Plan (ITP) at the job site.
Submission of Quality Control documents to client
and implementing the same after the approval e.g.
Procedure for control of welding consumable, method
statement and WPS for cracks and other defects and
NDT procedures.
Review of all international standards specified in
project specifications.e.g ASME, AWS, and
ASTM...etc.
Witnessing the welder qualification test.
Receiving Inspection and verification of
consumables.
Verify Positive Material Identification of Low
Alloy Steel, Stainless Steel, Nickel and Copper
based materials.
Control of welding consumables storage, handling,
issuance and condition.
Pre-welding and weld joint fit up inspection,
In-process weld inspection, Inspect welding of
socket joint and seal welding threads, Post welding
visual inspection.
Inspect repairing of weld joints or base metal by
welding prior to weld acceptance.
Selection of weld joints for NDT and verification
of NDE method application and evaluation of
results.
PIPING FABRICATION: Check the weekly production weld status, welder and
project repair rate, welder's repair assessment and
tracer weld.
Post Weld heat treatment inspection and
verification of hardness testing application and
results.
Modification or rework after weld acceptance.
Final welding inspection and submission of
documents (welding summary report/record and weld
map).
Review of inspection Test Plan (ITP) for project.
Stage wise Inspection for piping as per ASME B 31.3
(Process Piping)
Incoming material inspection (Raw steel material &
welding consumables).
Reviewing the approved quality Plans, Manuals and
Scope of work to perform the require inspection.
Performing inspection for piping material storage &
handling for visible damages. For conformity to
specification (size, scheduling, rating, marking,
color code requirements) mill certificates, packing
list material identification and traceability
according to material types (pipe, elbow tee,
reducer, weld-o-let, Nipple, etc).
Verification of Isometric Drawing with respect to P
& ID.
Verify Heat number during incoming material
inspection as per project specification and ASME
standard.
Co-ordinate with as per client/consultant where the
inspection is being carried out and offer any
clarification if required.
Preparing and maintaining various QA/QC documents
and final test packages and review.
Witness of alignment, orientation and dimensions
of install piping.
Witness of flange joint assembly and bolt torque.
Ensure the blinds are removed after hydro testing
and correct rating gasket are installed.
Inspection of flanges face verifacation,gasket,
supports, valves prior to line re-instatement
acceptance as per the latest drawing, codes and
specification standard.
Reviewing piping isometrics drawing and details.
Check all weld sizes, Profile and locations.
Inspection during fabrication and erection such as
Pipe cut length, edge preparation, fit-up, branch
connections, flanged joints, valve connections,
bolt, nuts, washer, gasket and tolerances cleaning
requirements.
Check installed piping components as per piping and
instrument diagrams (P&ID)
Checking Fit-Up, Dimension inspection as per
Isometric drawing,
Inspection for installation of piping at site.
Inspection of Piping supports as per Isometric
Drawings.
Find out the pipe, fittings, and various types of
valves, stud bolt and gasket as per bill of
materials in Isometric drawing by given code.
Conversant with international codes like ASME, BS,
API.
Knowledge of various NDE. Knowledge in preparation
of Inspection Test plan.
Prepare weld mapping of isometric drawings and
NOTE- dimension check of completed spools.
Maintain all fabrication documents as per ISO
standard.
Final inspection of fabrication & installation of
structure & piping ot site.
Ensure examination and test required by the ITP has
been performing with results.
Co-ordinate all NDE and PMI activities with third
party contractors.
Maintain documentation and Traceability of the
material.
Maintain and achieve all documentation related to
quality.
Control of non conformities issuance of punch list.
FATHER NAME: Clearing of punch list and inspection release note.
Making a re-instatement punch list and clearing the
DATE OF BIRTH: N items.
Reviewing of Hydro test Packages.
Punch listing, line checking, System punches,
NATIONALITY: Pre-commissioning
MARITAL STATUS:
RELIGION: The above inspection activities are guided by
various standard & Code. Like ASME (sec-II, V, IX)
ASTM, BSEN, API, Saudi Aramco & SATORP.
LANGUAGES KNOWN:
PASSPORT DETAILS:
PASSPORT NUMBER:
PLACE OF ISSUE:
DATE OF ISSUE:
DATE OF EXPIRE:
ABDUL ALEEM KHAN
KSA Driving License (GCC):
25th MARCH 1982
Driving License (India): INDIAN
Married
Permanent Address:
ISLAM
ENGLISH, URDU. HINDI,TAMIL & TELUGU.
L0045664
(RIYADH)
09/04/2013
08/04/2023
231******* (LMV EXP-2018)
220/DL/2001 (LMV & MCWG)
D.No.19/588, (New 19-1-688)
Garsi Street, Chinna Bazaar,
NELLORE - 524 001
ANDHRA PRADESH, INDIA.
Phone: +918********* (R)
PROFESSIONAL EXPERIENCE
JOB PROFILE AND RESPONSIBLITIES
PERSONAL DETAILS
Declaration: - I assure you that, any responsibility vested to me will be
fulfilled by me to the best of my
capacity.
Place: - NELLORE
Date: - ABDUL KHALEEM
KHAN