Objective
Looking forward to work in a competitive environment at a responsible
position where my process experience, technical and analytical abilities
would be put to maximum use with efficiency.
Achievements
Key Projects handled and Commissioning Experience:
. Ethylene Furnace, Gas Cracker at RIL Dahej (Stone Webster
Technology)
. Debottleneck study of Ethylene Plant (Qatar Petrochemical, Qatar)
. EO/EG plant at IPCL, Dahej (Scientific design)
. EO/EG plant at NOCIL, Mumbai (SHELL technology)
. Caustic Soda plant at IPCL, Dahej (Membrane Technology, KRUP UHDE)
. Implemented British Safety Council standard in complex.
. Prepared Safety manual
. LNG FEED project
. Business development for Ethylene, Chlor Alkali and EO/EG process
technology support and DBN study
Professional Work Experience (23+ Years)
PRESENT JOB RESPONSIBILITY:
Working as Assistant General Manager Process Technology Dept for
Ethylene Plants at Ingenero Technology Pvt Ltd Mumbai, where I am heading
the team of Process Engineers of Ethylene plants and contribute towards
performing production calculations, meeting production targets with utmost
importance to HSE, troubleshooting in plant operations, maintaining product
quality and optimizing process to reduce costs of our clients M/S Qatar
Petrochemical Company, RLOC Ethylene Plant at Qatar(Gas Cracker) and JCP At
Al Jubail(Naphtha Cracker).
Analyzing various processes / applications and recommending process
modifications major cost savings strategies, to enhance productivity
operational efficiency.
I continuously monitor performance of equipments and bring out plant
constraints time to time, communicate with discipline engineers and apply
root cause analysis for problem solving. I actively participate in
scheduling and following-up shutdown jobs and start-ups. Other tasks
accomplished include writing Standard Operating Practices (SOP) & updating
them, raising Field Change Orders (FCO) to incorporate modifications for
improved HSE, Productivity and/or Reliability.
Developing business for Ethylene, Chlor alkali and EO/EG process technical
support across the globe.
Ingenero Technology Pvt Ltd, Mumbai (August 2008 to Till date)
Designation: Assistant General Manager Process Technology (Ethylene Plants)
. Analyzing various processes / applications and recommending process
modifications major cost savings strategies, to enhance productivity
operational efficiency.
. Continuously monitor performance of equipments and bring out plant
constraints time to time, communicate with discipline engineers and
apply root cause analysis for problem solving.
. Carried out Debottleneck study of Q-Chem., Qatar Ethylene Plant
. Developing business for Ethylene, Chlor alkali and EO/EG process
technical support and remote monitoring of plants across the globe.
. Process engineering training to Engineers.
Reliance Industries Limited, Dahej (May 2007 to July 2008)
Designation: Senior Manager, Technology (Gas Cracker, EPRU & OSBL Plant)
. Commissioning of 5th Furnace done and production optimized.
. Worked on Debottleneck study of the Ethylene Plant.
. Project member of Naphtha Cracker plant relocation (NOCIL) to Gandhar.
. HAZOP Team member for any MOC
Reliance Industries Limited, Mumbai (Sept 2004, to May 2007)
Designation: Senior Manager, Operations (EO/EG & Naphtha Cracker)
. Re startup of EO/EG and Naphtha Plant at NOCIL after acquiring by
Reliance.
. Updated P & ID's and PFD's.
. Implemented BSC system in Complex.
. Worked in coordination with Technical services to implement Plant
Changes to save energy and improve productivity.
. Pre-commissioning check of instrument logics and trips.
. Carry out Risk assessment for different activity using HIRA (Hazard
Identification and Risk Analysis) guidelines.
. Standard Procedure and Formats for BSC (British Safety Council) audit.
. Troubleshooting: Process variations, breakdowns are always associated
with the production activities. To minimize the adverse effect of
breakdowns on production.
. Safety &Training: To train subordinates regarding HSE (Safety, Health
& Environment) and to follow safety norms are always given the
priority.
. PPR, MIS (Management Information System)
Indian Petrochemical Corporation Limited, Dahej (January 99 to August 04)
Designation: Production Manager (EO/EG Plant)
. Updating of P & ID and PFD.
. Commissioning of EO/EG Plant (Scientific Design, USA)
. Preparation of pre commissioning, commissioning and plant operation
procedures.
. Member of Capex Team of EO/EG.
. Active participation as an Internal Auditor in conducting ISO 9000:
2000, ISO 14001.
. Active team leader in conducting Process safety studies and HAZOP
studies.
. Catalyst loading of EO Reactor and subsequent catalyst conditioning.
Indian Petrochemical Corporation Limited, Dahej (March 96 to December 98)
Designation: Sr. Production Engineer
. Pre-commissioning, commissioning and start up experience of Membrane
Cell Technology Caustic Soda Plant (Membrane Technology, KRUP UHDE
Germany).
. Team leader in the Erection & commissioning of Caustic Flaking and
prilling plant by Bertrams Technology, Switzerland.
. Remembraning and Efficiency test run of Electrolyzers
Century Chemicals Limited, Thane (June 91 to Feb 96)
Designation: Sr. Production Engineer
. Pre-commissioning, commissioning and start up experience of Membrane
Cell Technology Caustic Soda Plant (Denora Technology Italy).
. Member of T Q M (Total Quality Management) Team.
Educational Qualification
Degree : B.Tech. (Chemical Engineering)
Year : 1990
Computer Skills
. Operating Systems Windows, DOS
. Software awareness MS Office, Hysys, Aspen Plus & HTRI
Professional/Industrial Training
. Training in scientific design EO/EG plants at oxiteno, Brazil and
scientific design new jersey USA.
. Underwent training in Caustic Flaking and prilling plant at Bertrams,
Switzerland.
. Attended training course on DCS-TDC 3000 TATA Honeywell, Pune.
. Attended training course on SAP Basis and PP module, conducted by RIL.
. Hysys and Aspen Plus Software for Process simulation.
. Pinch Technology.
. Interpersonal skills.
. Process Safety Management.
. Hazop
. Presented Technical paper on Ethylene furnace run length improvement in
AIChE global meet 2014 at New Orleans, USA