Ali Haydar Acikbas
PERSONAL DATA
Date of birth: 1/6/1948 Bolu -- Turkey
Physical condition: Healthy
Marital status: Married
Children: Two daughters
Language: English (good command of speaking, reading and writing)
Mobile: +90-532-*******
E mail: ***.*******@*****.***
***.*******@*****.***
EDUCATION
University: Istanbul Technical University ( BS and MS in Electrical and Electronic Engineering.)
Graduated August 1973
High School: 19 Mayis Lisesi SAMSUN
Graduated September 1965
WORK EXPERIENCE
A: ENRON INTERNATIONAL USA, PRIZMA Energy USA, ASHMORE Energy International USA,
INTERRAOUS Russia ( June 1997 to Oct. 2013)
(Interraous have share of 100% as a share holder of Trakya Elekt. AŞ. which is a CCGT Plant which has been
constructed on gas turbine technology with a total send – out capability of 478 MW located at Marmara Ereglisi as a
BOT)
1 - Enron Proje Yönetimi LTD E / C superintendent ( June 1997 to July 1997)
2 - Enron Güç Santralları Ltd / SII Enerji ve Üretim Ltd.( O&M Contractor of TRAKYA
ELEKTRİK AŞ.) July 1997 to Oct 2013
(Enron Güc Santralları was %100 owned by Enron International / SII energy is %100 owned by
INTERRAOUS after Ashmore Energy)
1.Engineering and Maintenance Manager (July 1997 to March 2006)
2.Deputy Plant Mng / Engineering and Maintenance Mng (March 2006 to Oct.2013)
B: ZORLU HOLDING/ Zorlu Enerji (July 1996 to March 1997)
1. Plants Manager ( as a Deputy General Mng)
Planning two plants one of which was Çorlu 21 MW Cogeneration Power plant
and the other was BURSA 35 MW Combine cycle Power Plant.
(GE + Siemens consortium)
C: FREE-LANCE ENGINEER September 1994 to July 1996
I was in charge of a project covering a complete plant installation for LEVER INDUSTRIAL TURKEY on
turnkey basis .
This was a joint venture project with the engineering company, named MUGESAN, and I was in fullcharge of
equipment, and construction on site as a Project Manager.
D: IGSAS (Istanbul Fertilizer Company) Izmit; Ammonia, and Urea Complex.(Jan1977- Sept 1994)
1. Instrument Engineer: Nov. 1977 to Jan. 1979
2. Instrumentation Chief Eng.Jan. 1979 to July 1982
3. Instrumentation Superintendent July 1982 to Feb. 1984
4. Maintenance Deputy Manager Feb.1984 to Sept.1988
5. Maintenance Manager Sept. 1988 to Sept.1994
Additional experiences ;some new and revamp projects such as rationalization and switching the raw
material from naphtha to NG projects and also new Compound Fertilizer project.
E: PTT Research and Development Laboratory now known as Teletas/ Istanbul
1. Research and Design Engineer; Sept.1973 to Nov.1977
1