S hrenik S. Luniya
*** *********** ***, *******, **-14226 P hone: +1-716-***-**** E -mail:
********@*******.***
Objective: Seeking a fulltime opportunity with a company in the field of Mfg. / Quality/ SCM to effectively utilize
my skills in the area of Six Sigma, Material Planning & Process control.
Summary:
• Masters level Industrial engineer with experience in supporting manufacturing operations & Quality
i mprovement
• Experience in employing lean six sigma tools to reduce industrial wastes & increase the productivity
• Ability to determine and establish the most efficient methods for maximum utilization of production
facilities.
• Excellent interpersonal skills, effective oral and written communication skills, reporting, meeting
and analytical skills
• PC proficiency in working with MS Office, AutoCAD and working knowledge of process control
tools & techniques
Educational Background:
M aster of Science i n I ndustrial and systems Engineering
(Expected: Dec’14)
U niversity a t Buffalo, The State University of New York – NY, USA
GPA:3.5/4.0
B achelor of Engineering in Mechanical Engineering
(June’12)
U niversity of Pune, I ndia.
GPA:3.5/4.0
R elevant Coursework:
Graduate courses: Six Sigma Quality, Production Planning and Inventory Control, Quality
Assurance, Design & Analysis of Experiments, Supply Chain & Global Operations, Logistics, Facility
Design.
Undergraduate courses: M achine design, Manufacturing Processes, Automobile engineering,
Refrigeration and Air Conditioning, Structure of machines, Design of machines.
Technical Skills:
• Engineering competencies: Continuous improvement, Value Stream Mapping, SPC, AIAG, APQP and
PPAP, 5S system, DMAIC Implementation, Kaizen Principles, Lean Six Sigma methodologies
I nventory management, PPAP, Capacity Planning, Operations Scheduling, Work force
management/Aggregate planning, G D&T
• Design software: AutoCAD, CATIA, ANSYS, MATLAB
• Desktop software: M S Word, MS Excel, MS PowerPoint, MS Outlook, C, C++
• Packages: MS Visual Studio
• Statistical software: M IN ITAB 16, LogWare
R elated Work Experience:
Executive, Modification section in Business Development Dept., Cranedge (I) Pvt. Ltd, Pune, India
(July’12-June’13)
• Studied the plant layout in reference to material handling for efficient modernization of EOT cranes
• Executed time and motion study on the final assembly line thereby reducing cycle time by 2-4%
and improving working environment thus making the job easier, safer & faster
• Collaborated with the design team to suggest optimum solutions for crane modification
• Implemented DFMEA to identify the failure modes & their consequences, using the product design
• Estimated the costing of the entire project & submitted the Quotation to the client
Engineering Intern, Transmission dept., Force Motors Ltd., Pune, India.
(Jan’11-June’11)
• Executed a root cause analysis to detect the main causes of rejections in crown wheel
• Implemented process FMEA to study gear failure & identify failure mechanisms
• Implemented DMAIC to reduce defects & improve the process in manufacturing saving around
$2500 annually
• Designed & fabricated a Gauge using the Catia V5 R19, for measurement of the bore diameter
and check the concentricity of the bore with the tapped holes of a Crown Wheel
P rojects:
Implementing Six Sigma techniques at M ikey’s Way organization: Six Sigma Quality
(Aug’13-Dec’13)
• Implemented DMA IC methodology approach of six-sigma to define the issues in existing procedure to
optimize the order quantity, quality and service level and implemented Lean methodologies for the
reduction of wastes.
• Acquired & analyzed the data using statistical software M initab & delivered optimal solutions to
i mprove business processes.
• Measured the process using process chart, root cause analysis, Implemented KPIV-KPOV format for
data representation, improved the process & controlled using process FMEA, WHY- WHY analysis &
cause-effect.
• Mapped the current value stream map and future stream map for assuring continuous process
i mprovement.
• Extensively used M ini tab software and after implementing DM IAC, i t resulted in 20% increase in
service levels of organization.
• Improved the response of the organization in limi ted resources from current 22 days to 27 days in a
year
• Incorporated 5S and Kaizen to reduce the setup t ime to organize M ikey’s Way Day
• Performed a customer satisfaction analysis and created a feedback mechanism for the organization.
• Examined the process to determine the non-value added activities and reduced them by almost 30%
A nalysis of safety stock levels at Forbes Ma rshall: Production, Planning & Inv. Control
(Aug’13-Dec’13)
• Out of 1477 i tems used to make boiler 192 i tems were more than required safety stock and 524 i tems
were lesser than the required safety stock
• Rectified the existing safety stock levels by using (Q-R) continuous review model
• Implemented KANBAN system for the bulk i tems
• Reduced the Holding costs and shortage costs which resulted in total saving of $11,300
Statistical Quality Analysis to develop 9V Battery: Quality Assurance
(Jan’14-May’13)
• Achieved the main objective of developing a 9V battery using limited resources & varying main
parameters
• Reduced the variability in the multimeter by conducting Gauge R & R, linearity studies.
• 9V battery achieved by selecting the correct parameters using DOE and CCD
• Ensured the stability & consistency of the battery by determining the process capability & analyzing
control charts
Design & Analysis of Experiments
(Aug’13-Dec’13)
M ini Project 1:
• Achieved the primary goal to formulate a mix that produces a moister cake than the current “super-
moist” version
• Used M initab software and performed A NOVA and D unnett’s test, analyzed the data and residual
p lots
• Recommended the correct cup cake mix that can be int roduced in market against the competitor
M ini Project 2:
• A new lab process was having problems in producing batches of pure material. To be acceptable, there
had to be less than 50 mg of by-product in each batch of 100 gm.
• Used Minitab Software tools like t reatment design of fraction factorial, Alternate factorial and full
fold over design and analyzed the data and residual plots.
• Optimized the parameter settings in order to make the solution acceptable.