EXPERIENCE SUMMARY
A Supply Chain Management Professional(Contracts Administrator) having University
Engineering and Business degrees backed with 10+ years’ experience in negotiating,
developing, maintaining and implementing contracts mainly f or large/major construction
projects
Handled successfully the Rajasthan State Electricity Board (RSEB) `s EPC BOOM (Build,
Own, Operate, Maintain) project worth equivalent CAD750 Million in Kalpataru Power
Transmission Limited(KPTL), Gandhinagar, Gujarat, India
Certified Member (MCCM Cert) of International Association for Contract and Commercial
Management (IACCM), U.S.A.
Trained & Experienced SAP (MM&PtA) professional; proficient in Microsoft Office
EMPLOYMENT
06/12 – 01/14
Project Contracts Administrator
SNC Lavalin ATP Inc. Calgary, Canada
Received and studied in depth the Proposal to Provide Services(PPS) from the client -
Altalink Management Limited (AML) for the project assigned
W as entirely responsible for sourcing the Construction Services mainly for Altalink
Management Limited (AML)’s portfolio
Received Scope of Work (SOW s), technical specifications and standards, drawings if
applicable from Engineering Department
Generated Bidders list by using the Craft CAT Software, prepared the milestone schedule
in conjunction with Construction Department
Sought budget figures from the relevant Cost Controller(Project Controls)
Prepared Bid packages (Commercial and Technical) by coordinating amongst
Construction, Scheduling, Project Control, Legal and Finance departments
Issued Addenda before the bid close date
Sent the technical portion of the bids to Engineering department and prepared the Bid
Analysis and Recommendation (BAR) along with Bid Analysis Summary
Received clients approval f or awarding the contract, issued notice of award followed by
the contract to the chosen subcontractor
Got counter signed the contract, got committed the contract value in PM+ system
Monitored progress of the contract against the milestone schedule by attending the
weekly contract meetings, reviewing the weekly field reports etc.
Verified invoices and cleared them; W as responsible for the change orders/amendments
Handled claims and closed out contracts at an appropriate time
10/11 – 03/12
Project Construction Cost Estimator
Syncrude Canada Limited (SCL) Calgary, Canada
Checked the Requisition Request in Toto from respective Project Manager(s)
Conveyed the discrepancies to the respective Project Manager(s) in the received
Contd…..2
requisition requests
Page 2 Tiratth Pandya 403-***-****
Entered the Requisitions in SAP in Materials Management & Project to Asset modules
Generated SAP reports f or higher management to review on daily/weekly basis
Sent the SAP requisition request to the Project Initiation team (PIT) f or its approval
Coordinated with the assigned Delegation of Authority (DOAG) personnel in order to get
approved the SAP requisition, coordinated with respective buyer for the purchase order
W orked as a single point of contact amongst the PM, PIT, DOAG, Buyer and Vendors
Performed cost estimating and impact analysis of the Change Notices
Ensured that costs are in alignment with the estimate's work breakdown structure(WBS)
Documented estimates to provide supporting information including the estimate basis and
assumptions and supported requests for information after estimates are closed
01/09 – 04/11
Senior Contracts Administrator
Advatech Engineers Ahmedabad India
Prepared all contractual documents for the clients and sub contractors
Analyzed contract amendments, trends, costs, revenues
Checked all contractual docum ents and verified their compliance
Updated all costs, risks and performance related to contract
Informed project staff and sub-contractors about any contract amendments
Added legal comments to the sales order or purchase order when required
Handled the invoices from supplier and invoiced to customers
Responsible for the over all coordination of the assigned project(s)
Booked the change orders and amendments; updated the planned cost as indicated by
the Project Managers
Entered the change order revenue in the sales order with the planned costs
Responsible for contracts close out and changing the status of the project in its life cycle
07/08 – 12/08
Quality Assurance Engineer
Plygem Cal gary Alberta
Updated the Quality Charts on the daily basis
Generated the Quality Reports daily and circulated to the Top Management for their daily
review followed by a meeting
Filled in the Relevant Quality Formats and circulated the same amongst the concerned
departments; was overall responsible for the Quality Related Documentation
Issued the work orders, handled the entire contract management procedure
Completed the entire order execution including various stage inspections; final
inspections and third party inspections
07/03 – 03/08
Project Contract Administrator
Nu Vu Con Air Pvt. Limited Ahmedabad India
Coordinated activities with other departments to prepare budget tenders, RFP`s and pre
qualification documents
Maintained the pro-forma contracts and documents
Arranged for the opening of sealed tenders
Prepared the commercial evaluations of tenders, issued the Bid Analysis and
recommendations (BAR)
Finalized the agreements, prepared formal contract documents for signature by the client
and sub contractor
Administered the contractual execution of the contract
Maintained logs on correspondence, change orders, requests from the sub contractor,
Contd….3
back charges, contract amendments and notices
Page 3 Tiratth Pandya 403-***-****
Processed contractor requests for progress billing, reviewed for accuracy of the request
prior to the issuance to cost control
Verified and cleared the invoices and requests for release of hold back and final payment
Final closed out of the contract and evaluation of contractor performance
Maintained the contract files
07/01 – 06/03
Junior Project Contract Administrator
T ransformers and rectifiers [India] limited Ahmedabad India
Handled the entire Contract cycle in SAP (Bidding to Project Close out i.e. Pre-Award
and Post-award)
Issued Bids to selected Bidders (Commercial+Technical)
Issued Addendum when applicable, Attended the pre-bid and negotiation meetings
performed Bid Analysis and Recommendation(BAR)
Issued Letter of Intent (LOI) followed by W ork Orders to the subcontractor
W as responsible for the successful execution/administration of the service construction
contract, Attended Stage/ final and third party inspections
Sent progress billing to the subcontractor(s)
W as responsible for Change orders/amendments (Change Management)
Processed invoices, Claims and close outs
W as single point of contact in between suppliers and clients
Handled the EPC project of supply, installation, commissioning of power plants
Handled the ISO Documentation, surveillance and Final Quality Audits
07/00 – 04/01
Management Trainee-Marketing
Kalpataru power transmission limited Gandhinagar India
Prepared the Bidder’s list, Contract Schedule(Milestone) after receiving Scope of Work
along with other relevant technical documents from Design/Engineering department
Prepared Bid packages (Commercial and Technical) by coordinati ng amongst Project
Management, Construction Management, Scheduling, Project Control, Legal, Finance
Issued addendum as and when required, Prepared the Bid Analysis and
Recommendation (BAR)
Issued Notice of award followed by the contract to the chosen subcontractor
Monitored execution of the service construction contracts against the milestone schedule
by attending the weekly contract meetings, reviewing the weekly field reports etc.
Verified invoices and cleared them; Was responsible for the change orders/amendments
Handled claims and closed out contracts at an appropriate time
W as one of the representatives from marketing department in SAP implementation
Attended the stage inspections, final and third party inspections
Handled the BOOM (Build, Own, Operate, Maintain) and BOOT (Build, Own, Operate,
Transfer) EPCM project(s) worth more than equivalent CAD750Million
EDUCATION
North Gujarat University Patan India
Business Degree (MB.A.) May 2000
Sardar Patel University Vallabh Vidyanagar India
Engineering Degree (B.E.-Electrical) August 1997
The Engineering and Business Degrees/Credentials were evaluated and declared
equivalent to the Canadian standards by the World Education Services (WES), Canada.
Contd….4
Page 4 Tiratth Pandya 403-***-****
PROJECTS/WORK SHOPS
Asea Brown Boveri [ABB], Vadodara, India 03/99 – 05/99
Underwent summer project in “Production Part Approval Procedure”
06/99 – 03/00
Videocon International Limited, Gandhinagar, India
Pursued a comprehensive project on the “SWOT [Strength, Weakness, Opportunity, and
Threat] Analysis”
03/00 – 05/00
Tata Consultancy Services [TCS], Ahmedabad, India
Conducted a “Market Research” Project for Company’s upcoming product named “Ex
Next Generation-an Accounting Software”
MEMBERSHIP
Full Member- International Association for Contract & Commercial Management
(IACCM), U.S.A. (Valid till 29.06.2014)
Member- Indian Institute of Materials Management (Membership Number: 4856AM)
which is also a charter member of the International Federation of Supply Management
(IFPSM), U.S.A.
Member-Indo-Canada Chamber of Commerce
Member-All India Management Association