john Roach
**** ******* ***** ( Stow, OH ***** 513-***-**** ( ****.******@*****.***
Personal Statement
> Excel in resolving challenges with innovative solutions, systems and
process improvements proven to increase efficiency, customer satisfaction
and the bottom line through the utilization of Lean/Six Sigma.
> Dedicated and experienced Leader with a passion for developing a high
performance team. I have a proven track record of developing and
maintaining an embedded safety culture.
> Offer leadership by example and hands on training. I have embraced that a
leader is not self-appointed - Leadership is earned from those who
follow.
Key Skills
Team Development & Training Project Management Logistics Management
Lean Implementation Plant Setup Fabrication
Excellent Communication Production Technical Writing
Skills Scheduling Expense Reduction
Quality Assurance - ISO 9001 SAP
Professional Experience
Schaeffler Group/LuK USA, Wooster, OH (Torque Converter Manufacturer)
Mar. 2012 - Present
Lean Manufacturing Engineer
. Facilitate Workshops to reduce changeover times, reduce unplanned
downtime, decrease cycle times, & eliminate non-value added steps in the
process.
. Offer consultation to executives and directors regarding strategic
planning goals and training needs.
. Train Team Members in Lean Manufacturing skills, Mind Mapping, & Hoshin.
. Project Leader for machine installs and work flow enhancements
Aerotek Staffing Agency, Independence, OH (Temp- to -hire at LuK USA)
Oct. 2011 - Mar. 2012
Lean Manufacturing Engineer
. Hands on implementation of 5s standards and best practices.
. Process Analysis and Road Map development.
. Training Lean Principles
JIT Manufacturing, Lebanon, OH (Corrugated Conversion company)
2010 - Apr. 2011
Lean Director
. Managed the daily production schedule, shipping, receiving, maintenance,
& lean implementation
. Authored and implemented SOP's & JSA's.
. Project manager for the install of new equipment and changed the layout
to increase the flow by 100%.
. Sales increased by 40% through productivity and efficiency increases.
. Working manager of maintenance on the equipment.
PrideStaff, Cincinnati, OH (Staffing Agency) 2010
Lean Consultant
. Contracted to evaluate and implement Lean Manufacturing culture for JIT
Manufacturing Co.
. Designed a progressive quality program for the client.
. Mentored several managers on quality and time management for the client.
. Conducted an OSHA safety audit and oversaw the necessary corrections.
McNichols Co., Cincinnati, OH (Steel Service Center) 2007-2010
Operations Manager
. Instrumental in transforming the company's global samples program into an
efficient cost saving tool for the growth of sales.
. Developed efficiency-enhancing workflow/process improvements that made it
possible to drastically reduce overtime and at the same time increased on-
time shipments to 99.4%. Led the team to achieve an error rate below
0.2%.
. Project Lead for the national implementation of 5s and Lean Visual
Factory Management.
. Effectively managed the associates daily requirements, inventory,
logistics, fabrication, and global samples program at a multi-million
dollar steel service center.
. Designed & implemented new fabrication techniques which led to several
large accounts.
. Participated in welding, fabricating, and shipping as necessary.
. Ensured the Associates training and certifications were completed and
documented.
Waltco Truck Equipment, Tallmadge, OH (Liftgate 1997-2007
Manufacturer)
Supervisor
. Supervised the metal processing, welding, assembly, outside process
painting, and logistics for the production of Aluminum Liftgates and
Aluminum platforms.
. Participated in the moving of the Aluminum Division from Burlington,
Wisconsin to Tallmadge, OH.
. Participated in welding and assembly as necessary.
. Developed and motivated employees to meet and exceed the customer demand.
. Led my team to a 30% increase in productivity in the Aluminum Products
Division through value stream mapping, kaizens and demand flow.
. Created several SOP's in the areas of safety and operations for the
entire company.
. My team exceeded 900 days accident free through daily safety messages and
frequent safety training sessions.
. As a member of the Lean/Demand Flow Technology team, I was project
manager on several occasions. One of our accomplishments was strategic
placement of fixtures and tools for the optimization of the team's
efforts.
. Quickly became a trusted advisor for team development ideas and
strategies.
Education
University of Akron 2006
Lean Mastery Certification- Understanding and practical application of Lean
Principles, Lean Tools and Lean Elements. Discussions of Six Sigma. Hands
on completion of value stream maps and Kaizons.
Kent State Stark 2005-2006
Certificate of Supervision- Which included: Team Basics, Problem Solving,
Interpersonal Communications, Changing Conflict into Collaboration,
Motivating Employees, & Managing Discipline.
National Institute of Technology 2001-2002
Personal Computer and Local Area Network Certification- Hands on technical
training in Computer building, repairing, networking, and programing. 960
hours of instruction and labs. Dean's List.
Professional References
Dave Quent Co-worker 330-***-****
Jim Ulm Co-worker 330-***-****
Len Marsden Former Manager 330-***-****