KIRIAKOS SKARPAS BEng (Hons) MSc CEng MIET
E-mail: ********@*******.***; Mobile: +974-******** (Qatar)
Languages: Greek (native), English (excellent),
Arabic (beginner), Polish (beginner)
Construction/Commissioning Project Manager (Offshore)
A highly qualified Construction/Commissioning Offshore Project Manager
(Chartered Engineer) with strong abilities in both Electrical & Mechanical
Engineering in addition to a good understanding of Civil Engineering and a
wealth of experience successfully achieving targets in the Project
Management cycle. A confident and determined individual who is energetic
and enthusiastic with a disciplined and organized approach, benefitting
from many years of experience working in the Middle East. With strong
leadership, planning, organizing, problem solving and communication skills,
this dedicated career driven professional will be an asset to the project
management team of any forward thinking organization. Profiting from more
than 13 years solid and proven experience in the construction and
commissioning of HV substations from the start of civil works to
energisation.
ACHIEVEMENTS
V Installed & terminated 16km of 11kV cables connecting 7 HV substations
25% faster than the scheduled duration
V Led a successful confrontation against an issued NCR by the client
resulting in a gain of US$350k for my company
V Successful achievement of the professional registered title of Chartered
Engineer
V Acknowledged multiple times by the client for exceptional performance
V Established excellent communication with client and other contractors
V Established an effective construction monitoring procedure
V Developed a procedure to minimize materials' wastage
V Consistently Met deadlines and milestones
V No Lost Time Incidents during service
V Efficiently planned offshore logistics
EDUCATION
MSc in Project Management University of Sunderland
2003 - 2005
Individual Research Project: "EIA: New Port of Patras, Greece"
MSc in Communications and Signal Processing University of Newcastle Upon
Tyne 2002 - 2003
Individual Research Project: "WLAN performance limits" (IEEE 802.11a,
Hiperlan2)
BEng (Hons) in Electrical Engineering Tech. Educational
Institute of Patras 1994 - 2000
Final Year Project: "Fiber Optics in Lighting"
EMPLOYMENT HISTORY
July 2013 - to date LS CABLE & SYSTEM (Qatar)
Project: EPIC for Power Supply Project through Submarine Cables from Ras
Laffan to Halul (OFFSHORE)
Client: Qatar Petroleum Offshore Consultant: Qatar Petroleum
Offshore Project Value: US$ 440,500,000
Deputy Construction Manager (132kV Substations Offshore)
Halul Island is a storage and export terminal for Qatar marine crude oil
produced from the offshore fields, comprising oil storage tanks, pumping
stations, power generation plants and oil process plants. A new 132/33kV
GIS intake substation will be constructed which will be fed by Kahramaa
132/33kV GIS intake substation on Ras Laffan via two 132kV, 100MW subsea
cables.
Role is to support the Project/Construction Manager in organising, planning
and managing the construction work (Electrical, Mechanical & Civil) for the
132/33kV GIS substation at Raslaffan and Halul
. Responsible for the management of the subcontractors' construction teams
related to the substation construction
. Ensuring that program milestones are achieved and that the schedule is
followed by the subcontractors
. Scheduling and contacting construction and interfacing meetings as per
project requirements with all stakeholders
. Monitoring procurement and material/equipment deliveries with a budget of
$100m
. Managing the interface between 2 subcontractors and 2 other contractors
. Reviewing and commenting on subcontractors' documentation
. Ensuring strict compliance to the HSE regulations
. Acting as the focal point with the client
. Interfacing with the submarine team
April 2006 - June 2013 ARCHIRODON GROUP N.V. (Qatar & Saudi Arabia)
March 2013 - June 2013: EPIC of New Desalination Plant & Potable Water
Storage Tanks at Halul (OFFSHORE)
Client: Qatar Petroleum Offshore Consultant: Qatar Petroleum Offshore
Project Value: US$ 53,120,000
Commissioning/Plant Start Up Manager (Offshore)
Thoroughly reviewed commissioning procedures, process & control philosophy
of the desalination plant, and reviewed the commissioning sequence/logic,
work plan/procedures, pre-task planning, start-up activities and method
statements to ensure comprehensive feasibility and safety
. Developed and executed safe commissioning work processes, operating
testing procedures and guidelines to ensure process safety, operational
safety and plant integrity
. Prepared the commissioning progress report for the client and the
company's higher management
. Ensured the operational integrity of the installations was maintained at
all times
. Issued platform-specific instructions as required to ensure safe
operation
Apr 2011 - March 2013: EPIC of New Desalination Plant & Potable Water
Storage Tanks at Halul (OFFSHORE)
Client: Qatar Petroleum Offshore Consultant: Qatar Petroleum Offshore
Project Value: US$ 53,120,000
E&M Construction Manager (Offshore)
Directed the installation of equipment (see separate appendix for equipment
installed)
. Effectively coordinated E&M section heads, subcontractors, vendors and
design engineers a total of 560 people
. Successfully determined, planned, organized and directed appropriate
offshore construction activities
. Organised logistics coordinating with deliveries on site and on time as
per the construction schedule
. Ensured that construction activities conformed with the safety codes and
offshore plant regulations
. Coordinate the construction activities' schedule based in the design and
procurement outcomes
. Used alternative ways to increase performance and efficiency through
innovative thinking
. Responsible for the safety, quality and productivity of all construction
work activities
. Actively pursued greater collaboration between offshore and onshore teams
Sept 2010 - Apr 2011 Project: EPIC of the Multi-Products Berth at
Mesaieed Industrial City (MIC).
Client: Qatar Petroleum Consultant: Qatar Petroleum
Project Value: US$ 25,247,000
Lead Commissioning Engineer (Oil & Gas)
Mesaieed industrial city accommodates an oil refinery, a fertilizer
complex, petrochemical complexes, natural gas liquids plant and a steel
mill in addition to the oil receiving terminal and export facilities.
Directed the commissioning of equipment (see separate appendix for
equipment installed)
. Prepared and reviewed commissioning procedures, planned, organised and
executed commissioning schedule
. Coordinated vendors' commissioning activities and interlace coordination
with the activities of third parties
. Drove a safety conscious environment through establishing and maintaining
a strong safety culture
. Completed multiple commissioning activities in parallel and on time as
per client's satisfaction
. Managed the preparation of the project dossier
Jan 2009 - Sept 2010 Project: P&I of Electromechanical Services for
Nakilat Ship Repair Yard (Phase 1&2) & Nakilat Ship Construction Facility
(Phase 4) - Port of Ras Laffan, Qatar
Client: Qatar Petroleum Consultant: Royal Haskoning & COWI
Project Value: US$ 135,700,000
Electrical Construction/Commissioning Section Head (Acting Construction
Manager)
Nakilat Facilities are undertaking repair, maintenance and conversion of
very large ships, as well as conversion of specialist ships, including
offshore supply vessels, tugs and coastal tankers.
Heading of the installation and the commissioning of equipment (see
separate appendix for equipment installed)
. Liaised with client representatives and consultant, and coordinated other
contractors to organise work fronts
. Installed & terminated 16km of 11kV cables connecting 7 HV substations
25% faster than the scheduled duration
. Monitored and organised the delivery of the materials/equipment according
to the site requirements
. Ensured that works are as per the AFC drawings, up to the quality
standards and are completed on the scheduled time with the least amount
of cost, and minimal wastage of materials
. Managed project team interfaces and progress with regular review meetings
. Managed the commissioning activities, review commissioning documentation
. Identified design faults and resolved technical problems that arose on
site
. Conducted post project review to determine areas for future improvement
. Established an effective construction monitoring procedure
Oct 2007 - Jan 2009 Project: P&C of Berths Nos. 31 to 35 at the King
Fahad Industrial Port (KFIP)
Client: Royal Commission for Jubail and Yanbu Consultant: Royal
Commission for Jubail and Yanbu (Bechtel)
Project Value: US$ 84,486,000
Lead Site Electrical Engineer/Lead Commissioning Engineer (Oil & Gas)
KFIP handles raw materials such as petrochemicals, refined petroleum
products, liquid petroleum gas products, chemical fertilizers and sulphur.
Construction of five berths to handle petrochemical tankers ranging in
capacity from 3,000 to 80,000 dwt.
Managed the installation & commissioning of equipment for 5 berths (see
separate appendix for equipment installed)
. Led a successful confrontation against an issued NCR by the client
resulting in a gain of US$350k for my company
. Implemented and ensured effectiveness of communication process among
subordinates
. Ensured compliance of the work performed with the project governing
standards
. Reviewed commissioning procedures and O&M Manuals and shop drawings
. Reviewed construction method statements and inspection test procedures
. Implemented and oversaw the Safety, Health, and Security on site
. Participated in weekly progress meetings with the client
. Developed a procedure to minimize materials' wastage
. Prepared the site activities progress report
Apr 2006 - Oct 2007 Project: EPIC of Fuel Gas Desulphurization (FGD),
Jeddah-4 Plant (SWCC)
Client: Saline Water Conversion Corporation (SWCC) Consultant: Electrowatt
Ekono A.G., Switzerland
Project Value: US$ 80,727,000
Site Electrical Engineer/ Commissioning Engineer
Supervised the installation & commissioning of 3 substations & 1 sea water
pump house (see separate appendix)
. Efficiently planned/organized/executed site activities and prepared the
site activities progress report
. Prepared construction materials submittals, method statements and
inspection test procedures
. Organized materials/equipment and workforce in order to maximize
construction progress
. Ensured that all materials/equipment used on site are as per project
specifications
. Prepared commissioning procedures, O&M Manuals and shop drawings
. Distributed manpower efficiently and in an optimized manner
September 2000 - June 2002 HELLENIC NAVY
Petty Officer (Electrical/Commissioning Engineer)
. Gained familiarization with military regulations, rules and the chain of
command
. Acquired technical skills, experience and learned to operate both as a
unit and as a part of a team
September 1997 - August 2000 CH.G. Kritikos S.A.
Client: CH.G. Kritikos S.A. Consultant: Diamantopoulos & SIA E.E.
Project Value: US$ 12,435,000
Site Electrical Engineer/ Commissioning Engineer
. Liaising with the consultant, subcontractors, supervisors, planners,
quantity surveyors and the general workforce involved in the project
. Day-to-day management of the site, including supervising and monitoring
the site work force and the work of the subcontractor
. Ensuring that all materials used and work performed are as per
specifications
. Reviewing the Method Statements and the Commissioning Plans
. Checking plans, drawings and quantities for accuracy
. Acting as a technical adviser for the subcontractors
PROFESSIONAL COURSES
Mechanical Engineering for Non Mechanical Engineers
TUV NORD Academie
Process Plant Start-Up, Commissioning and Trouble-shooting
TUV NORD Academie
Commissioning & Maintenance Inspection & Tests for LV, MV, HV Power Equipt
TUV NORD Academie
Team Leadership: Situational Leadership II Ken
Blanchard Companies
Performance Appraisals
Oxford Consulting
EPC Module: FIDIC Conditions of Contract for EPC/Turnkey Projects
FIDIC
Project Management in Primavera P6
CMCS
Quality Management Systems Lead Auditor ISO 9001:2008 - IRCA Certified
BSI
OSHA 30 hour Construction Safety and Health
OSHA
Managing Safely
IOSH
QUALIFICATIONS
Member of PMI (Membership Number: 2962902)
Member of IEEE (Membership Number: 80738952)
Member of ISA (Membership Number: 33187134)
Member of ASME (Membership Number: 100326765)
Member of Greek Contractor Register
(Membership Number: 34118)
Electromechanical/Industrial Works: C Category
Member of IET, CEng (Membership Number: 97080219)
INSTALLED EQUIPMENT APPENDIX
EPIC of New Desalination Plant and Potable Water Storage Tanks at Halul
(OFFSHORE)
. Substation 11kV, 50Hz
. 400V, 50Hz, Low Voltage Switchgear
. 1600kVA 11/0.418kV 50Hz, Power Transformers
. High Pressure Pumps VSDS 160KW each (4 Units)
. Grounding and Lightning Protection System
. Fire Detection, HSSD and Alarm System
. DC & AC Uninterruptable Power Supply System
. CCTV, PAGA & Access Control
. HVAC System
. (500m & 350m) underwater HDPE pipes as per ISO 21307/ DVS 2207-1
. 8km of GRE pipe as per ISO 14692-4
. Sacrificial Anode Cathodic Protection for the underwater HDPE pipe
sleepers
. Impressed Current Cathodic Protection System for the PWST
. Potable Water Storage Tanks 2500m3 each as per API 650
. Reverse Osmosis Units of 2400m3 daily production each (4 units)
. Power Management System
. De-energisation of 11kV substation
EPIC of the Multi-Products Berth at Mesaieed Industrial City (MIC).
. Substation 6kV, 50Hz
. 3150kVA 11/6KV 50Hz, Power Transformers
. 1000kVA 6/0.415kV 50Hz, Distribution Transformers
. 480V, 50Hz, Low Voltage Switchgear
. Diesel Fire Pumps with Foam System
. 500kVA, 415VAC, 50Hz Emergency Diesel Generator
. Electrical Distribution System for Internal & External Areas
. Uninterruptable Power Supply System
. Grounding and Lightning Protection System
. Fire Detection and Alarm Systems
. Impressed Current Cathodic Protection System for the steel fire water
tanks
. Berth Hydraulic Loading Arms (5 Units)
P&I of Elerctromechanical Services for Nakilat Ship Repair Yard (Phase 1&2)
& Nakilat Ship Construction Facility (Phase 4) - Port of Ras Laffan, Qatar
. 2 Substations 11kV, 50Hz
. 480V, 50Hz, Low Voltage Switchgear
. Grounding and Lightning Protection System
. Fire Detection and Alarm System
. Uninterruptable Power Supply System
. PDMS Plant Design Management System
. 16km of 11kV cables connecting 7 HV Substations
P&C of Berths Nos. 31 to 35 at the King Fahad Industrial Port (KFIP)
. 33kV SF6 Ring Main Unit
. 1600kVA 33/11kV 50Hz, Power Transformers
. 1000kVA 11/0.415kV 50Hz, Distribution Transformers
. 480V, 50Hz, Low Voltage Switchgear
. Grounding and Lightning Protection System
. Impressed Current Cathodic Protection System for reinforced concrete and
piles
. Berth Telecommunication System
. CCTV System with Wireless Video Cameras 3IR Multi Spectral flame detector
. Fire Alarm System with gas, smoke, flame and heat detectors with visual
and manual alarms
. Quick Release Hooks with 100 tonnes rated capacity
. Laser Docking System with large display board
. Service Tower with 2.5 tones lifting capacity hydraulically operated
service crane
. DCS for monitoring and control with graphic display
. Uninterruptable Power Supply System
Fuel Gas Desulphurization (FGD), Jeddah-4 Plant (SWCC)
. 2 Substations 13.8kV, 50Hz
. Substation 4.16kV 50Hz
. 12MVA 13.8/4.16kV 50Hz, Power Transformers
. 315kVA 13.8/0.480kV 50Hz, Dist. Transformers
. 1500kVA 13.8/0.480kV 50Hz, Dist. Transformer
. 2000kVA 13.8/0.480kV 50Hz, Dist. Transformer
. 480V, 50Hz, Low Voltage Switchgear
. Electrical Distribution System for Int. & Ext. Areas
. Uninterruptable Power Supply System
. Grounding and Lightning Protection System
. Fire Detection and Alarm Systems
. DCS for monitoring and control with graphic display
. 13.8kV, 630Amp. Reactors