Donald Shane Shackelford
Miami, Florida 33143
********@*****.***
CAREER OBJECTIVE
I am seeking to obtain a full-time position in the field of construction management, to expand my knowledge
through further experience, and to grow within an organization in which I can be proud to call home.
EDUCATION
Florida International University – Miami, FL
Bachelor of Science in Construction Management GPA: 3.45 (December 2013)
Honors: Dean’s List, Florida Bright Futures Scholarship Recipient (2007-2013)
Certified General Contractor’s License – All testing/certification requirements met,
license applied for 9/18/2014
Obtained OSHA 30 Hour Construction Safety and Health Course
EXPERIENCE
Flagler Global Logistics / Flagler Development
January 2014 – September 2014
Associate Project Manager of Vertical Construction
Assisted in the construction of over $50,000,000.00 in industrial warehouse at Flagler Station (Miami) and
•
The South Florida Logistics Center (Miami)
Served as Owner’s representative for construction projects to over 1.2MM SF of industrial/commercial space
•
Developed initial schedule/cost estimate prior to project start
•
Responsible for drafting, review, and routing of initial AIA contracts between Architects/Contractors
•
Approving AIA G702/G703 (Application and Certificate for Payment) pay requisitions prior to bank approval
•
Managed multiple General Contractors and Subcontractors while ensuring initial construction schedule was
•
completed within the allocated budget and time constraint
Responsible for creating “Authorization for Financial Expenditure” accounting forms and ensuring accurate
•
initial cost estimates
Overseeing Owner-Architect-Contractor meetings and approving various types of change orders as needed
•
Performing bid analysis of potential projects based on historical figure and comparable bids. Analysis
•
primarily based on cost projections and market trends
Responsible for obtaining a Certificate of Occupancy for over 500,000SF of commercial/industrial space
•
Responsible for “Value-Engineering” multiple projects after initial bid, resulting in over 500,000K in savings
•
over a 1 year period
Developed bid analysis “cost matrices” to simultaneously evaluate several bidders while ensuring a timely
•
and accurate recommendation of potential contractors
Managing multiple tenant improvements (Build-outs) ranging from 60K SF to 140K SF simultaneously
•
Responsible for overseeing coordination of all utilities prior to Building’s CO.
•
Procacci Development Corporation – Miami, FL
July 2012 - July 2013
South Florida Regional Property Manager (Miami-Dade County & Broward County)
Managed a portfolio of nine Class “A” commercial office buildings, consisting of over 900,000SF, and assured
•
that the highest building quality standards were met
Organized and maintained an electronic work order management system, inventory management, staff
•
productivity and tenant work requests through www.netfacilities.com .
Ensured that tenant requests were met promptly while limiting disruptions
•
Prepared schedules for all maintenance staff, technicians, and vendors
•
Acquired a “General Services Administration” Clearance to work with tenants, including but not limited to;
•
Homeland Security, Customs and Border Protection, Bureau of Alcohol Tobacco and Firearms, Federal
Aviation Administration, Immigrations and Customs Enforcement, and Federal Bureau of Investigations
Thunder Demolition Inc. – Miami, FL
October 2011 - July 2012
Project Coordinator
Prepared proposals, bid packages and procured bonding
•
Prepared permit packages, obtained and closed permits
•
Coordinated several projects with project manager and owner
•
Maintained schedules by effective communication
•
Estimated job costs based on site visits
•
Coordinated weekly safety meetings
•
Prepared cost analysis reports and ensured accuracy of estimates
•
Donald W. Shackelford P.E. Inc./40Year.com – Miami, FL
January 2006 – October 2011
Project Manager/Drafting Technician/ Permit Expeditor
Documented structural deficiencies in existing structures as well as ensuring that defective components were
•
addressed prior to engineer’s recertification
Created and maintained an inventory of drawings and contract documents using AutoCAD and comparable
•
software
Worked closely with Construction Project Superintendents and on-site building managers while performing
•
inspections using suspended scaffolding for inspections of buildings over 30 stories
Performed special inspector inspections on high-rises over 30 stories
•
SKILLS
Proficient with MS Word, MS Excel, MS PowerPoint as well as MS Project 2010
•
Proficient with Windows and Mac OS, AutoCAD Software, Primavera P8, On-Screen Takeoff
•
Ability to understand and utilize technical charts, blueprints, schematics, flowcharts, etc.
•
Ability to inspect job sites in the field based on plans and specifications
•
Ability to prepare AIA contract documents, permit packages, bid packages, and preliminary estimates, and
•
construction schedules
Speak and write Spanish on an intermediate level
•