[pic]
Name: MOTURU APPALA SREENU
Mobiles: +91-961*******, +91-944*******
Net: *********@*****.***, *********@**********.***, Skype=ma_sreenu
[pic]
Date OF Birth : 06-Dec-1973
Education Qualification : (1) Diploma (Mechanical)- from year
1991 to 1994 in
Govt. Polytechnic, Visakhapatnam, Andhra Pradesh
(2) BE (MECHANICAL)- from year 1998 to
2001 in Andhra University,
Visakhapatnam, Andhra Pradesh
Additional Qualification : (1) FIRST CLASS BOILER
ATTENDANT CERTIFICATE OF
COMPETENCY-on 03-Aug-2005 from BOARD OF
EXAMINATIOIN, HYDERABAD, ANDHRA PRADESH
(2) CERTIFICATE OF PROFICIENCY AS BOILER
OPERATION ENGINEER (BOE) - FIRST CLASS on
30-Apr-2007 from BOARD OF
EXAMINATON, HYDERABAD, ANDHRA PRADESH
Work Experience
1. SERVICE : JUNE-1995 to SEP-2007
PLANT : 2X32TPH & 1X48TPH WATER TUBE
BOILERS, 2x50MW, Back-
Pressure & Condensing Steam Based Simple
Cycle BHEL Steam Turbine Captive Power
Plant
M/s COROMANDEL FERTILISERS LTD
LOCATION : Visakhapatnam, Andhrapradesh, India
POSITION : SHIFT ENGINEER
KEYSKILLS : Shift In-charge, Operation & Maintenance,
Shift Emergencies,
Compliance Program, Operations in regular
shifts
EMPLOYER : M/s COROMANDEL FERTILISERS LTD
MURUGAPPA GROUP
2. SERVICE : OCT - 2007 to JAN - 2010
PLANT : 1200MW (4X200MW GTG + 2X200MW STG)
Natural Gas-fired
Combined-Cycle Gas Turbine Power Plant,
(CCPP),
Dubai Electricity & Water Authority (L -
Phase II) (DEWA)
LOCATION : Jebel Ali Power Station, DUBAI
POSITION : LEAD COMMISSIONING ENGINEER
KEYSKILLS : Shift Commissioning In-charge, Shift
Emergencies, Personal
Hygiene Safety Procedures, Gas Based
Combined Cycle V94.3A SIEMENS Gas Turbines
and ALSTOM Steam Turbines Shift Operations
EMPLOYER : M/s HYUNDAI Engineering & Construction
Co., Ltd.
Korea
3. SERVICE : OCT-2010 to May-2012
PLANT : 2X384MW, Gas Based Combined Cycle
9FA Frame GE Gas
Turbine, MARK-VIe control
GMR, VEMAGIRI POWER GENERATION LTD
LOCATION : Rajahmundry, Andhrapradesh, India
POSITION : Sr. Commissioning Engineer, M1-B
KEYSKILLS : Testing & Commissioning, Shift In-charge,
Operation,
Shift Emergencies, Compliance Program,
Personal Hygiene, Safety Procedures, Gas
Based Combined Cycle 9FA Frame
GE Gas Turbine & Site Commissioning
Management.
EMPLOYER : L & T Power Ltd
Vadodara, Gujarat, India
4. SERVICE : May-2012 to Oct-2012
PLANT : 2X350MW, Gas Based Combined Cycle
9FA Frame GE Gas
Turbine (MARK-VIe control) & BHEL 2-
Cylinder Steam Turbine (MAX DNA control)
GPPC, (GSPC PIPAVAV POWER CORPORATION)
LOCATION : Pipavav, Amreli District, Gujarat, India
POSITION : SHIFT INCHARGE OPERATIONS
KEYSKILLS : Manage Shift Incharge Commissioning &
Operations
EMPLOYER : SOGEX OMAN,
GSPC POWER PLANT, GUJARAT
5. SERVICE : OCT-2012 to Till date
PLANT : QCCPP( Qurayyah Combined Cycle Power
Plant) Comprises of 6
Indentical Blocks, each Block delivering
net Power Output of 864MW, each Block
comprises of 3 Gas Turbine Generators
(GTGs) + 3 Heat Recovery Generators (HRSG)
+ 1 Steam Turbine Generator (STG), with
(MARK-VIe control) of GE
QURAYYAH COMBINED CYCLE POWER PLANT of
Total Power Generated of 5,184 MW
LOCATION : QURAYYAH, KINGDOM OF SAUDIA ARABIA
POSITION : Sr. COMMISSIONING ENGINEER
KEYSKILLS : COMMISSIONING & STARTUP OF GE-7FA GAS
TURBINE
GE-D11 STEAM TURBINE, PREPARING CCC
PACKAGES etc.
EMPLOYER : AL-ARABIAN BEMCO CONTRACTING CO. LTD,
QURAYYAH COMBINED CYCLE POWER PLANT-
BLOCK#6
QURAYYAH, KSA
Number of Years of Power Plant Experience:
1. 2yrs experience of Commissioning and Operation of 2X200MW STG of
ALSTOM make
2. 2yrs experience of Commissioning and Operation of 4X200MW GTG of
SIEMENS make
3. 2yrs experience of Commissioning and Operation of 2X245MW GTG of GE
4. 12yrs experience of Operation and Maintenance of water - tube boiler
of 110T/H and
2x50 MW STG of BHEL make
5. 7months experience of Commissioning & Operations of 2x245MW GTG of GE
& 2X129MW STG of BHEL make
6. Present experience of Commissioning & Startup of Gas Turbine GE-7FA
& STG-D11 of GE make, and preparing CCC PACKAGES
Role Description:
1. GAS & LFO BOP, Gas Turbine & HRSG commissioning.
2. Planning & Execution of commissioning activities, trials, raising
RFIs, drawing-up punch lists.
3. Supervision of Operation of the plant, including start up, smooth
running & emergency handling.
4. Co-Ordination with the customer & consultant for controlling process
parameters & load distribution regarding any changes in power or
steam consumption.
5. Continuous monitoring of the power plant.
6. Preparation of SOP, Charging procedures & isolation procedures
manuals.
Capacity & Type of BOILER, HRSG, WHRB Commissioning, Operation &
Maintenance experience:
Rating Steam pressure Steam temp Type
BOILER 110 T/H 31 KG/CM2 3150C Water Tube
WHRB 64 T/H 39 KG/CM2 3150C Water Tube
HRSG 425 T/H 104.0 BAR 5640C Water Tube
(NEM,Power
systems,
Netherlands)
HP AUX BOILER 104.0 BAR 5640C Water Tube
(NEM,Power 456 T/H
systems, (in NG fire)
Netherlands)
415 T/H
(in DFO
fire)
HRSG (BHEL, 452 T/H 134.0 Bar 5400C Water Tube
Triple
Pressure with
Re-heat)
HRSG(DOOSAN, 158.9 kg/s 126.9 Bar 5670C Water Tube
Triple
Pressure with
Re-heat)
Capacity & Type of GAS TURBINE & STEAM TURBINE Commissioning, Operation &
Maintenance experience:
Make Frame Power Output
GAS TURBINE SIEMENS V 94.3 A 4X200 MW
(AIR COOLED
GENERATOR)
GAS TURBINE GE 9FA & 7FA 2X245MW
(HYDROGEN COOLED
GENERATOR)
STEAM TURBINE ALSTOM M 30-40 2X200 MW
(AIR COOLED
GENERATOR)
STEAM TURBINE SIEMENS V 50 4X25MW
(AIR COOLED
GENERATOR)
STEAM TURBINE BHEL 2-CYLINDER 2X129MW
(AIR COOLED RE-CIRCULATION
GENERATOR)
STEAM TURBINE GE-D11 2-CYLINDER 6x270MW
(HYDROGEN COOLED RE-CIRCULATION
GENERATOR)
PERSONAL PROFILE
Nationality : INDIAN
Marital status : Married & One son
Permanent Address : 15-11-3/2, Krishna Nagar,
Collector's Office,
Visakhapatnam-530002,
Andhra Pradesh, India.
Phone: +891-*******
Willing to Relocate : YES
Positions Held Previously : COMMISSIONING & OPERATION ENGINEER
Relevant Exp in
POWER PLANTS : 17 Years+
Current location : QURAYYAH COMBINED CYCLE POWER PLANT-
BLOCK#6,
QURAYYAH,
KSA
Passport Details : J 7360594
Date of Issue : 21 - 06 - 2011
Date of Expiry : 20 - 06 - 2021
Place of Issue : VISAKHAPATNAM, INDIA