Post Job Free
Sign in

Project Manager Mechanical Engineer

Location:
United States
Posted:
September 23, 2014

Contact this candidate

Resume:

Syed Shahid Ali P.Eng

** ******* ****, ********, ******* L6V 2P7

Mobile: 905-***-****) Home: 905-***-**** Email: *************@*****.***

Objective: With exceptional credentials using project scope, cost and schedule in a multi-disciplined

organizational environment I can deliver successful industrial projects from developing user requirement,

scope definition leading to conceptual design, construction, start-up and turn over.

Summary of Qualification

• Bachelor of Degree in Mechanical Engineering.

• Capital programming and facility asset planning to deliver current requirement of the facility and

foresee/plan future requirement of the facility, allocating work and setting goals.

• General knowledge of power distribution system and power substations planning and analysis

based on IEEE, ANSI, CSA, ESA, NFPA and NEMA requirement.

• Proficient in preparing environmental studies/ assessments dealing with Environmental protection

agency and writing Health and Safety policies/ reports to address all relevant clause and

standards.

• Plant and equipment installation, pre-commissioning checks and operational testing of process,

mechanical and electrical instruments calibration/performance testing.

• Developing site procedures, health and safety plan, quality plan, safety procedures and training.

• Design systems from concept to completion in accordance with OBCM, NFPA, ASHRAE and

other relevant codes and standards.

• Expert in project initiation, conceptual and construction design, equipment selection, cost estimation,

feasibilities and reliability solutions.

Work History

Torbear Contracting Inc. Project Manager Nov 2013- To-

date

Reviewing consultant’s specifications and drawings, writing reports, shop drawing reviews, meeting with

consultants and sub trades, writing RFI, getting clarifications and CCO, RFQ, COR, scheduling and

preparing Draws.

Currently working on the following projects:

Project 1: Lorne Park Water Treatment Plant High lift pump installation, stand by power and building

expansion.

Installation of Xylem Horizontal Split Case pumps 35 x 24 WSGD with instrumentation and accessories.

Flow rates=150000 Cu M /day. Head= 97 Meters and Motor power= 2250 KW

Installation of 3 x 3100 KW Caterpillar Diesel Generator set with installation of 27.6 KV indoor

switchgear, 4160 Volts breakers in existing switchgear.

Project 2: Supply and installation of one duty one stand by submersible dry pit sewage pumps of 207 L/S

capacity@ 19 Meters head Supply and install 350 KW prime rated diesel generator. Supply and install

grinder, sluice gate inside the wet well. Construct 200 mm By pass for the station.

Precision Systems Engineering Mechanical Engineer Novemeber-2012-

Nov 2013

Performed fundamental engineering calculations and determine system configuration and capacity.

Designing and coordinate design reviews with other disciplines electrical, structural and architectural.

Defined specifications of all the equipment, Instrumentation and safety measures; incorporating federal,

provincial and municipal statutes/regulations.

Performed PHA making matrix for deviation, causes/consequences, safeguards and recommendation

• Project: Western Lithium Hectatone Organo Clay Plant, Reno, Nevada

Page 1 of 3

Designed and Submitted Organo Clay Plant and work closely on different processing equipment like

thermo- oxidizers, HVAC system, Instrument air system, Nitrogen generators, drag and screw conveyors,

pumps, water and gas system, process flow, electrical and instrumentation of Organo Clay Processing

Plant.

Syed Shahid Ali P.ENG

27 Skelton Blvd, Brampton, Ontario L6V 2P7

Mobile: 905-***-****) Home: 905-***-**** Email: ************@*******.***

Work History Continued:

Global Utilities Canada Manager Technical March 2008

- October 2012

.Leads all engineering activities working in conjunction with contractors, sub-contractors, consultants,

trade partners, project managers, estimators and design architects to expedite high rise construction

maintaining time schedule and cost effectiveness.

-Reviewed and oversee contact drawings and documents during pre- engineering phase, prepared request

for quote and proposals for procurement process.

-Representing Poltec/Cicame products in Ontario and serving supply and installation projects to Hydro

One for pole line hard ware.

-Ensure all trade partners embrace and work in compliance with the Health and Safety Policies required

by OHSAS act and regulation for construction site.

-Attended site construction meetings reviewing schedules/activities associated with Construction ensuring

accurate and current resource information is being disseminated and reported to Field Construction

Director and receive directions.

-Arranged external chemical and physical tests on products submitted by potential vendors, developed

new vendors from China meeting all specifications and standards including OPGW cable.

Engineering Services Manager Operations and Maintenance July 1999 - Feb 2008

Completed multidisciplinary projects; including Pharmaceuticals, Textiles, Cement, Sugar, High rise

building, road and highways, hospitals and hotel facilities through project integration to ensure that the

various project elements were effectively coordinated.

Performed asset management, portfolio planning, capital planning and project management.

Assessed and test quality and quantities delivered by the existing plant, predicting life cycle and

future enhancement plans feasibilities with payback period.

Conversant in formulation and preparation of feasibility reports through site visits, and

understanding of broad parameter. Completed 5000 HP reciprocating gas compressor project with

CAT electric motor.

Manufacturing, installation and erection of waste heat recovery boilers, oil boilers, economizers,

water tube and fire tube boilers.

Performed all calculations including stress and structural analysis, thermal analysis, safety margin

evaluations, vibration analysis, fatigue and fracture analysis.

Well versed with ASME BPVC section VIII 2007 and 2010 and relevant codes and standards.

Other projects completed includes oil and gas pipeline projects, heat tracing, renewable energy,

burning biomass steam boilers, cane cutting units, crystallizers, caustic recovery plants, effluent

treatment plants, reverse osmosis plants, softening plants, demineralization plants, heat

exchangers, power plants and HVAC.

Page 2 of 3

Detailed engineering design documents with specifications on effluent treatment, waste water and

solid waste magement, water treatment plant, power plants and waste recovery units.

Prepared specifications and drawings for tender documents or quotations and conducted tests and

inspection of the products and services.

Professional Development: Registered Professional Engineer Ontario.

Page 3 of 3



Contact this candidate