RESUME OF EDGARDO A. ALFECHE
Job Objectives:
• Mechanical Superintendent
• Mechanical Maintenance Supervisor
• Mechanical Construction Supervisor
• Mechanical Commissioning Engineer
• Mechanical Supervisor (Rotating Equipment)
• Millwright Foreman
• Millwright Mechanic
• Millwright
• Plant Mechanic
QUALIFICATION:
Bachelor of Science in Mechanical Engineering University of the Visayas
EMPLOYMENT:
November 28, 2012 – July 24, 2014 Mechanical Superintendent
InterAsia Outsource Inc.
FQML Zambia, South Africa
June 6, 2011 – February 2012 Mechanical Maintenance Supervisor
ACGI METAPHIL
Rio Tuba, Palawan, Philippines
February 7, 2011 – June 5, 2011 Mechanical Construction Supervisor
METAPHIL Siana Gold Mining Project
Bad-as, Surigao Del Norte, Philippines
April 21, 2010 – September 21, 2010 Commissioning Engineer
DOOSAN Heavy Industries
KEPCO Power Plant
Colon, Naga, Cebu, Philippines
September 2008 - April 2010 Mechanical Supervisor (Rotating Equipment)
ShellPearl GTL
Project in Ras Laffan
CCIC/ DOHA QATAR
April 14, 2006 - August 28, 2008 Millwright Foreman
QGX LNG Project in Ras Laffan
CCIC/ DOHA QATAR
October 1996 - January 1998 Millwright Foreman
M.S. Alsuwaidi Est. for Contracting
YANBU Albahr IBN Rushed
PT Aromatic Project/KSA
October 1995 - September 1996 Millwright Mechanic
Salcon Power Inc. Phils.
Rehabilitation Project
Colon, Naga, Cebu, Philippines
November 20, 1991 – December 1993 Millwright
Metaphil Inc.
Batangas Expansion Caltex Project
Batangas City, Philippines
April 25, 1988 – May 20 1990 Plant Mechanic
Naga Plant Complex
National Power Corporation
Naga, Cebu, Philippines
EDUCATIONAL ATTAINMENT:
College: University of the Visayas Cebu City, Phil.1983-1991
Course: Bachelor of Science in Mechanical Engineering
Profession: Mechanical Engineer
PERSONAL INFORMATION:
Date of Birth: Feb. 2, 1964
Place of Birth: Siocon, Zamboanga, Del Norte
Citizenship: Filipino
Height: 5’5
Weight: 168 lbs.
Religion: L.D.S (Mormons)
Civil Status: Married
Spouse: Mrs. Rosil Grace D. Alfeche
Mobile No.: +630**********
EMPLOYMENT HIGHLIGHTS
Mechanical Maintenance Supervisor:
November 28, 2012- July 24, 2014
Mechanical Superintendent
InterAsia Outsource Inc.
FQML Zambia, South Africa
Job Description:
• Assigned in Mechanical Installation like Ball mill and Sag Mill gearless drive type and
Rotating Equipment Installation like Pumps and Blower and Compressor. Involved in
Erection and Assembly of Ball mill and Sag Mill Shell and Installation of Sole Plate,
Installation of Main Bearing and Trunion Bearing. Alignment of Main Bearing and
Pumps and Compressors and Blower and doing Assembly. Doing final alignment by
using Laser Machine and dial Gauge.
June 6, 2011- February 2012
ACGI METAPHIL
Rio Tuba, Palawan, Philippines
Job Description:
• Maintenance of Mechanical works in line1 and line2 Ore Prep.
• Overhaul War man Pump and replace all damage spare parts like sleeve bushing, packing,
lantern ring and gasket.
• Maintenance of rotating equipment like bend roller, carrier roller, hanger impact roller
• Alignment of conveyor and rollers
• Alignment of pumps and motor of belt motor pulley
• Alignment of all rotating equipment
• Maintenance of pumps and motor in slurry ore line1 and line2
• Alignment of cycle drive Motor chain drive
• Doing PMS in all rotating equipment like greasing, change oil, and doing inspection for
the equipment.
Mechanical Construction Supervisor:
February 7, 2011 – June 5, 2011
METAPHIL Siana Gold Mining Project
Bad-as, Surigao Del Norte
Job Description:
• Assigned in Tankage Structural and Rom Bin mechanical works and installation of
conveyor structure and motors.
• Assigned in Surge bin.
• Assigned in Sag mill installation of ball mill.
• Assigned in tankage and install platforms and agitator pumps and motors and vibrating
screen.
• Assigned in dilution structure and installation of vessel.
• Responsible of handling 150 people including foreman and leadman.
Commissioning Engineer:
April 21, 2010 – September 21, 2010
DOOSAN Heavy Industries
KEPCO Power Plant
Colon, Naga, Cebu
Job Description:
• Assigned in Naga Power Plant Project as a Commissioning Engineer.
• Assigned in draft system and coal handling system and also in BOP (Balance of Plant).
Mechanical Supervisor (Rotating Equipment):
Sept. 2008 – April 2010
CCIC/ Shell Pearl GTL Project Ras Laffan, DOHA QATAR
Job Description:
• Assigned in GTL(Gas Turn to Liquid)Project Ras Laffan Doha Qatar
• Responsible for lay-out for four foundation Unit# STG-6711, STG-6721, STG-6731
• STG-6741 (Type ST-600 and Siemen)
• Responsible in making preparation for erection and installation of this 4 units
• Installation of adjusting screw for steam turbine according to required elevation
• Installation of padding and sol plate for turbo generator for base frame alignment
purposes
• Responsible for alignment of this unit base frame type by adjusting screw
• Alignment of shaft rotor of the turbine by doing bearing checking and its clearances if it
is in the instruction
• Open main cover of bearing housing and have an internal alignment checking
• Check all clearances and record rearside and frontside of the turbine main bearing and
trust bearing and have an engine blue.
• Have an internal alignment by using dial indicator checking all the reading of records for
reference purposes, if not meet in the tolerance according to protocol adjust and aligned
the bearing housing by using dial indicator
• Rotate the rotor shaft to 360 degrees for checking the alignment, if it is okay install the
load coupling spacer and take axial reading and slowly adjust by tightening the cuopling
bolts
• Start the preliminary coupling alignment of the turbine and turbo generator. After ready
for RFI by QC
• Start for preliminary grout, after ready for final alignment by using three procedure:
reverse alignment method, conventional procedure, and lesser alignment in one at a time
and compare the result
• Responsible for installation and alignment of the lube oil skid
• Responsible for the alignment of pumps and motors for all units of STG-6711,
• STG-6721, STG-6731, and STG-6741 and all condensate pump
• Responsible for erection of oil pipe lines in the turbines for oil flushing
• Responsible for the safety of my people under my supervision and making daily progress
report
Millwright Foreman:
April 14, 2006 to August 28, 2008
CCIC/ QGX LNG Project Ras Laffan, DOHA QATAR
Job Description:
• Assigned in LNG under QGX II Project Ras Laffan Doha Qatar
• Responsible for assembling of module, enclosure and filter house of gas turbine and
compressor for the whole train; train 4 and train 5
• Perform shaft alignment on rotating equipment using dial indicator or laser alignment
• Level and align equipment skids in preparation of setting equipment
• Ability to read, interpret and dimensional information for drawings and specification such
as isometrics, orthographic, P&Ids and equipment arrangements
• Ability to demonstrate the proper use of precision measuring equipment such as
micrometer, calipers, dial indicator, etc.
• Ability to demonstrate proficiency in the basic of measuring lay-out works and cutting
different materials
• Install and maintain oil flush system in preparation of equipment start-up
• Inspect worksite to determine presence of obstructions and sequence of installation to
avoid obstruction and activities of the other crafts
Millwright Foreman:
Oct.1996 to Jan. 1998
MS AL SUWAIDI YANBU AL Bahr
IBN Rushed PTA Aromatic Project KSA
Job Description:
• Assigned in Cyclar Fired heater reboiler and responsible for assembling and installation
of radian panels, boiler tub transition, conviction, plenum of air heater
• Installation & erection of IDF & FDF
• Alignment of FDF & IDF coupling hub
• Supervise the safety condition of all men under my supervision
• Installation and erection of pumps and motor
• Doing preliminary and final alignment, including paralism
• Using conventional procedure alignment, reverse alignment, and graphical method
Millwright Mechanic:
Oct.1995- Sept.1996, Salcon Power Inc. Phils.
Colon, Naga, Cebu, Rehabilitation Project
Job Description:
• Overhauled Gear box of Air Heater Soot blower, extraction check valve main steam valve
• Aligned coupling of boiler feed pump, gear box motor of Air Heater IDF & FDF
• Assigned in Condensate pump & re-alignment coupling hub.
• Overhauled roller bearing of coal mill & repair coal feeder.
• Overhauled multi stage compressors have a bearing checking & re-aligned coupling.
Millwright
November 20, 1991 – December 1993
Metaphil Inc., Batangas Expansion Caltex Project
Batangas City
Job Description
• Installation of Skid Lube Oil Pump
• Check foundation.
• Lay-out marking for centering
• Established padding plates for adjusting screw.
• Grouting.
• Preliminary Alignment
• Final alignment