Post Job Free
Sign in

Injection Molding Quality Control

Location:
Englewood, CO
Posted:
July 14, 2014

Contact this candidate

Resume:

STEPHEN GLAZE

*** *. ******** ******, ******* Springs, Arkansas 71851 C: 870-279-

**** **************@*****.***

SUMMARY

Results-driven, skilled, [supervisor and tech.] focused on achieving

success and increased productivity through improvements in

operations, quality, safety in an injection molding environment.

Experienced in several different injection molding machine and

thermoplastic materials. Strong process skills.

Highlights

* Supervising up to 15 employees 1 material 2

* Experienced in insert molding overmolding

mold setters and 1 process tech. Experience in

gas assist molding insert changes in an

material handling mold set up tech. and

injection molding machine. Knowledge of

process tech. knowledgeable of quality control. 5S

methodology. Experienced injection

IOS 9000 and 9001 molding

machines van dorn, nessei,

Cincinnati Milacron, 2 shot machine, Engel,

toyo, Farrel.

* Material, nylons, abs,

polyethylene hdpe,

polyurethane, polystyrene, polypropylene,

acetal celcon m-90, delrin 500,

polycarb, acrylic,

rubber trp.

EXPERIENCE

Owner

02/2008 to 06/2014

Self-Employed

Nashville, AR

Construction, remodel, painting, landscaping, lawn work, etc.

Head Tech

03/2001 to 04/2008

Engineered Products

De Queen, AR

Improved efficiency and productivity by eliminating waste and

production constraints. Collaborated with the engineering team to

adjust and modify production equipment. Reviewed production orders,

schedules, delivery dates and inventory levels to determine product

availability. Trained, developed and counseled employees to develop

a high performing team. Optimized scheduling based on deep

expertise of machine capacities and equipment. Maintained and

enforced a safe and clean working environment at all times.

Supervisor

03/1995 to 02/2001

Mulay Plastics Inc.

Forrest City, AR

Started a new injection molding plant for Sanyo mfg. We brought 10,

1500 ton machines into the plant and had star and con-air robots

installed on the machines. I was responsible for 15 operators, 2

set up mold setter and 1 process tech. central loading material

system, grinding department and working with the supervisor of the

paint department to insure that parts passed quality control.

Controlled indirect and direct. Improved efficiency and

productivity by eliminating waste and production constraints.

Material Handler, setup mold setter, process tech

01/1988 to 02/1995

Engineered Products

Bossier City, LA

Worked my way from material handler to set up mold setter to

process tech. All aspects of injection molding.

EDUCATION

Center High School

1976

Center, Texas



Contact this candidate